50% found this document useful (2 votes)
884 views7 pages

001B Method Statement Form - Internal Glazing

This method statement outlines the procedures for installing an internal glazing spider system at the Mediclinic ANH@ Khalifa Street project. It details the responsibilities of those involved, materials required, safety precautions, and step-by-step installation process. Skilled workers will fabricate and install aluminum sections per approved drawings, lift glass panels into place using chain hoists, and secure them with spider accessories, nuts, bolts, and silicone. Proper personal protective equipment and safety measures will be followed to complete the work safely and per specifications.

Uploaded by

Junaid C.K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
884 views7 pages

001B Method Statement Form - Internal Glazing

This method statement outlines the procedures for installing an internal glazing spider system at the Mediclinic ANH@ Khalifa Street project. It details the responsibilities of those involved, materials required, safety precautions, and step-by-step installation process. Skilled workers will fabricate and install aluminum sections per approved drawings, lift glass panels into place using chain hoists, and secure them with spider accessories, nuts, bolts, and silicone. Proper personal protective equipment and safety measures will be followed to complete the work safely and per specifications.

Uploaded by

Junaid C.K
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

METHOD STATEMENT FOR

(Internal Glazing - Spider System)

PROJECT NAME: : MEDICLINIC ANH@ KHALIFA STREET

DOCUMENT REF. NO: : ATS-MMF-55130-MS-040

REVISION NO: : 00

SUBMISSION DATE: : 09-Apr-2019

NAME SIGNATURE DATE

PREPARED BY: : IBNU SUBAIR 09-Apr-2019

REVIEWED BY: :

APPROVED BY: :
Main Contractor: AL TAYER STOCKS LLC
Subcontractor: M/s DELTA METAL WORK L.L.C

Work to be Performed: Internal Glazing Spider System Page 2 of 7

TABLE OF CONTENTS

Sr. No. Contents Page

01 Scope & Objective 3

02 References 3

03 Responsibilities/ Supervision 3

04 Procedure/ Method to be Employed 3&4

05 Plant & Equipment 4

06 Manpower Requirement 4

07 Material Requirement 4

08 Housekeeping 4

09 Control of Safety & Health Hazards 4&5

10 Training 5

11 Required PPE 5

12 Documentation 5

13 Distribution 5

14 Method Statement Check List 6&7

QR.N-25B/R-00
Main Contractor: AL TAYER STOCKS LLC
Subcontractor: M/s DELTA METAL WORK L.L.C

Work to be Performed: Internal Glazing Spider System Page 3 of 7

1.0 SCOPE & OBJECTIVE


The scope of this Method Statement covers the Installation of Louver Panels at Mediclinic Al Noor
Hospital Basement, Ground and Upper Ground floors. And this method instruction shall be considered
void for any other related work unless approval is acquired from the authority specific to the project.

2.0 REFERENCES
Approved Shop Drawing
ATS-AUH-MDCA-55130-200-FRE-004
ATS-AUH-MDCA-55130-200-FRE-001
ATS-AUH-MDCA-55130-200-FRE-002
ATS-AUH-MDCA-55130-200-FRE-003

3.0 RESPONSIBILITIES / SUPERVISION


a) Project Manager (Esper Riad Al Shammas) shall have the overall responsibility of the project for
execution, quality and safety. He shall maintain the planning progress and co-ordination of works.

b) Project/ Site Engineer (Esper Riad Al Shammas)shall be responsible for monitoring of the day-to-
day activities on site, for materials, drawings, testing & commissioning and allocation of resources to
work areas on site. They shall report to the Project Manager.

c) Supervisors/ Charge Hands (Ibnu Subair) shall be directly responsible for the day-to-day job at site,
for coordinating of work with skilled and unskilled labor or any other staff assigned in his area.

d) QA/QC Department will be overseeing the quality requirements and quality control measures for the
project in coordination with Project/Site Engineer(s).

e) Safety officer shall be responsible for the health & safety aspects on site as per the Main contractor
and safety Manual. Safety Inspector will be present at all times of job execution.

