Bill No.7.2 - LV Distribution
Bill No.7.2 - LV Distribution
Bill No.7.2 - LV Distribution
2 - LV DISTRIBUTION
TOTAL 2,516,209,091.62
LV Distribution 121.0% USD 1
BILL NO. 7.2.1 - BASEMENT
Cod Quanti
e Description ty Unit Rate (LKR)
For the full description of materials,
plants/equipment/systems and workmanship refer
Note
"Specification of works", "Drawings" and "Pricing
Preambles".
Rate shall include for design (where necessary), supply,
install, testing, commissioning of Low Voltage
Distribution and Wiring System as per Drawings and
Note
Specifications and complete to working order with all
connections to the entire satisfaction of the
Engineer/Consultants.
The Bidder shall provide a schedule of all Builder's work
in connection with details of such items as necessary, Note
along with the Bid.
The Bidder shall provide all dimensions and technical
information of all necessary Builder's work to the
Note
Engineer in advance, in relation with the programme of
work.
Lower Ground
Front Podium
Electrical Switch Gear
Main Distribution Boards
Supply and installation of three phase & neutral, free
standing Main Distribution Board (FP/MDB(LV)/LG). It
shall comply with the specification and drawings. Allow
1 nr 37,804,243.11
for costs of testing, witnessing of testing at
manufacturer's works as specified, and commissioning
at site.
CABLES
FEEDER CABLES
Supply and Installation of LV Power Cables including all
accessories (except the cable management system).
4C 240 sq.mm CU/XLPE/SWA/PVC 205 m 35,777.02
4C 120 sq.mm Cu/XLPE/PVC 20 m 20,764.79
4C 25 sq.mm Cu/XLPE/PVC 5.00 m 6,907.99
4C 16 sq.mm Cu/XLPE/PVC 45 m 5,976.58
4C 10 sq.mm Cu/XLPE/PVC 190 m 4,933.90
4C 6 sq.mm Cu/XLPE/PVC 30 m 4,165.29
4C 4 sq.mm Cu/XLPE/PVC 30 m 3,619.22
Supply and installation of Fire Resistant Cables
(CU/MICA/XLPE/LOSH), with enhanced fire rating as
specified, including all accessories (except the cable
management system)
4C 300 sq. mm Fire Resistant Cable 90 m 52,507.83
4C 240 sq. mm Fire Resistant Cable 150 m 44,324.66
4C 95 sq. mm Fire Resistant Cable 25 m 22,033.12
4C 70 sq. mm Fire Resistant Cable 45 m 17,821.02
1x 4C 10 sq. mm Fire Resistant Cable 800 m 4,523.49
EARTH CABLES
Supply and Installation of Earth Cables including all
accessories (except the cable management system)
300 sq.mm Cu/PVC 90 m 11,832.13
240 sq.mm Cu/PVC 235 m 10,553.51
70 sq.mm Cu/PVC 20 m 4,575.56
50 sq.mm Cu/PVC 25 m 3,864.44
35 sq.mm Cu/PVC 45 m 3,363.50
16 sq.mm Cu/PVC 50 m 2,080.44
10 sq.mm Cu/PVC 990 m 1,964.84
6 sq.mm Cu/PVC 30 m 1,584.76
4 sq.mm Cu/PVC 30 m 1,546.23
SOCKET OUTLETS
Supply and Installation of Power Socket Outlets
including all accessories.
13A Switched-Single 190 nr 2,930.93
ISOLATORS
Supply and Installation of Power Isolating switches in
PVC/ in powder coated metal enclosure as specified.
