The Technical Integrity Verification Plan (TIV Plan) outlines how a project will ensure the functionality of safety critical elements and compliance with performance standards. It is a key document for applying the Asset Integrity Process Safety Management Standard. Developing technical integrity during the project phase establishes criteria and a baseline to maintain integrity during the operations phase through performance standards based on global templates and the SCE Management Manual.

Uploaded by

sabath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
341 views1 page

Tech Integrity PDF

The Technical Integrity Verification Plan (TIV Plan) outlines how a project will ensure the functionality of safety critical elements and compliance with performance standards. It is a key document for applying the Asset Integrity Process Safety Management Standard. Developing technical integrity during the project phase establishes criteria and a baseline to maintain integrity during the operations phase through performance standards based on global templates and the SCE Management Manual.

Uploaded by

sabath
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TIV

SCE&PS

The objective of the Verification Plan is to set out how the project will assure the functionality of the
Safety Critical Elements and compliance with the defined equipment performance standards. As such
the Technical Integrity Verifcation Plan (TIV Plan) is one of the key supporting documents in the
application of the Asset Integrity Process Safety Management (AI-PSM) Standard. The establishment of
Technical Integrity through the project phase sets the criteria and assures the baseline ready for the
Operate Phase maintenance of Integrity. The project will deliver the technical Integrity and set the
parameter for ongoing assurance by the development of the Operate Phase Performance Standards
based on the Global Performance Standard Templates in compliance with the SCE Management
Manual.

The objective of the Verification Plan is to set out how the project will assure the functionality of the
Safety Critical Elements and compliance with the defined equipment performance standards. As such
the Technical Integrity Verifcation Plan (TIV Plan) is one of the key supporting documents in the
application of the Asset Integrity Process Safety Management (AI-PSM) Standard. The establishment of
Technical Integrity through the project phase sets the criteria and assures the baseline ready for the
Operate Phase maintenance of Integrity. The project will deliver the technical Integrity and set the
parameter for ongoing assurance by the development of the Operate Phase Performance Standards
based on the Global Performance Standard Templates in compliance with the SCE Management
Manual.