Introduction and Safety .......................................................................................................... 4
Introduction ............................................................................................................................. 4
Safety ...................................................................................................................................... 5
Safety terminology and symbols ............................................................................................. 5
Environmental safety .............................................................................................................. 6
User safety .............................................................................................................................. 6
Precautions before work ....................................................................................................... 7
Precautions during work ....................................................................................................... 7
Safety regulations for Ex-approved products in potentially explosive atmospheres ................ 8
Product approval standards .................................................................................................. 10
Product warranty ................................................................................................................... 11
Installation ............................................................................................................................. 22
Preinstallation ....................................................................................................................... 22
Pump location guidelines .................................................................................................... 22
Foundation requirements ................................................................................................... 23
Set the baseplate .................................................................................................................. 23
Pump-to-driver alignment ...................................................................................................... 24
Alignment checks ............................................................................................................... 24
Align the pump using a straight edge .................................................................................. 25
Align the pump using a dial indicator .................................................................................. 26
Grout the baseplate .............................................................................................................. 27
Piping checklists ................................................................................................................... 28
General piping checklist ..................................................................................................... 28
Suction piping checklist ...................................................................................................... 29
Suction-piping valve considerations ................................................................................... 32
Discharge piping considerations ......................................................................................... 33
Pressure gauges ................................................................................................................ 33
Pump doweling ..................................................................................................................... 33
Maintenance ........................................................................................................................... 51
Maintenance schedule .......................................................................................................... 51
Flood-damaged pumps ......................................................................................................... 52
Bearing maintenance ............................................................................................................ 52
Regrease the grease-lubricated bearings .......................................................................... 52
Lubricate the oil-lubricated bearings ................................................................................... 54
Bearing temperatures ......................................................................................................... 55
Bearing conditions .............................................................................................................. 55
Emergency ball bearing replacement ................................................................................. 55
Coupling lubrication ............................................................................................................ 55
Shaft-seal maintenance ........................................................................................................ 56
Packed stuffing box maintenance ....................................................................................... 56
Mechanical seal maintenance ............................................................................................ 56
Disassembly ......................................................................................................................... 57
Disassembly precautions ................................................................................................... 57
Drain the pump ................................................................................................................... 57
Remove the coupling guard ................................................................................................ 57
Remove the rotating element ............................................................................................. 60
Remove the bearings ......................................................................................................... 61
Remove the seals ............................................................................................................... 62
Remove the shaft sleeve .................................................................................................... 62
Remove the impeller ........................................................................................................... 62
Preassembly inspections ...................................................................................................... 63
Replace impeller wear rings ............................................................................................... 64
Radial clearances ............................................................................................................... 65
Reassembly .......................................................................................................................... 66
Install the impeller ............................................................................................................... 66
Assemble the rotating element ........................................................................................... 67
Install the bearings ............................................................................................................. 67
Install the rotating element ................................................................................................. 67
Assemble the casing .......................................................................................................... 67
Complete the assembly ...................................................................................................... 68
Bolt Torque Values - 3410 IOM .......................................................................................... 68
Spare parts ........................................................................................................................... 68
Troubleshooting .................................................................................................................... 70
Troubleshooting .................................................................................................................... 70
CAUTION:
Failure to observe the instructions contained in this manual could result in personal injury and
property damage, and may void the warranty. Read this manual carefully before installing and
using the product.
NOTICE:
Save this manual for future reference and keep it readily available.
Safety
WARNING:
• The operator must be aware of the pumpage and take appropriate safety precautions to
prevent physical injury.
• Risk of serious injury or death. If any pressure-containing device is over-pressurized, it can
explode, rupture, or discharge its contents. It is critical to take all necessary measures to
avoid over-pressurization.
• Risk of death, serious personal injury, and property damage. Installing, operating, or
maintaining the unit using any method not prescribed in this manual is prohibited.
Prohibited methods include any modification to the equipment or use of parts not provided
by ITT. If there is any uncertainty regarding the appropriate use of the equipment, please
contact an ITT representative before proceeding.
• Risk of injury and/or property damage. Operating a pump in an inappropriate application
can cause over pressurization, overheating, and/or unstable operation. Do not change the
service application without the approval of an authorized ITT representative.
• Running a pump without safety devices exposes operators to risk of serious personal
injury or death. Never operate a unit unless appropriate safety devices (guards, etc.) are
properly installed. See specific information about safety devices in other sections of this
manual.
• Risk of death, serious personal injury, and property damage. Heat and pressure buildup
can cause explosion, rupture, and discharge of pumpage. Never operate the pump with
suction and/or discharge valves closed.
• Never operate the pump with the suction valve closed.
• Precautions must be taken to prevent physical injury. The pump may handle hazardous
and/or toxic fluids. Proper personal protective equipment should be worn. Pumpage must
be handled and disposed of in conformance with applicable environmental regulations.
Hazard levels
Hazard level Indication
A hazardous situation which, if not avoided, will
DANGER: result in death or serious injury
Hazard categories
Hazard categories can either fall under hazard levels or let specific symbols replace the
ordinary hazard level symbols.
Electrical hazards are indicated by the following specific symbol:
Electrical Hazard:
These are examples of other categories that can occur. They fall under the ordinary hazard
levels and may use complementing symbols:
• Crush hazard
• Cutting hazard
• Arc flash hazard
The Ex symbol
The Ex symbol indicates safety regulations for Ex-approved products when used in
atmospheres that are potentially explosive or flammable.
Environmental safety
The work area
Always keep the pump station clean to avoid and/or discover emissions.
Recycling guidelines
Always recycle according to these guidelines:
1. If the unit or parts are accepted by an authorized recycling company, then follow local
recycling laws and regulations.
2. If the unit or parts are not accepted by an authorized recycling company, then return them
to the nearest ITT representative.
User safety
General safety rules
These safety rules apply:
Safety equipment
Use safety equipment according to the company regulations. Use this safety equipment within
the work area:
• Helmet
• Safety goggles, preferably with side shields
• Protective shoes
• Protective gloves
• Gas mask
• Hearing protection
• First-aid kit
• Safety devices
Electrical connections
Electrical connections must be made by certified electricians in compliance with all internation-
al, national, state, and local regulations. For more information about requirements, see sections
dealing specifically with electrical connections.
WARNING:
Risk of serious personal injury. Applying heat to impellers, propellers, or their retaining devices
can cause trapped liquid to rapidly expand and result in a violent explosion. This manual clearly
identifies accepted methods for disassembling units. These methods must be adhered to.
Never apply heat to aid in their removal unless explicitly stated in this manual.
If there are any questions regarding these requirements, the intended use, or if the equipment
requires modification, contact an ITT representative before you proceed.
Personnel requirements
ITT disclaims all responsibility for work done by untrained and unauthorized personnel.
These are the personnel requirements for Ex-approved products in potentially explosive
atmospheres:
• All work on the product must be carried out by certified electricians and ITT-authorized
mechanics. Special rules apply to installations in explosive atmospheres.
• All users must know about the risks of electric current and the chemical and physical
characteristics of the gas and/or vapor present in hazardous areas.
• Any maintenance for Ex-approved products must conform to international and national
standards (for example IEC/EN 60079-17).
WARNING:
Use of equipment unsuitable for the environment can pose risks of ignition and/or explosion.
Ensure that the code classifications on the pump are compatible with the specific environment
in which the equipment is to be installed. If they are not compatible, do not operate the
equipment and contact an ITT representative before proceeding.
All standard products are approved according to CSA standards in Canada and UL standards
in USA. The drive unit degree of protection follows IP68. See the nameplate for maximum
submersion, according to standard IEC 60529.
All electrical ratings and performance of the motors comply with IEC 600341.
Explosion-proofing standards
All explosion-proof products for use in explosive atmospheres are designed in compliance with
one or more of the following approvals:
• EN, ATEX Directive 94/9/EC
• FM According to NEC
• Class 1 Div 1 Groups “C”, and “D”
• Class 2 Div 1 Groups “E”, “F”, and “G”
• Class 3 Div 1 Hazardous Locations
ATEX/IECEx:
• Group: IIC
• Category: Ex ia
• Temperature Class: T4 (for ambients up to 100ºC)
• ATEX Marking: Ex II 1 G
CSA certification
Intrinsically safe for:
• Class I, Div. 1, Groups A, B, C, D
• Class II, Div. 1, Groups E, F, G
• Class III
• Certified to Canadian and US requirements
Product warranty
Coverage
ITT undertakes to remedy faults in products from ITT under these conditions:
• The faults are due to defects in design, materials, or workmanship.
