Calculation For Erection Beam

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

SUPERKRANE MITRA UTAMA

CALCULATION SHEET
FABRICATION OF PRECAST CONCRETE WORKS
FOR STOCK PREPARATION, AND PM MACHINE
AT PM#3 PROJECTS

Pangkalan Kerinci, KAB. PELALAWAN - RIAU


FOR ERECTION COLUMN CD.4D BOTTOM CRANE 500 TON FAR LIFTING
LOAD
1 Material 1.00 x 0.60 x 6.66 x 2.50 = 9.99 Ton
2 Lifting Device =
2.1 Block Crane properties = 3.5 Ton
2.2 Belt Slink 35 Ton Crane properties = 0.37 Ton
2.3 Wire Slink dia 3" Crane properties = 0.12 Ton
2.4 Shaft & lock AS PER ARRANGEMENT = 0.5 Ton
2.5 Other misceleanous = 1 Ton
TOTAL LOAD = 15.48 Ton

DATA OPERATION
1 Working Radius AS PER ARRANGEMENT = 42.00 METER
2 Boom Length AS PER ARRANGEMENT = 66.00 METER
3 Angle of Boom AS PER ARRANGEMENT = 53 DEGREE
4 Out Rigger Type AS PER ARRANGEMENT = FULL EXTENDED
5 Crane Type AS PER ARRANGEMENT = CRAWLER CRANE
6 Lifting Type AS PER ARRANGEMENT = 360 DEGREE
7 Crane Capacity AS PER ARRANGEMENT = 450 TON
8 SWL AS PER ARRANGEMENT = 22 TON
9 Ground Condition Actual = Good
=

Total Load = 15.48 Ton


Safety Working Load = 22 Ton
SAFETY FACTOR Safety Working Load / Total Load = 1.42

Status = OK

Preparation by, Checked by, Approved by,


PT. SUPERKRANE MITRA UTAMA PT. INDO KARYA BANGUN BERSAMA PT. INDO KARYA BANGUN BERSAMA

Mujtahid Robby Arifin A.S. Chauhan


Site Manager Civil Construction Superintendent Civil Construction Manager
Preparation by, Checked by, Approved by,
PT. SUPERKRANE MITRA UTAMA PT. INDO KARYA BANGUN BERSAMA PTSI

Sahrial Asma Junaedy Agustar


Safety Inspector OHS Officer Crane Departement