25% found this document useful (4 votes)
5K views1 page

Ups Checklist

The document provides a checklist for maintenance of an uninterruptible power supply (UPS) cabinet. It includes steps to check that the UPS is working properly and any errors reported, the condition of the UPS including indicator lights, wiring, and pest infestation. It also lists tests to check status indicators, perform diagnostics like self-tests and calibration, and review configuration settings for output voltage, transfer levels, and last battery replacement. The checklist is to be completed by maintenance staff and any comments noted.

Uploaded by

Awais Jalali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
25% found this document useful (4 votes)
5K views1 page

Ups Checklist

The document provides a checklist for maintenance of an uninterruptible power supply (UPS) cabinet. It includes steps to check that the UPS is working properly and any errors reported, the condition of the UPS including indicator lights, wiring, and pest infestation. It also lists tests to check status indicators, perform diagnostics like self-tests and calibration, and review configuration settings for output voltage, transfer levels, and last battery replacement. The checklist is to be completed by maintenance staff and any comments noted.

Uploaded by

Awais Jalali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Attachment E

(Attachment E)

Cabinet # UPS Maintenance Checklist


Performed
Description of Check Status Date Comments
By
-Contact TOC Operator
-Is the UPS Working Properly (Any errors reported by APC network Card?)?

-Check Condition of the UPS

-Are proper indicator lights on

-Is the unit wired properly

-Is there evidence of pest infestation

Computer Interface Testing

-Status

-Runtime

-Input Voltage

-Output Voltage

-Battery Capacity %

-Battery Voltage

-Load Power % in Watts

-Diagnostics

-Self-Test

-Calibration Result

- Configuration

-Line Setting

-Output Voltage

-High Transfer

-Low Transfer
-General

-Last Battery Replacement

Contact TOC Operator

You might also like