• The faults are reported to an ITT representative within the warranty period.
• The product is used only under the conditions described in this manual.
• The monitoring equipment incorporated in the product is correctly connected and in use.
• All service and repair work is done by ITT-authorized personnel.
• Genuine ITT parts are used.
• Only Ex-approved spare parts and accessories authorized by ITT are used in Ex-approved
products.
Limitations
The warranty does not cover faults caused by these situations:
• Deficient maintenance
• Improper installation
• Modifications or changes to the product and installation made without consulting ITT
• Incorrectly executed repair work
• Normal wear and tear
ITT assumes no liability for these situations:
• Bodily injuries
• Material damages
• Economic losses
Warranty claim
ITT products are high-quality products with expected reliable operation and long life. However,
should the need arise for a warranty claim, then contact your ITT representative.
Transportation guidelines
Precautions
WARNING:
• Stay clear of suspended loads.
• Observe accident prevention regulations in force.
Pump handling
WARNING:
Dropping, rolling or tipping units, or applying other shock loads, can cause property damage
and personal injury. Ensure that the unit is properly supported and secure during lifting and
handling.
CAUTION:
Risk of injury or equipment damage from use of inadequate lifting devices. Ensure lifting
devices (such as chains, straps, forklifts, cranes, etc.) are rated to sufficient capacity.
Lifting methods
WARNING:
• All lifting must be done in compliance with all applicable regulations/standards.
• Safe lifting points are specifically identified in this manual. It is critical to lift the equipment
only at these points. Integral lifting eyes or eye bolts on pump and motor components are
intended for use in lifting the individual components only.
• Lifting and handling heavy equipment poses a crush hazard. Use caution during lifting and
handling and wear appropriate Personal Protective Equipment (PPE, such as steel-toed
shoes, gloves, etc.) at all times. Seek assistance if necessary.
• Do not attach sling ropes to shaft ends.
The unit must be unloaded and handled by lifting equally at four or more points on the
baseplate. The lugs on the upper half casing are designed for lifting the upper half of the casing
only.
CAUTION:
Take care to size equipment for unbal-
anced loads that may exist if the driver is
not mounted on the base at the time of
lifting. The driver may or may not be
mounted at the factory.
Figure 2: The proper lifting method for a horizontal pump on a base with lifting holes
Figure 3: The proper lifting method for a horizontal pump on a base without lifting holes
Storage guidelines
Pump storage requirements
Storage requirements depend on the amount of time that you store the unit. The normal
packaging is designed only to protect the unit during shipping.
Length of time in storage Storage requirements
Upon receipt/short-term (less than six months) • Store in a covered and dry location.
• Store the unit free from dirt and vibrations.
Long-term (more than six months) • Store in a covered and dry location.
• Store the unit free from heat, dirt, and vibra-
tions.
• Rotate the shaft by hand several times at least
every three months.
Treat bearing and machined surfaces so that they are well preserved. Refer to drive unit and
coupling manufacturers for their long-term storage procedures.
You can purchase long-term storage treatment with the initial unit order or you can purchase it
and apply it after the units are already in the field. Contact your local ITT sales representative.
Product Description
General description
Product description
Goulds Model 3410 is a single-stage, double-suction pump with the following capabilities:
Measurement Maximum tolerance
Capacity 12,000 gpm (45,425 lpm)
Head 530 ft (161 m)
Pressure • Cast iron: 175 psig (1,200 kPa)
• Ductile iron or steel: 250 psig (1,725 kPa)
Temperature 350°F (177°C)
Pump sizes with an H designation are designed for a higher flow than the equivalent size
standard pump. External casing dimensions are the same, but the H pumps have wider casing
cutwaters and impellers.
The complete model line has four different shafts with only two bearing assemblies. Standard
constructions are all-iron, bronze fitted, 316SS fitted, and all 316SS. Other constructions are
available upon request.
Right-hand rotation is standard. Left-hand rotation is available as an option. The rotation can be
changed after installation without any additional parts.
Vertical application
Model 3410 is available in a vertical configuration (3410V). This arrangement is ideal for
applications with limited space such as shipboard service. A rugged fabricated-steel frame
supports the pump and driver, providing a machined fit for positive alignment when using
standard P-base motors.
WARNING:
Leakage of pumped liquid can create an explosive environment. Make sure that the pumped
liquid is compatible with all pump materials it comes in contact with.
Casing
The casing is split horizontally. The upper and lower halves are held together with capscrews
and studs on the side of each stuffing box to aid in disassembly and reassembly. The casing is
supported by integrally cast feet. Separate bearing housings are attached directly to machined
fits in each end of the casing with capscrews.
Fourteen of the 27 casings are double volute as follows:
• 4x6-11
• 4x6-11H
• 6x8-11
• 8x10-21
• 8x10-12
• 8x10-14
• 8x10-17
• 8x10-17H
• 10x12-12
• 10x12-12H1
• 10x12-14
• 10x12-17
• 10x12-15
• 12x14-14
• 12x14-15
Flanged suction and discharge connections are located in the lower half of the casing and
conform to ANSI 16.1/16.5 class 125/150. The 125# flat-face flanges are standard with 250#
flat-face available as an option.
DIN flanges may also be provided on all sizes except the 6x8-22. The flanges are provided in
accordance with EN 1092-2. These flanges are smooth, flat faced and meet or exceed the
minimum thickness required by the PN rating. The flanges provided are PN16 on smaller sizes
and PN10 on the larger sizes.
The casings are standard with the following parts:
• Two jackscrews (except S group)
• Two lifting lugs
• Two tapered dowel pins for alignment
• One 0.030 in. (0.0762 cm) parting gasket
The upper-half casing has a vent connection, a priming connection, and two stuffing box seal
ring connections. The lower half has two drain connections.
Impeller
• Enclosed, double suction
• Axial hydraulic balance
• Key driven
• Dynamically balanced, when the diameter to width ratio is less than six
Wear rings
• Casing wear rings are supplied as standard to maintain proper running clearance and to
minimize leakage between the suction and discharge chambers in the casing. Each casing
ring is held in place by a single anti-rotation pin located in a milled slot at the horizontal
parting surface.
• Optional impeller wear rings are available on all pump sizes. The impeller wear rings are
held in position by axial setscrews. Field installation of impeller rings requires a
remachining of the impeller hubs.
• The casing rings remain the same for designs with or without impeller rings.
Shaft
The shaft is a heavy-duty design that minimizes deflection and vibration. The shaft deflection is
a maximum of 0.002 in. (0.051 mm) at the stuffing box face under the worst operating
conditions. The shaft on M, L, and XL group pumps is completely dry with gasket seals
between the impeller hubs and shaft sleeves. The S group does not have a completely dry
shaft. The S group is standard with a 420 stainless steel shaft. The M, L, and XL sizes have an
ANSI 4140 steel shaft standard with an option for 316 stainless steel.
Shaft sleeves
The M, L and XL group pumps have standard shaft sleeves. They are keyed to the shaft at the
impeller and held axially in place using threaded sleeve nuts. The S group pumps are standard
without shaft sleeves, but sleeves are available.
Stuffing box
Non-asbestos stuffing box packing is standard. The stuffing box contains split lantern rings and
renewable stuffing box throat bushings. Tapped openings are provided for water sealing from
either the pump casing or an outside source. Bypass piping is optional. Two-piece, investment
cast, 316 stainless steel, non-quench glands are standard on all 3410 pumps.
Mechanical seals
• Mechanical seals are available as an option on the Model 3410. Oversize stuffing box
bores are standard on pumps with factory-installed mechanical seals. This provides
greater flexibility and an improved operating environment.