1/E-ISO/LG/C.V-1 1 nr 16,345.06
1/E-ISO/LG/C.V-2 1 nr 16,345.06
1/E-ISO/LG/FSP-1 1 nr 16,345.06
1/E-ISO/LG/FSP-2 1 nr 16,345.06
1/E-ISO/LG/FSP-JP 1 nr 16,345.06
1/E-ISO/LG/FHP-1 1 nr 16,345.06
1/E-ISO/LG/FHP-2 1 nr 16,345.06
1/E-ISO/LG/FHP-JP 1 nr 16,345.06
1/ISO/LG/WP-1 1 nr 16,345.06
1/ISO/LG/WP-2 1 nr 16,345.06
1/ISO/LG/WP-3 1 nr 16,345.06
1/ISO/LG/WP-4 1 nr 16,345.06
1/ISO/LG/WP-5 1 nr 16,345.06
1/ISO/LG/SWP-1 PVC /IP65 1 nr 16,345.06
1/ISO/LG/SWP-2 PVC /IP66 1 nr 16,345.06
2/E-ISO/LG/C.V-1 1 nr 16,345.06
2/E-ISO/LG/C.V-2 1 nr 16,345.06
2/E-ISO/LG/C.V-3 1 nr 16,345.06
3/E-ISO/LG/C.V-1 1 nr 16,345.06
3/ISO/LG/SWP-1 PVC /IP65 1 nr 16,345.06
4/ISO/LG/SWP-1 PVC /IP65 1 nr 16,345.06
4/E-ISO/LG/C.V-1 1 nr 16,345.06
4/E-ISO/LG/C.V-2 1 nr 16,345.06
5/ISO/LG/SWP-1 PVC /IP65 1 nr 16,345.06
5/E-ISO/LG/C.V-1 1 nr 16,345.06
ISOLATOR WIRING
Wiring of Isolating switches including supply and
installation of required cables, PVC conduits,
accessories and all other materials required.
1/E-ISO/LG/C.V-1 1 nr 89,138.95
1/E-ISO/LG/C.V-2 1 nr 89,138.95
1/E-ISO/LG/FSP-1 1 nr 89,138.95
1/E-ISO/LG/FSP-2 1 nr 89,138.95
1/E-ISO/LG/FSP-JP 1 nr 89,138.95
1/E-ISO/LG/FHP-1 1 nr 89,138.95
1/E-ISO/LG/FHP-2 1 nr 89,138.95
1/E-ISO/LG/FHP-JP 1 nr 89,138.95
1/ISO/LG/WP-1 1 nr 89,138.95
1/ISO/LG/WP-2 1 nr 89,138.95
1/ISO/LG/WP-3 1 nr 89,138.95
1/ISO/LG/WP-4 1 nr 89,138.95
1/ISO/LG/WP-5 1 nr 89,138.95
1/ISO/LG/SWP-1 PVC /IP65 1 nr 89,138.95
1/ISO/LG/SWP-2 PVC /IP66 1 nr 89,138.95
2/E-ISO/LG/C.V-1 1 nr 89,138.95
2/E-ISO/LG/C.V-2 1 nr 89,138.95
2/E-ISO/LG/C.V-3 1 nr 89,138.95
3/E-ISO/LG/C.V-1 1 nr 89,138.95
3/ISO/LG/SWP-1 PVC /IP65 1 nr 89,138.95
4/ISO/LG/SWP-1 PVC /IP65 1 nr 89,138.95
4/E-ISO/LG/C.V-1 1 nr 89,138.95
4/E-ISO/LG/C.V-2 1 nr 89,138.95
5/ISO/LG/SWP-1 PVC /IP65 1 nr 89,138.95
5/E-ISO/LG/C.V-1 1 nr 89,138.95
Miscellaneous
Construct 900mm(w)x900mm(l)x750mm(d) RC.
Electrical Manhole complete with heavy duty cover slab
1 Item 82,425.20
as shown in the drawings
(all necessary materials & civil work to be included).
Supply and installation of 5 number of type 1000 PVC
conduit to pass through underground CEB cables into
1 Item 82,425.20
the building at Basement level with approved water
proofing method.
37,804,243.11
43,058,849.61
2,789,434.79
2,789,434.79
2,789,434.79
2,789,434.79
2,789,434.79
2,789,434.79
2,789,434.79
648,045.47
560,534.63
911,066.34
546,066.95
546,066.95
356,820.35
356,820.35
356,820.35
356,820.35
356,820.35
356,820.35
356,820.35
356,820.35
356,820.35
356,820.35
71,423.10
71,423.10
71,423.10
71,423.10
71,423.10
71,423.10
7,655,794.13
7,655,794.13
7,655,794.13
7,655,794.13
7,334,288.09
415,295.85
34,539.94
268,946.21
937,441.70
124,958.66
108,576.65
4,725,705.12
6,648,699.12
550,827.90
801,946.05
3,618,788.93
1,064,892.12
2,480,075.73
91,511.24
96,610.97
151,357.48
104,022.22
1,945,194.67
47,542.80
46,386.78
1,788,046.45
1,229,557.28
1,087,958.79
406,279.94
462,993.26
507,368.65
289,678.55
302,866.58
352,396.37
4,431,420.89
98,719.77
800,727.04
219,377.27
1,151,730.68
625,225.22
3,863,327.05
148,589.50
969,742.01
281,538.00
132,948.50
556,876.97
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
1,448,622.89
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
89,138.95
82,425.20
82,425.20
515,157.50
194,291,543.39
BILL NO. 7.2.2 - FRONT PODIUM
Cod Quanti
e Description ty Unit Rate (LKR)
For the full description of materials,
plants/equipment/systems and workmanship refer
Note
"Specification of works", "Drawings" and "Pricing
Preambles".
