This document is a front sheet for drawings and diagrams submitted by Nuovo Pignone S.P.A for a stabilizer overhead compressor for the BP Vietnam Nam Con Son Gas Project. It includes information such as the document title, number of pages, supplier order number, supplier's own document number and revision date. The front sheet is submitted for review and acceptance by BP Vietnam and does not relieve the supplier of contractual obligations.

Uploaded by

berry Mike
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views229 pages

Drop Rod Run Out Data PDF

This document is a front sheet for drawings and diagrams submitted by Nuovo Pignone S.P.A for a stabilizer overhead compressor for the BP Vietnam Nam Con Son Gas Project. It includes information such as the document title, number of pages, supplier order number, supplier's own document number and revision date. The front sheet is submitted for review and acceptance by BP Vietnam and does not relieve the supplier of contractual obligations.

Uploaded by

berry Mike
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 229

BP VIETNAM NAM CON SON GAS PROJECT

SUPPLIERS FRONT SHEET (FOR A4/A3 DOCUMENTS ONLY)

DOCUMENT Cross Section Drawings/Exploded View Diagram with Parts List

TITLE .

TOTAL No. OF PAGES


(INCLUDING FRONT SHEETS)

SUPPLIER ORDER No.

SUPPLIERS APPROVAL NAME


SUPPLIERS OWN DOCUMENT No. REV. DATE
AND SIGNATURE

. . . .

SUBMITTED FOR :
BP VIETNAM NAM CON SON GAS PROJECT
INFO REVIEW

REVIEW DOES NOT CONSTITUTE SUPPLIER NAME : Nuovo Pignone S.P.A


ACCEPTANCE OF DESIGN DETAILS,
CALCULATIONS,TEST METHODS OR
MATERIALS DEVELOPD OR SELECTED PACKAGE DESCRIPTION :
BY SUPPLIER, NOR DOES IT RELIEVE
CONSTRUCTUAL OR OTHER OBLIGATIONS. Stabiliser Overhead Compressor

1. REVIEWED AND ACCEPTED.


WORK MAY PROCEED.

2. PLEASE RESUBMIT DOCUMENT TAG NOS : MODEL


AFTER RESOLVING OUR COMMENTS. TYPE NOS:
WORK MAY PROCEED ON BASIS OF
REVIEW COMMENTS.

3. NOT ACCEPTABLE. WORK MAY NOT


PROCEED.

LIFE CYCLE CODE : A SDRL PRIME CODE : D01


NAME: DATE:
PURCHASE ORDER NO. SDRL CAT. SEQUENCE NO. ISSUE

SIGNATURE:
8382-3201-PM115A D 006 01
9741402
9741402
(Separate files)

8382-3201-PM115A-D001
8382-3201-PM115A-D002
8382-3201-PM115A-D003
8382-3201-PM115A-D004

8382-3201-PM115A-D005
18/03/05 JOB ORDER 2840614 (ORIGINAL JOB 1002663)

PART LIST SNO9741402

SPO67797
18/03/05 JOB ORDER 2840614 (ORIGINAL JOB 1002663)

PART LIST SNO9741402