• Pumps that are supplied with standard packed boxes can be converted to mechanical
seals in the field. This conversion requires either remachining of the stuffing box to
accommodate the mechanical seal or remachining of the gland to adapt to the existing
stuffing box. If the stuffing box bores are remachined, then all standard Model 3410
mechanical seals and the standard I.D. pilot glands can be used.
• Balanced seals require conversion to stepped sleeves. Most unbalanced mechanical seals
will fit in the standard packed box bores, but this requires remachining the I.D. pilot off the
glands. In this case, the glands must be centered on the shaft or the sleeve using a feeler
gauge.
• Pumps supplied with mechanical seals can also be converted to packed boxes in the field.
A cartridge conversion kit is available and includes a box of fittings plus sleeves to convert
oversize bores to standard packed-box bores.
Bearings
• The Model 3410 is standard with double-row ball thrust bearings and a single-row deep
groove ball bearing at the coupling end. There are only two sizes of bearing housings and
bearings used on the Model 3410 product line. The S and M groups use identical bearings,
as do the L and XL groups. The thrust bearing is held in position with a tapered snap ring
and is locked in the thrust bearing housing to take any unbalanced axial thrust load. The
radial bearing is free to float axially in the bearing housing taking radial loads only.
• Grease lubrication is standard. Oil lubrication is optional and uses the same shaft,
bearings, and bearing housings. Bearing cooling is available with oil lubrication only and is
required for temperatures over 250°F (121°C). The bearing housings are completely
sealed by Inpro VBS bearing isolators.
Bedplates
Cast iron bedplates are furnished as standard. They include a drip collection chamber with a
tapped drain connection and an opening suitable for grouting. Fabricated steel bedplates are
available as an option.
Intended applications
The Goulds 3410 model line is designed for a wide range of industrial, municipal, and marine
services, which includes:
• Process – Quench water, stripper bottoms, reboiler circulation, and cooling tower
• Pulp and paper – Primary and secondary cleaner, filtrate, mill water supply, and fan pump
• Primary metals – Cooling water, quench, and leaching
• Municipal – High lift, low lift, wash water, waste water, and raw water
• Utilities – Cooling tower, component cooling, and service water
• Marine – Bilge and ballast, cargo, cooling service, and fire pump
Nameplate information
Important information for ordering
Every pump has a nameplate that provides information about the pump. The nameplate is
located on the pump casing.
When you order spare parts, identify this pump information:
• Model
• Size
• Serial number
• Item numbers of the required parts
Refer to the nameplate on the pump casing for most of the information. See Parts List for item
numbers.
Nameplate types
Nameplate Description
Pump casing Provides information about the hydraulic characteristics of the pump.
Pump The formula for the pump size is: Discharge x Suction - Nominal Maximum Impeller Diameter in inches.
(Example: 2x3-8)
ATEX If applicable, your pump unit might have an ATEX nameplate affixed to the pump, the baseplate, or the
discharge head. The nameplate provides information about the ATEX specifications of this pump.
ATEX nameplate
WARNING:
Use of equipment unsuitable for the environment can pose risks of ignition and/or explosion.
Ensure that the code classifications on the pump are compatible with the specific environment
in which the equipment is to be installed. If they are not compatible, do not operate the
equipment and contact an ITT representative before proceeding.
Installation
Preinstallation
Precautions
WARNING:
• When installing in a potentially explosive environment, ensure that the motor is
properly certified.
• All equipment being installed must be properly grounded to prevent unexpected
discharge. Discharge can cause equipment damage, electric shock, and result in serious
injury. Test the ground lead to verify it is connected correctly.
NOTICE:
• Supervision by an authorized ITT representative is recommended to ensure proper
installation. Improper installation may result in equipment damage or decreased perfor-
mance.
• Electrical connections must be made by certified electricians in compliance with all
international, national, state and local regulations.
The installation must be evaluated to determine that the Net Positive Suction Head Available
(NPSHA) meets or exceeds the Net Positive Suction Head Required (NPSHR), as stated by the
pump performance curve.
Foundation requirements
Requirements
• The foundation must be able to absorb any type of vibration and form a permanent, rigid
support for the unit.
• The foundation must weigh at least five times the weight of the pump unit.
• Provide a flat, substantial concrete foundation in order to prevent strain and distortion
when you tighten the foundation bolts.
Foundation bolts
• Foundation bolts must be embedded in the concrete to a depth of 8âM M 12 in. (20âM M 30
cm) and locked with either a hook around a reinforcing bar or a nut and washer at the
bottom.
• Foundation bolts must have a sleeve around them at least six times the bolt diameter in
length and at least two bolt sizes larger in ID.
• If a nut and washer are used for locking, then the washer must have an OD two sizes
larger than the sleeve.
• Foundation bolts must be sized 0.125 in. (3.175 mm) less than the anchor bolt holes in the
base.
1. Baseplate
2. Grout
3. Alternate bolt and washer
4. Concrete
5. Bolt sleeve
Figure 9: Bolt installation
foundation bolts extending through the holes in the baseplate. Instead of blocks and shims,
you can also use metal wedges with a small taper.
2. If the unit has a non-flexible coupling, such as a Falk Gear coupling, then disconnect the
coupling halves.
This is usually not necessary on flexible-type couplings, such as Wood’s Sure-Flex
coupling.
3. Tighten all pump and motor bolts.
This ensures that bolts have not loosened or that a soft foot has not occurred due to base
distortion during shipment. A soft foot causes a change in the alignment when one bolt is
loosened.
4. If the driver is being installed in the field, then make sure it is centered in its bolt holes with
shims added to bring the driver into rough alignment with the pump.
Move the pump also, if necessary.
NOTICE:
Risk of improper alignment. Do not use more than six shims and use the thickest shims
possible. Place thin shims in between thick shims.
5. Level and plumb the pump shaft, coupling faces, and flanges by adding or removing shims
between the blocks and the bottom of the base.
6. Hand-tighten the anchor bolt nuts. Then tighten the nuts with a wrench, taking care not to
distort the base.
Do not reconnect the non-flexible coupling until after you complete the alignment operation.
The baseplate does not need to be level.
7. After the foundation bolts are lightly torqued, recheck the alignment requirements.
If the alignment must be corrected, then add or remove shims or wedges under the
baseplate.
Pump-to-driver alignment
Precautions
WARNING:
• Misalignment can cause decreased performance, equipment damage, and even catas-
trophic failure of frame-mounted units leading to serious injury. Proper alignment is the
responsibility of the installer and the user of the unit. Check the alignment of all drive
components prior to operating the unit.
• Follow the coupling installation and operation procedures from the coupling manufactur-
er.
• Failure to disconnect and lock out driver power may result in serious physical injury or
death. Always disconnect and lock out power to the driver before performing any
installation or maintenance tasks.
• Electrical connections must be made by certified electricians in compliance with all
international, national, state, and local rules.
• Refer to driver/coupling/gear manufacturer's installation and operation manuals (IOM)
for specific instructions and recommendations.
Alignment checks
When to perform alignment checks
You must perform alignment checks under these circumstances:
• The process temperature changes.
• The piping changes.
• The pump has been serviced.
Types of misalignment
Type of misalignment Description
Angular misalignment Shafts have an axis concentric at the intersection but not parallel.
Parallel offset misalignment Shafts have an axis parallel but offset.
To make the final alignment, move and shim the motor on its base until the coupling hubs are
within the recommended tolerances measured in total runout. Take all measurements with the
pump and driver bolts tightened. Make the final alignment check after the unit has attained its
final operating temperature.
Recommended settings
Pumped fluid temperature Recommended setting for driver shaft
Ambient 0.05 mm | 0.002 in. to 0.102 mm | 0.004 in., low
38°C | 100°F 0.00 mm | 0.000 in. to 0.05 mm | 0.002 in, high
93°C | 200°F 0.102 mm | 0.004 in. to 0.152 mm | 0.006 in., high
149°C | 300°F 0.203 mm | 0.008 in. to 0.254 mm | 0.010 in., high
204°C | 400°F 0.305 mm | 0.012 in. to 0.356 mm | 0.014 in., high
Only use this method if the face and outside diameters of the coupling halves are square and
concentric with the coupling bores. If this condition does not exist or elastomeric couplings do
not make this method convenient, then use the dial indicator method.
