Radiography
Radiography
Radiography
RADIOGRAPHIC INSPECTIO
Client : SHELL EASTERN PETROLEUM PTE LTD A-STAR Report N
Pipe
Film Identification Joint No Spot Pipe Size
Thk/Sch
8"-P22086-11011-IM-25 B
QVD Form No : NA
OFD : 21.7
Welder
Welding Process Interpretation Result Remarks
No.
NAD ACC
NAD ACC
Reviewed / Approved By UTOC Reviewed / Approved
RADIOGRAPHIC INSPECTIO
Client : SHELL EASTERN PETROLEUM PTE LTD A-STAR Report N
Pipe
Film Identification Joint No Spot Pipe Size
Thk/Sch
8"-P13048-11011-IM-013 B
QVD Form No : NA
OFD : 21.7
Welder
Welding Process Interpretation Result Remarks
No.
NAD ACC
NAD ACC
Reviewed / Approved By UTOC Reviewed / Approved
RADIOGRAPHIC INSPE
Client :PT. TRANSALINDO EKA PERSADA A-STAR Re
Interpreted by :
Date: Date:
Legend NAD : No Apparent defect LOF : Lack o
ACC : ACCEPTED CR : Crack ICP : Incomp
REJ : REJECT POR : Porosity TI : Tungs
Pb : LEAD UC : Under Cut BT : Burn T
EI : Elangated Indication LOP : Lack of Root Penatration SL : Slag In
1. This report shall not be reproduced except in full, without the written approval of A-STAR Testing & Inspection(s
2. The results reported here in have been performed in comply with the requirements specified in relevant accred
Request No : RFI-T-(V--A)/A-STAR/TEP/001
Specification : HSCP-717-DWG-2001A/B/C
Acceptance Criteria : UW 51 ASME VIII Div. 1, 2017 Edition
: 4" X 15" SFD :490 mm
:FUJI IX100 OFD : 38 mm
: Pb Density : 2-4
: Butt Weld Sensitivity : 0.78 %
: ASTM 1B Page No : 1 of 1
Date: Date:
LOF : Lack of Fusion ROC : Root Concavity
ICP : Incomplete Penetration EP : Excess Penetration
TI : Tungsten Inclusion SP : Spatter
BT : Burn Through MM : Mismatch
SL : Slag Inclusion GP : Gas Pore
g & Inspection(s) Pte Ltd.
relevant accreditation standards ISO/IEC 17025.
PAGE 01 OF 01