100% found this document useful (2 votes)
4K views2 pages

Qa/qc Checklist Internal Plastering

The document provides a checklist for plastering activities with sections on tasks before, during, and after plastering. It includes items to check such as completion of preceding work, surface preparation, material availability, and curing arrangements. Safety checks are also listed such as ensuring trained workers, providing fall protection like guardrails and toe-boards, controlling loads on work platforms, and maintaining housekeeping. The checklist aims to ensure plastering work is done correctly and safely.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
4K views2 pages

Qa/qc Checklist Internal Plastering

The document provides a checklist for plastering activities with sections on tasks before, during, and after plastering. It includes items to check such as completion of preceding work, surface preparation, material availability, and curing arrangements. Safety checks are also listed such as ensuring trained workers, providing fall protection like guardrails and toe-boards, controlling loads on work platforms, and maintaining housekeeping. The checklist aims to ensure plastering work is done correctly and safely.

Uploaded by

yash shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

INTEGRATED MANAGEMENT SYSTEM Doc. No.

:
FORMATS Rev No.:
INTERNAL PLASTERING Rev Date:
Page No. -1- of

PROJECT : LOCATION : DATE :

SUB LOCATION:

Name of Contractor
A CHECKLIST PRIOR TO PLASTERING
YES NO N.A.
1 Check for COMPLETION OF PRECEDING ACTIVITIES like fixing
of Service Conduits, Water Supply & sanitation lines,
Door frames, window sills etc.
2 Check for RAKING OF MASONRY JOINTS and HACKING ON RCC
SURFACES.
3 Check for availability of material required for the Plastering
4 Check the Plaster pads are fixed & thickness is OK
5 Check fixing of Chicken mesh is completed, where required

Engineer Engineer
Contractor Beacon Associates

B CHECKLIST DURING PLASTERING


1 Check for Mortar mix proportion & proper MIXING of Mortar.
2 Check for completion of Ceiling plaster prior to plastering of walls.
3 Check for true level surface, right angle, plumb, straight edge,
sharp corners?
4 Is mortar being consumed within the initial setting time of cement

Engineer Engineer
Contractor Beacon Associates
C CHECKLIST AFTER PLASTERING
1 Is the DATE OF PLASTERING marked on the SURFACE?
2 Check for CURING ARRANGEMENTS.
3 Check for SUFFICIENCY OF CURING for SPECIFIED PERIOD.
D SAFETY CHECKS

1 Check and ensure employees deployed for Plastering works shall be


trained experienced and screened before they are placed at site.

2 Check for proper access and work platform with guardrail shall be
provided for this work
INTEGRATED MANAGEMENT SYSTEM Doc. No.:
FORMATS Rev No.:
INTERNAL PLASTERING Rev Date:
Page No. -1- of

PROJECT : LOCATION : DATE :

SUB LOCATION:

Name of Contractor
3 Check the Guardrail shall be with a Toe-board of minimum 100mm
height to prevent fall of Construction materials, Trowel, etc.

4 Check the Construction materials shall be hoisted using Rope and pulley
arrangement

5 Check that the Work-platform shall not be overloaded with materials and
men.

6 Check the Construction materials shall be so stored on the platform that


they do not fall down and do not create tripping hazard.

7 Check the housekeeping and ensure no electrical cable is lying on the floor
and all the cables are routed overhead

Remarks:

Engineer Engineer
Contractor Beacon Associates