1. Check for angular alignment by inserting the taper or feeler gauges between the coupling
faces at 90° intervals.
The unit is in angular alignment when these four measurements are the same or are within
recommended tolerances.
2. Check for parallel alignment by placing a straight edge across both coupling rims on all four
sides.
The unit is in parallel alignment when the straight edge rests evenly across both coupling
rims in all four positions.
1. Feeler gauge
Figure 10: Incorrect angular alignment
1. Straight edge
Figure 11: Incorrect parallel alignment
1. Straight edge
2. Feeler gauge
Figure 12: Correct alignment
All readings must be made with the button on the chalk mark.
The dial readings will indicate whether the driver must be raised, lowered, or moved to
either side. You can accurately align the shaft centers with this method even where faces or
outside diameters of the coupling are not square or concentric with the bores.
NOTICE:
Risk for rotation unbalance. Any gross deviation in squareness or concentricity must be
corrected.
1. Dial indicator
2. Reference mark
3. Separator to take up the bearing slack
Figure 13: Angular alignment
1. Dial indicator
2. Reference mark
3. Separator to take up the bearing slack
Figure 14: Parallel alignment
Grout compensates for an uneven foundation. Together with the baseplate, grout makes a very
rigid interface between the pump and the foundation by distributing the weight over the length
of the base and preventing shifting. Use an approved, non-shrinking grout such as Embeco 636
or 885 by Master Builders, Cleveland, Ohio, or the equivalent.
1. Baseplate
2. Shims
3. Form
4. Concrete
5. Anchor bolt
6. Bolt sleeve
7. Grout
Figure 15: Baseplate grouting
1. Build a strong form around the foundation to contain the grout.
2. Soak the top of the foundation thoroughly, then remove surface water.
3. Completely fill the baseplate with grout.
If necessary, temporarily use air relief tubing or drill vent holes in order to remove trapped
air.
4. After the grout has completely hardened, tighten the foundation bolts.
It will take approximately 24 hours for the grout to harden.
5. Check the alignment.
6. Approximately fourteen days after the grout has been poured and the grout has completely
dried, apply an oil-based paint to the exposed edges of the grout in order to prevent air and
moisture from coming in contact with the grout.
Piping checklists
General piping checklist
Precautions
CAUTION:
Do not move the pump to the pipe. This could make final alignment impossible.
CAUTION:
Flange loads from the piping system, including those from the thermal expansion of the
piping, must not exceed the limits of the pump. Casing deformation can result in contact with
rotating parts, which can result in excess heat generation, sparks, and premature failure.
NOTICE:
Vary the capacity with the regulating valve in the discharge line. Never throttle the flow from the
suction side. This action can result in decreased performance, unexpected heat generation,
and equipment damage.
Piping guidelines
Guidelines for piping are given in the Hydraulic Institute Standards available from the Hydraulic
Institute at 9 Sylvan Way, Parsippany, NJ 07054-3802. You must review this document before
you install the pump.
Checklist
Check Explanation/comment Checked
Check that all piping is supported This helps to prevent:
independently of, and lined up • Strain on the pump
naturally with, the pump flange.
• Misalignment between the pump and the drive unit
• Wear on the pump bearings, seal, and shafting
Keep the piping as straight as This helps to minimize friction losses.
possible. Avoid unnecessary
bends. Use 45° or long radius 90°
fittings where necessary.
Check that only necessary fittings This helps to minimize friction losses.
are used.
Make sure that the inside diame- —
ters match properly when you use
flange joints.
Do not connect the piping to the —
pump until:
• The grout for the baseplate
or sub-base becomes hard.
• The hold-down bolts for the
pump are tightened.
Make sure that all the piping joints This prevents air from entering the piping system or
and fittings are airtight. leaks that occur during operation.
If the pump handles corrosive
fluids, make sure that the piping
allows you to flush out the liquid
before you remove the pump.
If the pump handles liquids at This helps to prevent misalignment due to thermal
elevated temperatures, make expansion of the piping.
sure that the expansion loops and
joints are properly installed.
Make sure that all piping compo- —
nents, valves and fittings, and
pump branches are clean prior to
assembly.
CAUTION:
• Flange loads from the piping system, including those from the thermal expansion of the
piping, must not exceed the limits of the pump. Deformation can result in contact with
rotating parts, which can result in excess heat generation, sparks, and premature failure.
• Air pockets can form in the top of the reducer and the pipe when operating on suction lift.
Never use a concentric reducer in a horizontal line.
Piping checklist
Check Explanation/comment Checked
Check that the elbows in the suction When there is an elbow in a position other than
piping for horizontal double-suction the vertical when in relation to the pump suction
pumps are installed per the Hydraulics nozzle, this causes more liquid to enter one side
Institute Standards since there is al- of the impeller than the other. The result is highly
ways an uneven turbulent flow around unequalized thrust loads that overheat the bear-
an elbow. ings and cause rapid wear, which adversely
affects the hydraulic performance. See the Ex-
ample of unbalanced loading figure.
Check that pipe reducers on the inlet This avoids excessive turbulence and noise.
side have no more than one pipe
diameter reduction in a single reducer.
When operating on a suction lift, check A horizontal suction line must have a gradual
that the suction pipe slopes upward to rise to the pump. Any high point in the pipe can
the pump nozzle. become filled with air and prevent proper opera-
tion of the pump.
(Optional) You can install a short sec- This facilitates the cleansing of the liquid pas-
tion of pipe adjacent to the suction sage of the pump without dismantling the pump.
flange such as Dutchman or a spool With this arrangement, anything that clogs the
piece that is designed so that it can be impeller is accessible with the removal of the
readily dropped out of the line. spool piece or pipe section.
CAUTION:
Risk of excessive axial load or cavitation. Do not install an elbow directly before the suction of
a double suction pump if the plane of the suction is parallel to the pump shaft. Alternatively,
install an elbow with straightening vanes to help evenly distribute the flow.
This figure shows the unbalanced loading of a double-suction impeller due to the uneven flow
around an elbow that is adjacent to the pump:
1. Pump casing
2. Impeller
3. Pump suction flange
4. Suction elbow
5. Water velocity increases here and causes a greater flow to one side of the impeller.
Figure 16: Unbalanced loading of double-suction impeller
Examples
1. Air pocket
Figure 18: Suction pipe installed with a gradual rise to the pump – incorrect
1. Air pocket
Figure 19: Suction pipe installed with a reducer – incorrect
1. Air pocket
Figure 20: Incorrect
1. No air pockets
2. Gradual rise
Figure 21: Correct
1. No air pockets
2. Eccentric reducer
3. Gradual rise
Figure 22: Gradual rise to the pump – correct
CAUTION:
Never throttle the flow from the suction side. Only use suction valves to isolate the pump for
maintenance, and install such valves in positions to avoid air pockets.
Before you install suction valves in the suction piping, review these considerations:
• Make sure that the suction piping valves are placed right before the run of recommended
straight pipe.
• Never throttle the pump with the use of a valve on the suction side of the pump.
• Only use suction valves to isolate the pump for maintenance purposes.
• Always install the valve in a position that avoids the formation of air pockets.
Foot valves
If the pump operates under static suction lift conditions, you can install a foot valve in the
suction line in order to avoid the necessity of priming each time you start the pump.
Before you install foot valves in the suction piping, review these considerations:
• Make sure this valve is of the flapper type, rather than the multiple spring type, and that it is
sized to avoid excessive friction in the suction line.
• Size the foot valve and pipe in order to maximize NPSHA to the pump by minimizing
suction line losses.
• When foot valves are used, or where there are other possibilities of water hammer, close
the discharge valve slowly before you shut down the pump.
Check valves
In normal applications, check valves are placed in the discharge piping. Before you use a
check valve in the suction piping, consider the added pressure drop to the pump, the potential
of water hammer, and the chance of allowing the entire pump volute to be exposed to the
discharge pressure.
Gate valves
Where two or more pumps are connected to the same suction line, install gate valves so that
any pump can be isolated from the line.
Before you install gate valves, review these considerations:
• Always install gate valves on the suction side of the pumps with a positive pressure for
maintenance purposes.