4.0 PROCEDURE / METHOD TO BE EMPLOYED


4.1 GENERAL
 Approved drawings and work procedures shall be obtained prior to start the activity.
 Aluminum sections shall be fabricated as per approval and shop drawing.
 Materials shall be factory powder coated and delivered to site well protected to prevent any
damage on any part or powder coating.
 All the materials delivered to the site shall be as per the approved materials.
 Any damaged sections of aluminum shall not be used and shall be removed immediately from
the site.
 Ensure floor tile and paint works are complete and prior to start of aluminum installation works.
 Check list and ITP shall be strictly followed for all activities as per approved method statement.
 All the necessary PPEs shall be provided and worn by the all the crew involved with the
activity.
 Waste management guidelines shall be adhered to in disposing off all the waste.
 Only skilled installer shall carried out the work.
 Access requirements including scaffolding shall be installed as per safety requirements and
where required as prior.
 Materials shall be shifted to storage in respective floor manually, with care to prevent damage
to assemblies and other installations.

QR.N-25B/R-00
Main Contractor: AL TAYER STOCKS LLC
Subcontractor: M/s DELTA METAL WORK L.L.C

Work to be Performed: Internal Glazing Spider System Page 4 of 7

 Glass Removal works to be performed as per approved Method Statement ATS-MMF-55130-


MS-038.

4.2 INSTALLATION
 Ensure that all opening size as per approved shop drawing.
 Setting out shall be complete as per approved shop drawing.
 Check the alignment with adjacent work before proceeding the Installation Work
 Fin Glass to be fixed with the Existing fin Glass connection from Concrete Ceiling using spider
accessories.
 Spider Accessories for the Glass Panel to be connected to the Fin Glass Using SS bolts and
Nuts.
 Chain Hoist (Certification provided) to be hanged on the steel scaffolding.
 Special additional support to be provided to the scaffolding for the Lifting purpose.
 Glass Catcher to be fixed to the Glass Panel then using the nylon belt glass catcher & Chain
Host will be connected.
 Slowly pull the chain to lift the glass to the up stair.
 Glass Panel to be fixed the spider system using SS nut bolts.
 Silicone will be applied after fixing the bolts.
 Marking & cutting the area in floor to fix the Dorma Floor Machine.
 Floor machine to be fixed with screws and cement.
 Door Patches to be fixed to Glass Panel & Glass doors.
 Connect the Glass using door patches and Floor Machines.

5.0 PLANT & EQUIPMENT


 HILTI Drill Machine with Concrete Drill Bit
 Drill Machine with Drill Bits
 Glass Catcher
 Screw Driver, Sprit level, Plastic & Steel Hammer
 Cutting Grinder
 Aluminum Cutting Machine
 Steel Cutting Machine
 Chain Hoist & Nylon belt (Certification provided)

Note: All Electrical equipment’s will be PAT tested

6.0 MANPOWER REQUIREMENT


Manpower requirements like site Engineer, Supervisor / Foreman, Technicians, and Skilled Workers
depends upon the approved construction program.

7.0 MATERIAL REQUIREMENT


 12 mm Clear Temper Glass
 SS Spider Accessories, Nuts & Bolts
 Dowcorne Clear Silicone
 Door Patches
 Dorma Floor Machine

8.0 HOUSEKEEPING
Housekeeping will be done on daily basis, and scrap other wastage of demolitions and others will be
collected in containers, and disposed.
QR.N-25B/R-00
Main Contractor: AL TAYER STOCKS LLC
Subcontractor: M/s DELTA METAL WORK L.L.C

Work to be Performed: Internal Glazing Spider System Page 5 of 7

9.0 CONTROL OF SAFETY & HEALTH HAZARDS



Contractor’s approved Project Health & Safety Plan & the Company’s safety guidelines shall
be strictly followed for all the activities described in this method statement.
 Material Safety Data Sheet shall be made available at site and the contents conveyed to the
working screw.
 Work shall be performed in well ventilated condition.
 PPE mentioned below shall be used
 Contractors Safety Department shall be pre informed about the schedule of the Execution and
all Safety requirements adhered to strictly
 Safety related instructions from the Company’s safety department shall be followed as and
when received
 Regular safety instructions shall be shall be given to workers in order to minimize any chances
of accident or mishap
 Regular housekeeping shall be performed to keep the area clean.
 All debris shall be removed from the site and disposed off to the designated areas.
 Aluminum waste and demolition waster shall be stored in containers and disposed
10.0 TRAINING

All operatives are adequately trained to carry out required tasks.

