XX X XXXX XX XXXX - Tank Foundation 45m Dia X 25m High On Earthen Bund Foundation
XX X XXXX XX XXXX - Tank Foundation 45m Dia X 25m High On Earthen Bund Foundation
XX X XXXX XX XXXX - Tank Foundation 45m Dia X 25m High On Earthen Bund Foundation
CLIENT
PROJECT MANAGER
Project Name
DOCUMENT
TANK FOUNDATION CALCULATION
DESCRIPTION:
TK - 602, TK 604, TK - 609, TK - 610.
DOCUMENT NUMBER
Type Discipline Job SJ Sequence Format PAGES
A4 1 OF 14
TANK FOUNDATION
Client Logo CALCULATION Contractor Logo
TK - 602, TK 604, TK - 609, TK
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
RECORD OF REVISIONS
416079232.xls
Page 2 of 14
TANK FOUNDATION
Client Logo CALCULATION Contractor Logo
TK - 602, TK 604, TK - 609, TK
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
416079232.xls
Page 3 of 14
TANK FOUNDATION
Client Logo CALCULATION Contractor Logo
TK - 602, TK 604, TK - 609, TK
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
1) The foundation load data has been taken from the document no -
2) The base pressures, Sliding and Overturning are calculated for the following conditions.
d ) Check for Overturning resistance, => Resisting Moment / Overturning moment ≥ 1.5
Long term and short term settlement of tanks shall be as per keller doc no -
Engineering fill below foundation etc. shall be as per soil investigation report no -
416079232.xls
Page 3 of 14
TANK FOUNDATION
Client Logo CALCULATION Contractor Logo
TK - 602, TK 604, TK - 609, TK
- 610. Contractor Name
416079232.xls
Page 4 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
LOADING FROM TANK FOR FOUNDATION DESIGN
STABILITY CHECKS
Condition - 1
Operating weight + wind Pressure :-
Operating weight = W = 18382.00 T Total down ward force = 18292.00 T
Wind up lift force = 90.00 T Moment due to wind = 2117.00 T m
416079232.xls
Page 4 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
Condition - 2
Fabrication weight + wind Pressure :-
Fabricating weight = W = 406.1 T
Wind up lift force = 90.00 T
Total down ward force = 316.10 T
Moment due to wind = 2117.00 T m
Condition - 3
Hydrotest weight :-
For Hydrotest, there is no moment and lateral force so no need to check sliding and
overturning.
Condition - 4
Operating weight + Seismic
416079232.xls
Page 5 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
1100 1100
416079232.xls
Page 6 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
Total Shell load on annular plate = Wt = 2827.36 T
CL
1.100 m
32.905 m
32.700 m
30.705 m
1.100 m
1.100 m 1.100 m
32.91 m
16.45 m 16.45 m
416079232.xls
Page 7 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
Stress induced on annular plate due to self weight = Wt / Aa = 3.13
Stress induced on annular plate due to liquid weight = W / Aa = 22.60
Total = 25.73
1.732
80 + 22.5 = 102.5 1
2000
EL + 3.75
21.070 T/m2 30
416079232.xls
Page 8 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
8028 23.57 m. ID
39.83 m. OD
wind
M = 2117
W
1100 1100
416079232.xls
Page 9 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
Weight of Liquid on tank bottom plate = 32.7 ² x π / 4 x 25 x 1 = 20995.46 T
Bottom plate wt. = 62.45 T
Total = W = 21057.91 T
CL
1.100 m
32.905 m
32.700 m
30.705 m
wind
M = 2117
1.100 m
1.100 m 1.100 m
32.91 m
25.39
30.39
16.45 m 16.45 m
416079232.xls
Page 10 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
1.732
80 + 22.5 = 102.5 1
416079232.xls
Page 11 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
2000
EL + 3.75
21.410 T/m2 30
8028 23.57 m. ID
39.83 m. OD
Seismic
M = 23608
W
1100 1100
416079232.xls
Page 12 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
A=p(D )/4 =
o
2 850.38 m 2
CL
1.100 m
32.905 m
32.700 m
30.705 m
Seismic
M = 23608
1.100 m
1.100 m 1.100 m
32.91 m
-0.02
416079232.xls
Page 13 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
55.80
16.45 m 16.45 m
416079232.xls
Page 14 of 14
TANK FOUNDATION
CALCULATION
Client Logo TK - 602, TK 604, TK - 609, TK Contractor Logo
- 610. Contractor Name
Job No. : Doc. No. : - - - 00- Rev : 0 Date :
1200
1.732
80 + 22.5 = 102.5 1
2000
EL + 3.75
24.890 T/m2 30
8028 23.57 m. ID
39.83 m. OD
416079232.xls
Page 15 of 14
Contractor Logo
Contractor Name
Load
Mt
Mt
Mt
Mt
Mt
Mt
Mt-m
Mt
Mt-m
Mt
mm.
mm.
mm.
mm.
416079232.xls
Page 16 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 17 of 14
Contractor Logo
Contractor Name
T/m2
m.
416079232.xls
Page 18 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 19 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 20 of 14
Contractor Logo
Contractor Name
T/m2
m.
416079232.xls
Page 21 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 22 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 23 of 14
Contractor Logo
Contractor Name
T/m2
m.
416079232.xls
Page 24 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 25 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 26 of 14
Contractor Logo
Contractor Name
416079232.xls
Page 27 of 14