Rate shall include for design (where necessary), supply,
install, testing, commissioning of Low Voltage
Distribution and Wiring System as per Drawings and
Note
Specifications and complete to working order with all
connections to the entire satisfaction of the
Engineer/Consultants.
The Bidder shall provide a schedule of all Builder's work
in connection with details of such items as necessary, Note
along with the Bid.
The Bidder shall provide all dimensions and technical
information of all necessary Builder's work to the
Note
Engineer in advance, in relation with the programme of
work.
COMMON BACKBONE- FRONT PODIUM
Supply and installation of Busbar Trunking System
Supply and installation of any other accessories
required for Bus Trunking System (Details to be given
by Tenderer).
1600 A, Cu, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically 20 m 138,529.11
from TF/ T1 up to FP/MDB(LV)/LG.
1600 A, Cu, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically 20 m 138,529.11
from TF/ T2 up to FP/MDB(LV)/LG.
3200 A, Cu, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically 25 m 246,835.83
from TF/ (P1, P2) up to FP/MDB(LV)/LG.
3200 A, Cu, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically 25 m 246,835.83
from TF/ (P1, P2) up to FP/MDB(LV)/LG.
3200 A, Al, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically
95 m 246,835.83
from FP/MDB(LV)/LG to Lower Ground, Ground,
Level-1, Level 2
3200 A, Al, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically
95 m 246,835.83
from FP/MDB(LV)/LG to Level-3, Level 3 Mezzanine,
Level-4)
-
Supply and installation of vertical bus trunking tap-off
-
unit tap off units contained in a galvanized steel box.
-
400A, 3P MCCB (Category B) 11 nr 181,048.62
250A, 3P MCCB (Category B) 2 nr 134,496.92
125A, 3P MCCB (Category B) 1 nr 120,975.07
100A, 3P MCCB (Category B) 1 nr 84,986.17
60A, 3P MCCB (Category B) 2 nr 79,756.29
-
Supply and Installation of Cable Management System
-
including all accessories.
Cable Tray 400mm (W) x 150mm (H) -Heavy duty 75 m 11,722.49
Cable Tray 200mm (W) x 75mm (H) 75 m 7,026.04
Cable Tray 100mm (W) x 50mm (H) 75 m 4,240.56
-
Earthing System -
Podium area under Tower-1: -
Supply and installation of earth backbone,
25mm×2.5mm Cu tape horizontally and vertically
25 m 3,898.48
installed in electrical riser for LV system.- From Lower
Ground to Level-4.
1/LG/E 1 nr 45,455.63
1/G/E 1 nr 45,455.63
1/L1/E 1 nr 45,455.63
1/L2/E 1 nr 45,455.63
1/L3/E 1 nr 45,455.63
1/L3M/E 1 nr 45,455.63
1/L4/E 1 nr 45,455.63
Supply and installation of earth cables70mm sq.
Cu/PVC connecting above LV earth termination boxes 35 m 5,383.01
to LV earth backbone.
-
Earthing for Utility Power Supply -
Supply and installation of earth termination box as
1 Item 185,456.70
specified in drawings/ specification.
-
SOCKET OUTLETS -
Supply and Installation of Power Socket Outlets
-
including all accessories.
13A Switched- Single 153 nr 2,930.93
13A Switched-Twin 35 nr 3,286.36
20A DP 10 nr 22,170.51
-
ISOLATORS -
Supply and Installation of Power Isolating switches in
-
PVC/ in powder coated metal enclosure as specified.
