Radiography

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

A-STAR TESTING & INSPECTIO

No.30, Tuas View Place , Link Point Pla


Tel: (65)62616162 / 93829286 / fa
Email: [email protected] / Websit

RADIOGRAPHIC INSPECTIO
Client : SHELL EASTERN PETROLEUM PTE LTD A-STAR Report N

Address : PULAU BUKOM, SINGAPORE Date of Inspectio

Project : SLACK WAX EXPORT PROJECT Procedure

Request No : UE-SEPL-RT- 1 Acceptance Crite

Location : UTOC WORKSHOP QVD Form No

Piping Class : 11011 Contractor No

Material : CS Film Size : 4" X 10"

Type of Source : Ir-192 Screen Type : LEAD SCREEN

Strength : 20.7Ci Technique : DWDI

Sources Size : 3.1mm Weld Type : BUTT WELD

IQI : DIN : 10-16 FEE

Pipe
Film Identification Joint No Spot Pipe Size
Thk/Sch

STEAM TRACER DACO EXPORT 35 A ½" 3.7mm

8"-P22086-11011-IM-25 B

WPS NO. P1-001A C


Radiographer : MOHAN Approved Signatory Reviewed / App
LEVEL II NDT LEVEL III
Interpreted by : A.AKILVANNAN
PCN RI LEVEL II

Date: 12/02/2017 Date: 12/02/2017 Date:


Legend NAD : No Apparent defect LOF : Lack of Fu
C : Crack ICP : Incomplete
ACC : ACCEPTED Por : Porosity TI : Tungsten I
REJ : REJECT UC : Under Cut BT : Burn Throu
EI : Elangated Indication LOP: Lack of Root Penatration SL : Slag Inclus
1. This report shall not be reproduced except in full, without the written approval of A-STAR Testing & Inspection(s
2. The results reported here in have been performed in comply with the requirements specified in relevant accred
ING & INSPECTION (S) Pte Ltd
ce , Link Point Place Singapore 637876
2 / 93829286 / fax: (65)62616163
.com.sg / Website: www.astartesting.com.sg

PHIC INSPECTION REPORT


A-STAR Report No : ATI-CSL-SEPL-UTC-S-RT-616

Date of Inspection : 11-2-2017

Procedure : ATI- QCP- RT-082 (Rev: R2)

Acceptance Criteria : ASME B31.3 (Edition 2012)

QVD Form No : NA

Contractor No : UE-SEPL- 61017

Film Type : Type I AGFA D4

: LEAD SCREEN Density : 2.5 ~ 2.8

: DWDI SFD : 457.2

OFD : 21.7

: DIN : 10-16 FEEN / SOURCE SIDE Sensitivity : RW14/VW14

Welder
Welding Process Interpretation Result Remarks
No.

27660 GTAW NAD ACC

NAD ACC

NAD ACC
Reviewed / Approved By UTOC Reviewed / Approved

LOF : Lack of Fusion ROC : Root Concavity


ICP : Incomplete Penetration EP : Excess Penetration
TI : Tungsten Inclusion SP : Spatter
BT : Burn Through MM : Mismatch
SL : Slag Inclusion GP : Gas Pore
esting & Inspection(s) Pte Ltd.
d in relevant accreditation standards ISO/IEC 17025.
PAGE 01 OF 01
A-STAR TESTING & INSPECTIO
No.30, Tuas View Place , Link Point Pla
Tel: (65)62616162 / 93829286 / fa
Email: [email protected] / Websit

RADIOGRAPHIC INSPECTIO
Client : SHELL EASTERN PETROLEUM PTE LTD A-STAR Report N

Address : PULAU BUKOM, SINGAPORE Date of Inspectio

Project : SLACK WAX EXPORT PROJECT Procedure

Request No : UE-SEPL-RT- 1 Acceptance Crite

Location : UTOC WORKSHOP QVD Form No

Piping Class : 11011 Contractor No

Material : CS Film Size : 4" X 10"

Type of Source : Ir-192 Screen Type : LEAD SCREEN

Strength : 20.7Ci Technique : DWDI

Sources Size : 3.1mm Weld Type : BUTT WELD

IQI : DIN : 10-16 FEE

Pipe
Film Identification Joint No Spot Pipe Size
Thk/Sch

STEAM TRACER DACO EXPORT 29 A ½" 3.7mm

8"-P13048-11011-IM-013 B

WPS NO. P1-001A C


Radiographer : MOHAN Approved Signatory Reviewed / App
LEVEL II NDT LEVEL III
Interpreted by : A.AKILVANNAN
PCN RI LEVEL II

Date: 12/02/2017 Date: 12/02/2017 Date:


Legend NAD : No Apparent defect LOF : Lack of Fu
C : Crack ICP : Incomplete
ACC : ACCEPTED Por : Porosity TI : Tungsten I
REJ : REJECT UC : Under Cut BT : Burn Throu
EI : Elangated Indication LOP: Lack of Root Penatration SL : Slag Inclus
1. This report shall not be reproduced except in full, without the written approval of A-STAR Testing & Inspection(s
2. The results reported here in have been performed in comply with the requirements specified in relevant accred
ING & INSPECTION (S) Pte Ltd
ce , Link Point Place Singapore 637876
2 / 93829286 / fax: (65)62616163
.com.sg / Website: www.astartesting.com.sg

PHIC INSPECTION REPORT


A-STAR Report No : ATI-CSL-SEPL-UTC-S-RT-627

Date of Inspection : 11-2-2017

Procedure : ATI- QCP- RT-082 (Rev: R2)

Acceptance Criteria : ASME B31.3 (Edition 2012)

QVD Form No : NA

Contractor No : UE-SEPL- 61017

Film Type : Type I AGFA D4

: LEAD SCREEN Density : 2.5 ~ 2.7

: DWDI SFD : 457.2

OFD : 21.7

: DIN : 10-16 FEEN / SOURCE SIDE Sensitivity : RW14/VW14

Welder
Welding Process Interpretation Result Remarks
No.

31847 GTAW NAD ACC

NAD ACC

NAD ACC
Reviewed / Approved By UTOC Reviewed / Approved

LOF : Lack of Fusion ROC : Root Concavity


ICP : Incomplete Penetration EP : Excess Penetration
TI : Tungsten Inclusion SP : Spatter
BT : Burn Through MM : Mismatch
SL : Slag Inclusion GP : Gas Pore
esting & Inspection(s) Pte Ltd.
d in relevant accreditation standards ISO/IEC 17025.
PAGE 01 OF 01
PT. ASTAR TESTING
Komp.Puri Mas Blok B No.1
Tel: (0778) 7068299 /
Website: www.ast

RADIOGRAPHIC INSPE
Client :PT. TRANSALINDO EKA PERSADA A-STAR Re

Customer :UNITED ENERGY PAKISTAN Request N

Address : Jalan Kerapu, Tanjung Sengkuang , Batam Date of Ins


Project : RAJANI COMPRESSION -PHASE IV Procedure
Job No : T-556 Specificati
Location : Batam Acceptanc
Material : CARBON STEEL Film Size : 4" X 15"
Type of Source : Ir-192 Film Type :FUJI IX10
Strength : 10 Ci Screen Type : Pb
Sources Size : 3 X 2 mm Weld Type : Butt Weld
Technique : SWSI (Panaromic) IQI : ASTM 1B
Film Identification /
Joint No Spot Thickness
DWG NO/LINE NO
T-556 (V2501-A) JCS01 0-12 38 mm
`12-24
24-36
36-48
48-60
60-72
72-84
94-96
96-108
108-120
120-0
Radiographer : Reviewed By

Interpreted by :

Date: Date:
Legend NAD : No Apparent defect LOF : Lack o
ACC : ACCEPTED CR : Crack ICP : Incomp
REJ : REJECT POR : Porosity TI : Tungs
Pb : LEAD UC : Under Cut BT : Burn T
EI : Elangated Indication LOP : Lack of Root Penatration SL : Slag In
1. This report shall not be reproduced except in full, without the written approval of A-STAR Testing & Inspection(s
2. The results reported here in have been performed in comply with the requirements specified in relevant accred

FORM NO : ATI/QCP/RT/01 Rev.01


AR TESTING & INSPECTION
Blok B No.12 Batam Centre – Batam
7068299 / Fax: (0778) 7068299
: www.astartesting.com.sg

HIC INSPECTION REPORT


A-STAR Report No :004/TRSL/ATI/RT

Request No : RFI-T-(V--A)/A-STAR/TEP/001

Date of Inspection : 01 March 2019


Procedure : ATI-QCP-RT-082 Rev 06

Specification : HSCP-717-DWG-2001A/B/C
Acceptance Criteria : UW 51 ASME VIII Div. 1, 2017 Edition
: 4" X 15" SFD :490 mm
:FUJI IX100 OFD : 38 mm
: Pb Density : 2-4
: Butt Weld Sensitivity : 0.78 %
: ASTM 1B Page No : 1 of 1

Welder No Welding Process Interpretation Result Remarks

AB 226 GTAW NAD ACC One Film


AC 432 SMAW NAD ACC per cassett

SAW NAD ACC Single Wall


NAD ACC viewing

NAD ACC Exposure


Arrangeme
NAD ACC
nt-
NAD ACC A
NAD ACC
NAD ACC
NAD ACC
NAD ACC
Reviewed By Reviewed By

Date: Date:
LOF : Lack of Fusion ROC : Root Concavity
ICP : Incomplete Penetration EP : Excess Penetration
TI : Tungsten Inclusion SP : Spatter
BT : Burn Through MM : Mismatch
SL : Slag Inclusion GP : Gas Pore
g & Inspection(s) Pte Ltd.
relevant accreditation standards ISO/IEC 17025.

PAGE 01 OF 01