• Always install gate valves with the stems in a horizontal position to avoid air pockets.
• Globe valves should not be used, particularly where NPSH is critical.
Pressure gauges
Install properly sized pressure gauges in both the suction and discharge nozzles in the gauge
taps provided. The gauges enable the operator to observe the operation of the pump and to
determine whether the pump is operating in conformance with the performance curve. If
cavitation, vapor binding, or other unstable operations occur, then widely fluctuating discharge
pressure will be noted.
Pump doweling
Pump units can be doweled on diagonally opposite feet. Do not do this until the unit has run for
a sufficient length of time and alignment is within the required alignment tolerance.
CAUTION:
• Serious damage to the pump may result if it is started dry. Make sure that the pump is
completely filled with liquid before it is started.
System flushing
Flush new and old systems in order to eliminate all foreign matter. Heavy scale, welding
splatter, and wire or other large foreign matter can clog the pump impeller. This reduces the
capacity of the pump which then causes cavitation, excessive vibration, and/or damage to
close clearance parts such as wear rings, seals, and sleeves.
Pre-operation inspections
NOTICE:
Foreign objects in the pumped liquid or piping system can block the flow and cause excess
heat generation, sparks and premature failure. Make sure that the pump and systems are free
of foreign objects before and during operation.
Pump priming
CAUTION:
Do not run the pump dry.
1. Locate the vents at the highest point so that trapped gases and air can escape.
However, if the gases are flammable, toxic, or corrosive, then vent them to an appropriate
place in order to prevent harm to personnel or to other parts of the system.
2. Check the pipe hangers and anchors to make sure that they are properly set to take the
additional weight of the pumped fluid.
3. Close all of the drains.
4. Fill the system slowly so that excessive velocities do not cause rotation of the pumping
elements.
Rotation of the pumping elements can cause damage to the pump or its driver.
5. Check the adequacy of the anchors and hangers:
a) Mount a dial indicator off of any rigid structure not tied to the piping.
b) Set the indicator button on the pump flange in the axial direction of the nozzle.
If the indicator moves as the filling proceeds, then the anchors and supports are not
adequate or are not set properly. Take corrective measures.
NOTICE:
Make sure that the pump is properly primed. If it is not, then shut down the pump and
correct the condition.
Operational checklist
Check Explanation/comment Checked
Driver rotation Check the rotation each time the motor leads are discon-
nected.
WARNING:
Check the rotation of the power unit
and pump in relation to that of the
drive as shown by the arrows on
the case. Rotate the drive manually
before you apply power-checking
rotation. Do not operate in the re-
verse direction of these arrows as
serious damage or injury can occur.
Stuffing box adjustment Make stuffing box packing gland and lubrication adjust-
ments.
Flow It is difficult to accurately measure flow rate (volume/
time). Any of the following methods of measuring can be
used:
• Venturi meters
• Flow nozzles
• Orifice plates
• Timing the draw down in the wet well
Record any reading for future reference.
CAUTION:
• You must use a coupling guard made of a spark-resistant material in an ATEX classified
environment.
• Running a pump without safety devices exposes operators to risk of serious personal
injury or death. Never operate a unit unless appropriate safety devices (guards, etc.) are
properly installed.
Couplings must have proper certification to be used in an ATEX classified environment. Use
the instructions from the coupling manufacturer in order to lubricate and install the coupling.
Refer to driver/coupling/gear manufacturers IOM for specific instructions and recommenda-
tions.
Bearing lubrication
CAUTION:
• Risk of explosive hazard and premature failure from sparks and heat generation.
Ensure bearings are properly lubricated prior to startup.
• Risk of heat generation, sparks and premature failure. Do not insulate bearing housings.
Oil-lubricated pumps are not lubricated at factory. Use a high quality, turbine-type oil with rust
and oxidation inhibitors. Constant level oilers are supplied in the box of fittings that
accompanies most oil-lubricated pumps. Make oil adjustments before lubrication. See
Lubricating-oil requirements (page 54) for recommended lubricants and supplies.
Bearing cooling is available with the oil lubrication option only. Cooling water must be
connected to the bearing housing with a waste or return line. Water cooling is required when
operating temperatures exceed 250°F (121°C).
1. Oiler
2. Adjustment assembly
3. Housing
2. Remove the adjustment assembly from the oiler.
3. Adjust the bars to dimension A as specified in Bar adjustment (page 39).
4. Lock in position.
5. Replace the adjustment assembly in the oiler.
6. Install the oiler.
7. Fill each bottle with oil and replace in the oiler housing.
The oil reservoir in the bearing housing is filled when the oil remains visible in the bottle.
You will need to fill the bottle several times.
Bar adjustment
Specification Measurement
Dimension A 9/16 in. (14.5 mm)
Dimension B 1/2 in. (13 mm)
Oiler size #5 8 oz (204 ml)
Casing capacity • S and M groups: 9 oz (266 ml)
• L and XL groups: 16.5 oz (489 ml)
1. Make sure the stuffing box is clean and contains no foreign material.
2. Install the gland studs into the casing if they are not already installed.
The stuffing box packing is furnished in the box of fittings that accompanies the pump.
When you are packing the stuffing box, use the following order for the packing and lantern
rings:
1. Two packing rings
2. Lantern ring
1. Gland
2. packing
6. Hand-tighten the gland nuts evenly but not tight.
7. To remove the packing from the stuffing box, do the following:
a) Remove the gland assembly.
b) Remove the packing with a packing hook.
c) Remove the lantern ring by inserting a wire hook into the ring on the outer edge.
d) Clean the stuffing box.
An alternate method of removing the packing is to remove the upper-half casing (see the
Maintenance chapter). Remove the packing and lantern ring, and then inspect the sleeves
or the shaft. Replace the sleeves or the shaft if either is deeply grooved.
When mechanical seals are furnished, the description and identification are indicated on the
order forms. Installation drawings from the seal manufacturer are attached to pump. Most seals
are installed and adjusted at the factory. File these drawings for future use in maintenance and
adjustment of the seal whenever the pump is disassembled.
1. Stub sleeve
2. ID pilot fit in stuffing box
3. Standard flush gland with O-ring mounted stationary seat
Figure 29: S group pump — stub sleeve
The following figure illustrates a standard stepped sleeve used on the M group pumps to
reduce the mounting diameter down to the standard sleeve nut OD.
A liquid film is required between the seal faces for proper lubrication. If the liquid flashes to
vapor, then the faces will run dry and become damaged. This requires that the liquid be cooled
so that vapor pressure is well below stuffing box pressure. Consult with ITT Goulds for a
recommendation if there is any uncertainty. Refer to the drawing supplied by the seal
manufacturer for the location of the taps. You can use the following methods to flush and cool
the seal:
Cool liquid flushing Description
method
External source A clean, cool, compatible liquid is injected from an outside source directly into
the seal gland. Flushing liquid must be at a pressure 5–15 psi (0.34–1.03 bar)
greater than the pressure in the stuffing box. You must inject 1.5–2 gpm (2–8
lpm). You can install a control valve and rotometer in the inlet line for accurate
regulation.
Product cooling Pumped liquid is piped from the pump casing, is cooled in an external heat
exchanger, and is injected into the seal gland. You can install a control valve
and rotometer in the inlet line for accurate regulation.
WARNING:
Explosion risk. Rubbing could lead to excess heat generation and sparks. Rotate the shaft by
hand to make sure it rotates smoothly and that there is no rubbing.
Pump priming
CAUTION:
Do not run the pump dry.
NOTICE:
Make sure that the pump is properly primed. If it is not, then shut down the pump and
correct the condition.
WARNING:
• Risk of breach of containment and equipment damage. Excessive vibration levels can
cause damage to bearings, stuffing box, seal chamber, and/or mechanical seal. Observe
pump for vibration levels, bearing temperature, and excessive noise. If normal levels are
exceeded, shut down and resolve.
• Risk of explosion and serious physical injury. Do not operate pump with blocked system
piping or with suction or discharge valves closed. This can result in rapid heating and
vaporization of pumpage.
