1.0 Purpose & Scope
The Method Statement has been specifically created for the supply, fabrication
and installation of Insulation & cladding on TES Tank as per the prescribed
scope of work.
2.0 Reference
3.0 Responsibilities
All our field staff proposed to be deployed for the execution of this insulation &
cladding works are under our direct employment and are highly experienced in
the field, some of key technicians are with us for the past more than 20 years
executing similar and identical insulation jobs.
3.1 Instructions
Supervisors & foreman shall ensure compliance of this method statement and
pass on the required instruction down the route on day to day bases towards
implementation of this method statement, project specifications, quality and
safety aspects, incase of any doubt the field staff, foreman and others will
approach the supervisor for clarifications.
All the work force such as fabricator(s), fitter(s) & insulator(s) shall possess
relevant knowledge familiar with the handling & application of these materials.
Page 3 of 6
3.2 Initial Check
The Supervisor designated for this task will ensure that the tank have been
released from mechanical, painting and all other activities required to be
completed prior to installation of insulation.
To check that all surfaces to be insulated are clean, dry and free from grease,
dirt & foreign materials and the surrounding area is free of obstacles and debris
etc.
4.0 Materials
4.1.1 The basic insulation material for tank bottom shall be foam glass of 100mm
thickness x 125kg/mᶟ density.
4.1.2 The insulation materials for tank shell and roof shall be polyurethane foam
slabs of single 100mm thickness with outer side foil faced having 32-35kg/mᶟ
density
Page 4 of 6
5.0 Procedure
5.1 Insulation Procedure
5.1.1 Polyurethane slabs shall be installed on the tank shell and roof with
adhesive on circumferential & longitudinal joints for single application, care shall
be taken to ensure that the inner bore of slab is kept free of joint sealant and that
adhesion to the tank wall does not occur.
5.1.2 Care shall be taken to ensure that tensioning of band does not crack or
damage the insulation, Metal bands shall not be used as the same can damage
the insulation.
5.1.3 All insulation interruption(s) / termination shall have vapor stop mastic
wherever required.
5.1.4 All polyurethane joints shall be butted together shall have staggered joints
with 6 inch offset (sketch attached)
5.2.1 Tanks shell and roof shall be cladded with flat metal sheeting to confirm the
insulated diameter of tank shell with vertical joint seam and horizontal overlaps.
5.2.2 All the cladding on tanks shell and roof shall be fitted to vertical seams with
machine tensioned and shall be provided with silicon sealant to prevent ingress
of water and all horizontal joints shall have overlap of not less than 50mm and
shall also be sealed with silicon sealant.
5.2.3 All the horizontal joints shall be installed weather side down to prevent
ingress of water and shall be sealed with rivets and silicon shall be applied.
Page 5 of 6
5.3.3 All vertical joints shall be standing seam joint sealed with silicon.
6.0 Inspection and reporting procedures
6.1 All inspection(s) shall be carried out initially by Supervisor followed with our
QC Inspector strictly according to the inspection and test plan (ITP) at all stages
of application and on completion of final inspection for the relevant completed
work and will inform main contractor’s and client’s quality department for final
acceptance.
The designated safety officer will ensure that all our field staff and workers
involved in insulation and other related activity will wear protective equipment at
all times and will also ensure that none of the safety equipment is damaged.
Safety office and supervisor will ensure that the work at height is not carried out
during inclement weather.
All care shall be taken while working in open sun and high humid conditions and
ensure availability of sufficient drinking water and adequate rest break as
permissible.
The work place shall be free from rubbish, junk, debris and shall always be
clean,for this purpose housekeeping will be regularly carried out at our work
site. In addition to the above factors we would also comply with HSE Policy of
the client.