1ISO/G/HVAC-ER1 1 nr 16,345.06
1ISO/G/HVAC-ER2 1 nr 16,345.06
1ISO/G/HVAC-ER3 1 nr 16,345.06
1ISO/G/HVAC-ER4 1 nr 16,345.06
2/ISO/LG/HVAC-FCC 1 nr 16,345.06
1/ISO/3ML/SP-1 1 nr 16,345.06
1/ISO/3ML/SP-2 1 nr 16,345.06
1/ISO/3ML/SP-3 1 nr 16,345.06
1/ISO/3ML/LIFT-1 1 nr 16,345.06
2/ISO/3ML/LIFT-1 1 nr 16,345.06
2/ISO/3ML/LIFT-2 1 nr 16,345.06
2/ISO/3ML/LIFT-3 1 nr 16,345.06
2/ISO/3ML/LIFT-FR 1 nr 16,345.06
2/E-ISO/3ML/LIFT-FIRE 1 nr 16,345.06
1/ISO/4L/HVAC-CH 1 nr 16,345.06
2/ISO/4L/HVAC-GYM 1 nr 16,345.06
-
POWER POINT WIRING -
Wiring of Power Socket Outlets including supply and
installation of 2×2.5 sqmm Cu/PVC/PVC+ 2.5 sqmm
-
Cu/PVC cables, PVC conduits, accessories and all
other materials required.
13A Switched- Single 143 nr 7,624.33
13A Switched-Twin 35 nr 7,624.33
13Asocket via 20A DP 10 nr 7,624.33
-
ISOLATOR WIRING -
Wiring of Isolating switches including supply and
installation of required cables, PVC conduits, -
accessories and all other materials required.
-
1ISO/G/HVAC-ER1 1 nr 36,351.58
1ISO/G/HVAC-ER2 1 nr 36,351.58
1ISO/G/HVAC-ER3 1 nr 36,351.58
1ISO/G/HVAC-ER4 1 nr 36,351.58
2/ISO/LG/HVAC-FCC 1 nr 36,351.58
1/ISO/3ML/SP-1 1 nr 36,351.58
1/ISO/3ML/SP-2 1 nr 36,351.58
1/ISO/3ML/SP-3 1 nr 36,351.58
1/ISO/3ML/LIFT-1 1 nr 36,351.58
2/ISO/3ML/LIFT-1 1 nr 36,351.58
2/ISO/3ML/LIFT-2 1 nr 36,351.58
2/ISO/3ML/LIFT-3 1 nr 36,351.58
2/ISO/3ML/LIFT-FR 1 nr 36,351.58
2/E-ISO/3ML/LIFT-FIRE 1 nr 36,351.58
1/ISO/4L/HVAC-CH 1 nr 36,351.58
2/ISO/4L/HVAC-GYM 1 nr 36,351.58
-
-
Testing and Commissioning -
Testing the entire installation and rectify any defects
and submit a certificate by a chartered electrical 1 Item 1,442,441.00
engineer
-
Any other item of work which are required, in the
opinion of the Bidder, for the completion of Works 1 Item 1,442,441.00
(Bidder shall list such items and price).