• Risk of equipment damage and serious physical injury. Heat build-up can cause rotating
parts to score or seize. Observe pump for excessive heat build-up. If normal levels are
exceeded, shut down and resolve.
CAUTION:
• Avoid increased radial load. Failure to do so can cause stress on the shaft and bearings.
NOTICE:
Cavitation can cause damage to the internal surfaces of the pump. Ensure net positive suction
head available (NPSHA) always exceeds NPSH required (NPSH3) as shown on the published
performance curve of the pump.
NOTICE:
Do not expose an idle pump to freezing conditions. Drain all liquid that is inside the pump.
Failure to do so can cause liquid to freeze and damage the pump.
The mechanical seal is adjusted at the factory. If the seal leaks slightly when the pump is first
started, then allow a few hours of run-in for the seal to adjust itself.
You must check the final alignment after the pump and driver are at operating temperature. For
initial alignment instructions, see the Installation chapter.
1. Run the unit under actual operating conditions for enough time to bring the pump, driver,
and associated system to operating temperature.
2. Shut down the pump and the driver.
3. Remove the coupling guard.
See Remove the coupling guard in the Maintenance chapter.
4. Check the alignment while the unit is still hot.
See Pump-to-driver alignment in the Installation chapter.
5. Reinstall the coupling guard.
6. Restart the pump and driver.
Maintenance
Maintenance schedule
CAUTION:
Shorten the inspection intervals if the pumped liquid is abrasive or corrosive, or if the
environment is classified as potentially explosive.
NOTICE:
This timetable assumes that the unit has been constantly monitored after startup. Adjust the
timetable for any extreme or unusual applications or conditions.
Monthly inspections
Check the bearing temperature with a thermometer. Do not check the temperature by hand. If
the bearings are running over 180°F (82°C), then there is too much or too little lubricant.
If changing the lubricant or adjusting to the proper level does not correct the condition, then
disassemble and inspect the bearings.
Three-month inspections
Perform these tasks every three months:
• Check the oil on oil-lubricated units.
• Check the grease-lubricated bearings for saponification. This condition is usually caused
by the infiltration of water or other fluid. Saponification gives the grease a whitish color. If
this condition occurs, then wash out the bearings with a clean industrial solvent and
replace the grease with the proper type as recommended.
Six-month inspections
Perform these tasks every six months:
• Check the packing and replace if necessary. Use the grade recommended. Make sure the
seal cages are centered in the stuffing box at the entrance of the stuffing box piping
connection.
• Take vibration readings on the bearing housings. Compare the readings with the last set of
readings to check for possible pump component failure.
• Check the shaft or shaft sleeve for scoring. Scoring accelerates packing wear.
• Check the alignment of the pump and driver. Shim the units if necessary. If misalignment
reoccurs frequently, then inspect the entire piping system. Unbolt the piping at the suction
and discharge flanges to see if it springs away, which indicates strain on the casing.
Inspect all piping supports for soundness and effective support of load. Correct as
necessary.
Annual inspections
Perform these inspections one time each year:
• Remove the upper half of the casing. Inspect the pump thoroughly for wear. Order
replacement parts if necessary.
• Check the wear ring clearances. Replace the wear rings when clearances become three
times their normal clearance or when you observe a significant decrease in discharge
pressure for the same flow rate.
Refer to Radial clearances (page 65) for standard clearances.
• Remove any deposit or scaling.
Flood-damaged pumps
If the pump is properly sealed at all joints and connected to both suction and discharge, then it
will exclude outside liquid. Therefore, it is only necessary to service the bearings, stuffing box,
and coupling after flood damage.
Perform the following service on a centrifugal pump after a flooded condition:
• Dismantle the frame, and then inspect the bearings for any rusted or badly worn surfaces.
Clean as necessary. If the bearings are free from rust and wear, then reassemble and
relubricate them with one of the recommended lubricants. Depending on the length of time
the pump has remained in the flooded area, it is unlikely that bearing replacement is
necessary. Only replace the bearings if rust or worn surfaces appear.
• Inspect the stuffing box and clean out any foreign matter that will clog the box. Replace
packing that appears to be worn or no longer regulates leakage properly. Clean and
thoroughly flush mechanical seals.
• Dismantle and thoroughly clean the couplings. Lubricate the couplings where required with
one of the lubricants recommended by the coupling manufacturer.
Bearing maintenance
These bearing lubrication sections list different temperatures of the pumped fluid. If the
pump is ATEX-certified and the temperature of the pumped fluid exceeds the permitted
temperature values, then consult your ITT representative.
NOTICE:
Risk of equipment damage. Ensure that the grease container, the greasing device, and the
fittings are clean. Failure to do so can result in impurities entering the bearing housing while
regreasing the bearings.
1. Relief plug
2. Fitting
Figure 34: Grease lubricated bearings
1. Wipe dirt from the grease fittings.
2. Remove the two grease-relief plugs on the bearing housings.
3. Fill both of the grease cavities through the fittings with a recommended grease until the
fresh grease comes out of the relief holes.
4. Run the pump for about 30 minutes or until grease no longer comes out of the housing.
5. Reinstall the grease-relief plugs.
6. Wipe off any excess grease.
7. Recheck the alignment.
The bearing temperature usually rises after you regrease due to an excess supply of grease.
Temperatures return to normal in about two to four operating hours as the pump runs and
purges the excess grease from the bearings.
Lubricating-grease requirements
Grease-lubricated ball bearings are standard on this model. A grease-lubricated bearing can be
identified by grease fittings located on the bearing housing.
Precautions
NOTICE:
• Avoid equipment damage or decreased performance. Never mix greases of different
consistencies (NLGI 1 or 3 with NLGI 2) or with different thickeners. For example, never
mix a lithium-based grease with a polyurea based grease. If it is necessary to change the
grease type or consistency, remove the rotor and old grease from the housing before
regreasing.
• Remove the bearings and old grease if you need to change the grease type or
consistency. Failure to do so may result in equipment damage or decreased performance.
Requirements
Keep the following points in mind when lubricating with grease:
• Grease must be of sodium or lithium base with a NLGI-2 consistency. Do not use graphite.
• Greases made from animal or vegetable oils are not recommended due to the danger of
deterioration and forming of acid.
Bearing temperatures
• Bearing temperatures up to 180°F (82°C) are normal. For accurate measurement, place a
contact-type thermometer against the bearing housing. Record the reading in a convenient
location for reference.
• The stability of the temperature, rather than the number of degrees, is the best indication
of normal operation. A sudden increase in temperature is an indication of danger and a
signal to investigate. Check the unit for abnormal hydraulic operation and unnecessary
loads, such as coupling misalignment. See Troubleshooting (page 70).
• Do not use the human hand as a thermometer. A temperature that feels hot to the hand
can vary from 120°F (49°C) to 130°F (54°C) depending upon the individual. Above this
temperature, the human hand can not accurately estimate temperature.
Bearing conditions
The life of a bearing can be drastically reduced if contaminated with even a small amount of
dust or dirt. All bearing assembly operations must be done in an environment that is as free of
dust as possible. All tools and hands must be kept clean.
If... Then...
New bearings need to be installed They must not be unwrapped, cleaned, or washed until just
before the time of installation.
Old bearings are contaminated They must be replaced. Washing bearings does not guarantee
cleanliness.
There is any question as to the condition It is always best to replace them. This may prevent an
of bearings unplanned shutdown. Check the bearing housing seals and
replace as required.
Coupling lubrication
Grid or gear-tooth couplings
Grid or gear-tooth couplings, such as Falk Grid Steelflex or Falk Crowned Tooth coupling, are
initially lubricated with Falk Long Term Grease (LTG) and do not require relubrication for up to
three years. If the coupling leaks grease or is exposed to extreme temperatures or excessive
moisture, then more frequent lubrication is required.
Use the grease recommendations from the coupling manufacturer for the best performance.
Flexible couplings
Flexible couplings, such as Wood’s Sure-Flex or Falk Torus coupling, provide smooth
transmission of power. There is no rubbing action of metal against rubber to cause wear.
Couplings are not affected by abrasives, dirt, or moisture. This eliminates the need for
lubrication or maintenance and provides clean and quiet performance.
