Sap Projects 1. Implementation Projects 2. Support Projects 3. Rollouts 4. Upgrades 5. Archiving 6. Developments / Enhancements
Sap Projects 1. Implementation Projects 2. Support Projects 3. Rollouts 4. Upgrades 5. Archiving 6. Developments / Enhancements
Sap Projects 1. Implementation Projects 2. Support Projects 3. Rollouts 4. Upgrades 5. Archiving 6. Developments / Enhancements
1. Implementation projects
2. Support projects
3. Rollouts
4. Upgrades
5. Archiving
6. Developments / Enhancements
Implementation
SDLC
ASAP Methodology –
1. Project Planning
2. Project Chart
3. Preparation of Scope document (SOW- Scope of work)
4. Project Team Skill Development, Recruitment of Consultants
5. Formation of Steering committee.
6. Implementation or defining the Project standards
SAP has defined a business blueprint phase to help extract pertinent information about your
company that is necessary for implementation. These blueprints are in the form of
questionnaires that are designed to probe for information that uncovers how your company
does business. As such, they also serve to document the implementation.
Each business blueprint document essentially outlines your future business processes and
business requirements. The kinds of questions asked subjected to the particular business
function
R- reports
I – Interfaces
C – Conversions
F – Forms
W – Workflow
7. Level 1 Training
Phase- 3 – Realization
With the completion of the business BLUE PRINT in phase 2, “functional” experts are now ready
to begin configuring SAP.
1) 1) Your SAP consulting team helps you configure your baseline system, called the baseline
configuration.
1) 2) Your implementation project team fine-tunes that system to meet all your business and
process requirements as part of the fine tuning configuration.
The initial configuration completed during the base line configuration is based on the
information that you provided in your blueprint document. The remaining approximately 20%
of your configuration that was not tackled during the baseline configuration is completed
during the fine tuning configuration.
Fine tuning usually deals with the exceptions that are not covered in baseline configuration.
This final bit of tweaking represents the work necessary to fit your special needs.
Configuration Testing-
With the help of your SAP consulting team, you segregate your business processes into cycles of
related business flows. The cycles serve as independent units that enable you to test specific
parts of the business process. You can also work through configuring the SAP implementation
guide (IMG). A tool used to assist you in configuring your SAP system in a step by step manner.
Knowledge Transfer-
As the configuration phase comes to a close, it becomes necessary for the Project team to be
self-sufficient in their knowledge of the configuration of your SAP system.
Knowledge transfer to the configuration team tasked with system maintenance (that is,
maintenance of the business processes after Go-live) needs to be completed at this time. In
addition, the end users tasked with actually using the system for day-to-day business purposes
must be trained.
1. Baseline configuration
2. Unit testing
3. Preparing Configuration documents
4. Integration testing scripts
5. Integration Testing
6. Preparation of User manuals
7. Level 2 training
8. Preparation of UAT scripts ( UAT – User acceptance test)
9. RICEFW developments and testing
10. Readiness with Quality server for Final preparation
11. Transport the TR’s to Quality
12. Upload Sample data in Quality
13. User acceptance test in Quality server by users and signoff
14. Readiness of PRODUCTION Server
As phase 3 merges into phase 4, you should find yourselves not only in the midst of SAP
training, but also in the midst of rigorous functional and stress testing.
Phase 4 also concentrates on the fine tuning of your configuration before Go-live and more
importantly, the migration of data from your old system or systems to SAP.
Workload testing (including peak volume, daily load, and other forms of stress testing), and
integration or functional testing are conducted to ensure the accuracy of your data and the
stability of your SAP system. Because you should have begun testing back in phase 2, you do
not have too far to go until Go-live.
The Go-live milestone is itself is easy to achieve; a smooth and uneventful Go-live is another
matter altogether. Preparation is the key, including attention to what-if scenarios related not
only to the individual business processes deployed but also to the functioning of technology
underpinning these business processes and preparation for ongoing support, including
maintenance contracts and documented processes and procedures are essential.