Currnt Transformer Testing Procedure
Currnt Transformer Testing Procedure
• Physical Verification
• Insulation Resistance Test
• Polarity Test
• Ratio Test
• Winding Resistance Test
• Magnetizing Characteristics Test
Testing Procedure:
1. PHYSICAL VERIFICATION
i. Check for Installation of Current Transformer as per
Manufacturers Recommendation, Approved Drawings.
ii. Check for Physical Damage
iii. Check for Oil leakage, Cleanliness, Earthing –
Equipment/Structure Earthing.
iv. Check the Interconnection between Mechanical Cubical and
Control Cubical
2. Between Secondary:
3. POLARITY TEST:
4. RATIO TEST:
2. Connect the primary injection kit between the terminals P1 and P2.
3. Check initially the current injection unit is zero, and then injects
20% current of actual ratio; by using tong tester check the primary
current value and note down the reading.
4. By using leakage tester check the secondary current value and note
down the reading.
6. The calculated ratio value should be the actual ratio value of CT.
3. If secondary having more than one core, check the other core also by
connecting (1S1-1S3, 1S1-1S4 etc.,)
4. Tabulate the reading; check the value is similar for all the three phases.
2. Inject the voltage from lower value till the voltage mentioned and note
the mille amps current.
3. Knee point voltage is that for 10% rise in voltage there will be 50%
rise in current