If other types of couplings are used, then follow the maintenance instructions provided by the
coupling manufacturer.
Shaft-seal maintenance
Packed stuffing box maintenance
Check or instruction Explanation/comment
When starting a pump with fiber packing Never draw the gland to the point where the packing is
for the first time, make sure that the compressed too tightly and no leakage occurs. This will burn
packing is slightly loose without causing the packing, score the shaft sleeve, and prevent circulation of
an air leak. As the pump runs in, gradual- the liquid that cools the packing.
ly tighten the gland bolts evenly.
Turn the rotating element by hand. The stuffing box is improperly packed or adjusted if friction in
the box prevents turning the rotating element by hand. A
properly operated stuffing box runs lukewarm with a slow drip
of sealing liquid.
After the pump has been in operation for This indicates proper packing, shaft sleeve lubrication, and
some time and the packing is completely cooling.
run in, check that the stuffing box leaks at
the rate of 40–60 drops per minute. NOTICE:
Eccentricity of the shaft or sleeve through the packing can
result in excess leakage. Make sure that the parts are properly
centered.
Check the packing frequently and replace Six months is a reasonable expected life, depending on
as service indicates. operating conditions. Use a packing tool in order to remove all
old packing from the stuffing box. Never reuse old packing or
add new rings to old packing. Clean the stuffing box thorough-
ly before you install new packing.
Check the condition of the shaft or sleeve —
for possible scoring or eccentricity and
make replacements as necessary.
When placing new, non-asbestos pack- —
ing into the stuffing box, open the molded
rings sideways and push the joints into
the stuffing box first. Then install the rings
one at a time, making sure to seat each
ring firmly. Stagger the joints at a 90°
rotation from each preceding joint.
Disassembly
Disassembly precautions
WARNING:
• Risk of serious physical injury or death from rapid depressurization. Ensure pump is
isolated from system and pressure is relieved before disassembling pump, removing
plugs, opening vent or drain valves, or disconnecting piping.
• Risk of serious personal injury. Applying heat to impellers, propellers, or their retaining
devices can cause trapped liquid to rapidly expand and result in a violent explosion. This
manual clearly identifies accepted methods for disassembling units. These methods must
be adhered to. Never apply heat to aid in their removal unless explicitly stated in this
manual.
• Failure to disconnect and lock out driver power may result in serious physical injury or
death. Always disconnect and lock out power to the driver before performing any
installation or maintenance tasks.
• Electrical connections must be made by certified electricians in compliance with all
international, national, state, and local rules.
• Refer to driver/coupling/gear manufacturer's installation and operation manuals (IOM)
for specific instructions and recommendations.
• Handling heavy equipment poses a crush hazard. Use caution during handling and wear
appropriate Personal Protective Equipment (PPE, such as steel-toed shoes, gloves, etc.)
at all times.
• Precautions must be taken to prevent physical injury. The pump may handle hazardous
and/or toxic fluids. Proper personal protective equipment should be worn. Pumpage must
be handled and disposed of in conformance with applicable environmental regulations.
• Risk of serious personal injury from exposure to hazardous or toxic liquids. A small amount
of liquid will be present in certain areas like the seal chamber upon disassembly.
CAUTION:
• Avoid injury. Worn pump components can have sharp edges. Wear appropriate gloves
while handling these parts.
2. Slide the driver half of the coupling guard toward the pump.
1. Driver
2. Slide to remove
3. Remove the nut, bolt, and washers from the driver half of the coupling guard.
4. Remove the driver-side end plate.
1. End plate
2. Coupling guard half
3. Driver
5. Remove the driver half of the coupling guard:
a) Slightly spread the bottom apart.
b) Lift upwards.
1. Annular groove
2. Driver half of the coupling guard
3. Driver
1. Annular groove
2. Coupling guard half
3. Driver
6. Remove the remaining nut, bolt, and washers from the pump half of the coupling guard.
It is not necessary to remove the end plate from the pump side of the bearing housing. You
can access the bearing-housing tap bolts without removing this end plate if maintenance of
internal pump parts is necessary.
7. Remove the pump half of the coupling guard:
a) Slightly spread the bottom apart.
b) Lift upwards.
Group Instructions
S group M, L, XL groups
1. 469G
2. 426
3. Parting slot 1. 426
2. 425
3. 418
6. Remove the upper casing using a sling and hoist or a lift and lifting lugs.
WARNING:
Never attempt to lift the entire pump using lifting lugs.
NOTICE:
Do not remove bearings from the shaft unless you need to replace them.
1. Remove the screws (371C) and slide the housings (134) off the bearings (168 and 112)
and the shaft (122).
Make sure not to damage the oil seal (332).
2. Using snap ring pliers in order to remove the retaining ring (361) from the thrust end of the
shaft.
3. Remove the bearings (168 and 112) with a bearing puller.
Group Instructions
S Use a two-jaw puller on the end cover (109). Use caution not to damage
the end cover.
Group Instructions
M, X, XL Use a split-jaw puller on the back of the bearing (168 and 112).
Make sure not to damage the bearings. If the bearing needs to be reinstalled, then protect it
from contamination by wrapping it in clean cloth or paper.
4. For L and XL groups only, remove the radial bearing spacer (443T).
5. Remove the gaskets (360), bearing end covers (109), and deflectors (123).
6. Remove the outboard seal (332) from the coupling-end bearing housing, and remove the
inboard seal (333) from each end cover (109).
You can discard the old bearings and gasket.
Group Instructions
M, L, XL 1. Draw a mark on the shaft to indicate the location of the impeller hub.
2. Drive or press the impeller (101) off the shaft.
3. Remove the key (178).
Preassembly inspections
O-rings
Inspect the O-rings (497) and replace them if damaged.
Wear rings
When hydraulic performance has substantially reduced, replace the casing wear rings.
The original radial clearance between the impeller and the casing wear rings is shown in Radial
clearances (page 65).
NOTICE:
If the impeller was supplied without wear rings and excessive wear has occurred, then wear
rings can be fitted in the field. The impeller must then be remachined. Contact your local ITT
representative for details.
Shaft
Check the shaft (122) for runout to make sure that it is not bent. Straighten or replace the shaft
as necessary. Bearing seats must be in perfect condition. Check keyways for burrs or foreign
matter.
Impeller
Check the impeller (101). Replace the impeller if any of the following conditions exist:
• Excessive erosion, especially on inlet vanes
• Deterioration of the gasket mating surface to the point that the gasket (428) cannot seal
properly
• Excessive erosion of surfaces
If the impeller diameter needs to be cut, then make sure that it is dynamically-balanced. Grind
the outside of the shrouds near the periphery in order to correct imbalance.
Shaft sleeve
The sleeve (126) surface in the stuffing box area must be smooth and free of grooves. If there
are grooves, replace the shaft sleeve. The O-ring groove in the end of the sleeve nut must be in
good condition. The impeller end of the sleeve must be in good condition to ensure that the
gasket (428) will seal properly. The original diametric clearance between the shaft sleeve and
the stuffing box bushing is 0.030–0.034" (0.76–0.86 mm). If this clearance has increased to
more than 0.050–0.060" (1.27–1.5 mm), then the sleeve, and possibly the stuffing box bushing,
must be replaced.
Bearings
Check ball bearings (112 and 168) for visible wear. Slowly turn the races and look for pits or
worn areas on the balls or raceways.
Hold the inner race and spin the outer race. If there are rasping noises or the bearing catches
or binds, then replace the bearing. If any wear on the race is apparent, then replace the
bearing.
Replace ball bearings that are worn, loose, rough, or noisy when rotated.
Seals
Check the seals (332 and 333) for wear, cracks, cuts, deformities, and signs of excessive
leakage. Check the thrust-bearing end cover (109A) for signs of leakage and damage. Check
the grease fittings (113) or oil breathers (113A) (oil option) for serviceability and replace as
required.
General
Clean all parts before reassembly. This is especially important at O-ring grooves, gasket
surfaces, mating surfaces, and bearing areas. Check that threads on dowels, screws, nuts,
studs, and all gasket surfaces are in good condition. Make sure the anti-rotation pins (445A)
are firmly pressed into the wear rings (103).