Toolbox talks will provide general training and awareness for each activity and also in health &
safety matters and precautions.
 If deemed necessary specific team / individuals will undergo further training and awareness
programs for this activity by the Project QA-QC Departments.
11.0 REQUIRED PERSONAL PROTECTIVE EQUIPMENT
1. Safety Helmet
2. Safety Harness
3. Foot Protection
4. Hand Protection
5. Safety Glass
6. High Visibility Vest
7. Protective Clothing
12.0 QA/QC DOCUMENTATION
The ATS ISO Form(s)/ Test Report (s) shall be used to verify the above activities to ensure that the
above activities are carried out as per the contract requirements.
13.0 DISTRIBUTION
The copy of this method statement shall be issued to the following:
a) Client
b) Project Manager: ATS
c) Project/ Site Engineer: ATS
d) QA/QC Engineer: ATS
e) Safety Officer: ATS

14.0 ATTACHMENT
 Risk Assessment
 Inspection and Test Plan (ITP)
 Checklist
QR.N-25B/R-00
Main Contractor: AL TAYER STOCKS LLC
Subcontractor: M/s DELTA METAL WORK L.L.C

Work to be Performed: Internal Glazing Spider System Page 6 of 7

Method Statement Checklist


COMPLIANCE
ITEM COMMENT
(Yes / No / NA)
1. Heading & Documentation Layout
Company Details - Address, Tel. & Fax No's & E-mail YES
Title - What task(s)? + Ref No YES
Project Contact Details, YES
Location of Works - General & Specific YES
Name of Company + Phone No YES
Start Date & Duration of Works YES
Page & Paragraph Numbers YES
Company Details - Address, Tel. & Fax No's & E-mail YES
Title - What task(s)? + Ref No YES
Project Contact Details, YES
2. Description
General Scope of Works YES
Sequence - Explanation of Operation(s) / Process('s) YES
3.Resources
No of Personnel - for Task(s) / Operation / Process YES
Plant / Equipment /Tools to be used YES
Transportation , Delivery & Collection Procedure-Traffic
N/A
Management
4.Control Measures to be used
Induction Training + Task Specific Training? YES
Permits - Hot Works, Areas of High Risk, etc YES
Hazard Signage - Specific Tasks as required YES
Access & Egress - Security/ Signing In & Out YES
5.PPE and Water & Temp Accommodation Facilities
Type(s) of PPE to be used YES
Office (if req'd), Canteen, Rest Room, Drying Room, etc. N/A
6.Emergency Arrangements
First Alder - Name, Position + Contact Details N/A
First Aid Kit - Availability & Location YES
Special / Specific Rescue Procedures required N/A
7.Protective System/ Measures
Temp Systems - What/Who provided by? (Fire Points, Elec,
YES
Water)
Safe Guards - Barriers, Fencing, Screens, etc. YES
Others - Site Personnel / Occupiers /Visitors / Public No
8.Risk Assessment & Notise Monitoring
Individual Task(s) + Related Hazards N/A
Persons affected No
Risk Rating - Probability x Consequence YES
Control Measures - Each Individual Task(s) YES
Assessor's - Name, Position + Signed & Dated YES
Inspection Monitoring Required for Task(s)? YES
9.COSHH Assessment + Storage & HF Liquids & Gases
Relevant Safety Data Sheets Method Statements Risk
N/A
Assessments
Hazardous Substances / Materials / Liquids / Gases N/A

QR.N-25B/R-00
Main Contractor: AL TAYER STOCKS LLC
Subcontractor: M/s DELTA METAL WORK L.L.C

Work to be Performed: Internal Glazing Spider System Page 7 of 7

Designated Storage for COSHH Items and Gas Cylinders N/A


10.Monitoring & Compliances
Supervisor - Name, Position + Contact Details YES
Assessor's - Name, Position + Signed & Dated YES

QR.N-25B/R-00