Total
Total (LKR)
2,770,582.27
2,770,582.27
6,170,895.66
6,170,895.66
23,449,403.51
23,449,403.51
-
-
-
1,991,534.77
268,993.85
120,975.07
84,986.17
159,512.57
-
-
879,186.69
526,953.12
318,042.09
-
-
-
97,462.04
45,455.63
45,455.63
45,455.63
45,455.63
45,455.63
45,455.63
45,455.63
188,405.50
-
-
185,456.70
350,307.10
433,874.57
-
-
185,456.70
350,307.10
433,874.57
-
-
185,456.70
350,307.10
433,874.57
-
-
185,456.70
350,307.10
433,874.57
-
-
208,777.62
-
-
206,063.00
-
-
-
-
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
-
-
-
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
250,506.02
-
-
-
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
209,411.99
-
-
-
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
106,545.06
-
-
-
1,160,485.39
2,916,977.37
6,771,844.57
3,979,104.54
33,719.85
398,745.51
381,898.95
1,982,677.41
338,397.23
221,894.72
-
1,524,028.52
-
-
645,372.38
366,044.96
2,404,902.14
1,225,486.36
832,177.78
392,968.62
887,465.54
170,084.87
-
-
-
585,712.33
702,604.16
652,775.27
203,139.97
810,238.20
253,684.32
289,678.55
302,866.58
176,198.18
-
-
493,598.86
98,719.77
691,038.41
4,058,479.53
1,371,107.95
778,789.31
197,439.54
241,315.00
43,875.45
87,750.91
493,598.86
800,727.04
1,371,107.95
219,377.27
109,688.64
2,961,593.17
1,151,730.68
1,206,574.99
2,742,215.90
383,910.23
3,290,659.07
438,754.54
109,688.64
109,688.64
-
-
-
-
98,719.77
153,564.09
1,173,668.40
372,941.36
109,688.64
32,906.59
658,131.81
-
-
-
6,670,886.58
46,923.00
391,025.00
1,415,510.52
250,256.00
-
-
2,826,047.83
9,278,857.04
-
-
-
448,432.51
115,022.74
221,705.09
-
-
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
-
-
1,090,279.33
266,851.59
76,243.31
-
-
-
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
-
-
-
1,442,441.00
1,442,441.00
176,892,571.62
BILL NO. 7.2.3 - REAR PODIUM
Cod Quanti
e Description ty Unit Rate (LKR) Total (LKR)
For the full description of materials,
plants/equipment/systems and workmanship refer
Note
"Specification of works", "Drawings" and "Pricing
Preambles".
Rate shall include for design (where necessary), supply,
install, testing, commissioning of Low Voltage
Distribution and Wiring System as per Drawings and
Note
Specifications and complete to working order with all
connections to the entire satisfaction of the
Engineer/Consultants.
The Bidder shall provide a schedule of all Builder's work
in connection with details of such items as necessary, Note
along with the Bid.
The Bidder shall provide all dimensions and technical
information of all necessary Builder's work to the
Note
Engineer in advance, in relation with the programme of
work.
- -
SOCKET OUTLETS - -
Supply and Installation of Power Socket Outlets
- -
including all accessories.
13A Switched- Single 488 nr 2,930.93 1,430,294.54
- -
ISOLATORS - -
Supply and Installation of Power Isolating switches in
- -
PVC/ in powder coated metal enclosure as specified.
3/ISO/G/GS-1 1 nr 16,345.06 16,345.06
3/ISO/G/GS-2 1 nr 16,345.06 16,345.06
3/ISO/L1/LIFT-S 1 nr 16,345.06 16,345.06
4/ISO/1L/HVAC-M.O1 1 nr 16,345.06 16,345.06
4/ISO/1L/HVAC-M.O2 1 nr 16,345.06 16,345.06
3/ISO/G/HVAC-ER 1 nr 16,345.06 16,345.06
- -
- -
POWER POINT WIRING - -
Wiring of Power Socket Outlets including supply and
installation of 2×2.5 sqmm Cu/PVC/PVC+ 2.5 sqmm
- -
Cu/PVC cables, PVC conduits, accessories and all
other materials required.
13A Switched- Single 488 nr 7,624.33 3,720,673.53
- -
ISOLATOR WIRING - -
Wiring of Isolating switches including supply and
installation of required cables, PVC conduits, - -
accessories and all other materials required.
3/ISO/G/GS-1 1 nr 32,230.32 32,230.32
3/ISO/G/GS-2 1 nr 32,230.32 32,230.32
3/ISO/L1/LIFT-S 1 nr 32,230.32 32,230.32
4/ISO/1L/HVAC-M.O1 1 nr 32,230.32 32,230.32
4/ISO/1L/HVAC-M.O2 1 nr 32,230.32 32,230.32
3/ISO/G/HVAC-ER 1 nr 32,230.32 32,230.32
- -
Testing and Commissioning - -
Testing the entire installation and rectify any defects
and submit a certificate by a chartered electrical 1 Item 1,442,441.00 1,442,441.00
engineer.
- -
Any other item of work which are required, in the
opinion of the Bidder, for the completion of Works 1 Item 1,442,441.00 1,442,441.00
(Bidder shall list such items and price).
Total ###
BILL NO. 7.2.4 - TOWER 1
Cod Quanti
e Description ty Unit Rate (LKR) Total (LKR)
For the full description of materials,
plants/equipment/systems and workmanship refer
Note
"Specification of works", "Drawings" and "Pricing
Preambles".