Refer to Bearing maintenance (page 52) for specific instructions on cleaning bearings.
Radial clearances
Radial clearance between the impeller and casing wear rings
Reassembly
Install the impeller
CAUTION:
Check for magnetism on the pump shaft and demagnetize the shaft if there is any
detectable magnetism. Magnetism attracts ferritic objects to the impeller, seal, and bearings
which can result in excessive heat generation, sparks, and premature failure.
NOTICE:
The impeller and wear-ring clearance setting procedures must be followed. Improperly
setting the clearance or not following any of the proper procedures can result in sparks,
unexpected heat generation, and equipment damage.
Start the bearings (112 and 168) onto the shaft by tapping the inner race with a hammer or
mallet.
Keep the bearing square at all times.
3. After the bearing is started on shaft, use a driving sleeve in order to press or drive the
bearing until it contacts the shoulder on the inboard side of the seal.
Make sure that the sleeve contacts only one inner race.
4. For the outboard (thrust) bearing, install a tapered bearing-retaining ring (361) in the
retaining ring groove on the outboard (thrust) end of the shaft (122).
5. Slide the bearing housings (134) over the bearings.
6. Tighten the screws (371C) in two stages:
a) Using an X pattern, tighten the screws to 8 ft-lbs (11 Nm).
b) Again, using an X pattern, tighten the screws to 12 ft-lbs (16.3 Nm).
c) Repeat these steps on the opposite side.
1. Install the rotating element in the lower casing with a sling, adequate hoist, or lift.
Make sure that the casing wear ring (103) and anti-rotation pins (445A) seat properly in the
wear ring grooves and pin grooves.
2. Tighten or loosen the sleeve nuts with a strap wrench as required in order to center the
impeller in the seated wear rings.
For M, L, and XL groups, tighten the sleeve nuts (124) to 30 ft-lbs (40.7 Nm).
3. Tighten the sleeve nut setscrews (222B).
Make sure that the stuffing box bushings (125) are aligned properly in the stuffing boxes.
4. Tighten the bearing housing to the lower casing on each side.
a) Install and tighten the screws (372U) until snug.
b) Tighten the screws on each side to 40 ft-lbs (55 Nm).
c) Tighten each side to 59 ft-lbs (80 Nm).
Spare parts
Critical service spare parts
ITT recommends that you have spare parts available to insure against possible long and costly
downtime periods, especially on critical services.
Part Notes
Rotating element This is a group of assembled parts including a shaft,
impeller, bearings, bearing housings with seals, wear rings,
stuffing box bushings, and all rotating parts except the
coupling.
Stuffing box packing and lantern ring (if any) One set for each stuffing box.
Mechanical seals (if any) One seal for each stuffing box.
Ordering parts
Repair orders will be handled with the minimum of delay if the following directions are followed:
• Specify the model number, pump size, and serial number. These can all be obtained from
the nameplate.
• List plainly the names, part numbers, and materials of the parts required. These names
and numbers must agree with those in the Parts list chapter of this manual.
• Specify the number of parts required.
• Specify definite billing and shipping instructions.
Troubleshooting
Troubleshooting
Symptom Cause Remedy
The pump is not deliver- The pump is not primed. Re-prime the pump and check that the pump and suction
ing liquid. line are full of liquid.
The pump has lost prime. Check for leaks in the suction pipe joints and fittings.
Vent the casing to remove accumulated air. Check the
mechanical seal or packing.
The impeller is clogged. Back-flush the pump in order to clean the impeller.
The impeller is loose on the shaft. Check the key, locknut, and setscrews.
The shaft is rotating in the wrong direction. Change the rotation. The rotation must match the arrow
on the bearing housing or pump casing.
The shaft is not rotating at all. Check the power, coupling, line shaft, and shaft keys.
The foot valve or suction pipe opening is Consult an ITT representative for the proper submersion
not submerged enough. depth. Use a baffle to eliminate vortices.
The suction lift is too high. Check for obstructions at the inlet and make sure the
suction valves are open. Check for pipe friction losses.
Use a vacuum or compound gauge to check the NPSH
available.
The motor speed is too low. Make sure that the motor wiring is correct and receives
full voltage or that the turbine receives full steam
pressure. The motor can have an open phase.
The system static head is too high. Check with ITT to determine whether a larger impeller
can be used. If not, then cut pipe losses, increase the
speed, or both. Do not overload the driver.
The system head or discharge head is too Check for pipe friction losses and that the valves are
high. wide open. The condition can be corrected with larger
piping.
Parts list
Item Quantity per Part name Bronze-fitted All iron Iron/316 All 316SS
pump rotating
element
100 1 upper Casing 1003 - A743 CF-8M
1 lower
101 1 Impeller 1179 1000 316
102 2 Seal tubing (optional) Brass Steel 316
103 2 Casing wear ring 1618 1000 1071
105 2 Lantern ring Glass-filled Teflon
106 1 set Stuffing box packing Square non-asbestos (die-formed S and M groups)
107 2 Stuffing box gland AISI 316
109 2 Bearing end cover 1000
109A 1 Thrust bearing end cover Steel
112 1 Thrust ball bearing Steel
113 2 Grease fitting Steel
113A 2 Breather (oil lubrication only) Steel
122 1 Shaft AISI 4140
123 1 Deflector (optional) Laminated plastic
124 1 Sleeve nut (M, L, and XL only) 1618 1000 1071
125 2 Stuffing box bushing 316
126 2 Shaft sleeve (optional on S group) 1618 1000 316
134 2 Bearing housing 1000
Item Quantity per Part name Bronze-fitted All iron Iron/316 All 316SS
pump rotating
element
142 2 Impeller wear ring 1618 1000 316
168 1 Coupling ball bearing Steel
178 1 Impeller key AISI 1018
222B 4 Sleeve nut setscrews Steel
250 2 Mechancial seal gland (Flush 1179 1003 1002 316
STD)
2 Mechanical seal gland (FL-VT- Steel
DR, optional)
251 2 Sight oiler (optional oil lubrication) White metal and glass
317 2 Thrust mechanical seal (optional) Steel
317A 1 Radial mechanical seal (optional) Steel
320 6 Retaining setscrew (for optional 303 SS
impeller wear ring)
332 1 Oil seal outboard grease Buna rubber
332A 1 Labyrinth seal outboard (optional) Steel
333 1 Oil seal - inboard, grease Buna rubber
333A 1 Labyrinth seal inboard (optional) Steel
351 1 Parting casing gasket 1/32 in. non-asbestos
353 4 Gland studs 316
353B 2 Hex capscrew with cast iron me- Steel
chanical seal gland
4 Hex capscrew with steel mechani- Steel
cal seal gland
355 4 Gland stud hex nut 304
356A 4 Casing parting stud Steel
360 2 Gasket, end cover to bearing Kraft paper
housing
360Q 8 Gasket, gland to case Non-asbestos
361 1 Thrust bearing retaining ring Steel
361H 2 Impeller retaining ring (S group Steel Stainless steel
only)
371C 8 Hex capscrew Steel
372U 4 Hex capscrew Steel
418 2 Hex capscrew (casing jacking) Steel
425 4 Parting hex nuts Steel
426 Varies Hex capscrew (parting) Steel
428 2 Gasket, sleeve to impeller (M, L, 1/32 in. non-asbestos
and XL only)
445A 2 Anti-rotation pin, casing wear ring AISI 420 AISI 316
469G 2 Tapered pin with hex nut Steel
494 2 Cooling assembly (optional) Fitting copper tube
497 2 Sleeve nut O-ring (M, L, and XL Buna rubber
only)
Materials of construction
Code Specification
1000 Cast iron - ASTM A48 Class 25B
1003 Cast iron - ASTM A48 Class 30B
1179 Bronze - ASTM B584-UNS C87600
304 Wrought stainless - ASTM A276, Type 304
AISI 1018 ASTM A108, Grade 1018 -B1112
AISI 420 ASTM A276, Type 420
AISI 4140 ASTM A322, Grade 4140
1618 Bronze -ASTM B584 Alloy C80500
1071 Nitronic 60 - ASTM A743 Grade CF10SMnN