Rate shall include for design (where necessary), supply,
install, testing, commissioning of Low Voltage
Distribution and Wiring System as per Drawings and
Note
Specifications and complete to working order with all
connections to the entire satisfaction of the
Engineer/Consultants.
The Bidder shall provide a schedule of all Builder's work
in connection with details of such items as necessary, Note
along with the Bid.
The Bidder shall provide all dimensions and technical
information of all necessary Builder's work to the
Note
Engineer in advance, in relation with the programme of
work.
Apartments
ELECTRICAL SWITCHGEAR
Supply and Installation of Consumer Units (CU).
x/ CU/ TB/ zL/ 1E 2 nr 272,334.52 544,669.05
x= Tower 1/ Tower 2 - -
z= Level 10/ Level 21 - -
x/ CU/ TB/ zL/ 2S 27 nr 272,334.52 7,353,032.16
x= Tower 1/ Tower 2 - -
z= Level 5 to Level 31 - -
x/ CU/ TB/ zL/ 2T 27 nr 272,334.52 7,353,032.16
x= Tower 1/ Tower 2 - -
z= Level 5 to Level 31 - -
x/ CU/ TB/ zL/ 3A 27 nr 272,334.52 7,353,032.16
x= Tower 1/ Tower 2 - -
z= Level 5 to Level 31 - -
x/ CU/ TB/ zL/ 3B 27 nr 272,334.52 7,353,032.16
x= Tower 1/ Tower 2 - -
z= Level 5 to Level 31 - -
x/ CU/ TB/ zL/ 3C 25 nr 272,334.52 6,808,363.11
x= Tower 1/ Tower 2 - -
z= Level 5 to Level 31 except Level 10 & Level 21 - -
x/ CU/ TB/ zL/ 3R 27 nr 272,334.52 7,353,032.16
x= Tower 1/ Tower 2 - -
z= Level 5 to Level 31 - -
- -
CABLES - -
FEEDER CABLES - -
Supply and Installation of LV Power Cables including all
- -
accessories (except the cable management system).
4C × 6 sq.mm Cu/XLPE/PVC 3,345 m 3,540.50 11,842,957.02
- -
EARTH CABLES - -
Supply and Installation of Earth Cables including all
- -
accessories (except the cable management system).
16 sq.mm Cu/PVC 3,345 m 2,080.44 6,959,086.66
- -
CABLE MANAGEMENT SYSTEM - -
GI CONDUITS - -
Supply and Installation of GI conduits including brass
glands and sockets to connect the flexible conduit to the - -
metal trunking.
50 mm diameter 1,337 m 3,615.92 4,834,491.33
- -
LIGHT FITTINGS AND FANS - -
Supply and Installation of Light Fittings and fans as
specified in the drawings and specifications including all - -
accessories.
LF-4 2,231 nr 10,968.86 24,471,534.65
LF-5 324 nr 10,968.86 3,553,911.80
LF-7 561 nr 10,968.86 6,153,532.47
LF-8 322 nr 10,968.86 3,531,974.07
LF-16 162 nr 10,968.86 1,776,955.90
LF-18 299 m 10,968.86 3,279,690.21
LF-23 455 nr 10,968.86 4,990,832.93
Fans 590 nr 10,968.86 6,471,629.51
- -
Supply and Installation of Emergency Light Fittings as
specified in the drawings and specifications including all - -
accessories.
LF-7 E 162 nr 10,968.86 1,776,955.90
- -
LIGHT POINT WIRING - -
Wiring of Light Points including supply and installation
of 1.5 sqmm Cu/PVC+ 2.5 sqmm Cu/PVC cables,
- -
conduits, junction boxes, flush mounted switch and all
other required material.
One Way 2,910 nr 7,820.50 22,757,655.28
Two way/ Intermediate 1,444 nr 7,820.50 11,292,802.14
Emergency Lamps 162 nr 7,820.50 1,266,921.02
Fan point wiring with hum free electronic type regulator 590 nr 7,820.50 4,614,095.06
- -
Extending the wiring from the nearest light point for
exhaust fans including supply and installation of 1.5
sqmm Cu/PVC+ 2.5 sqmm Cu/PVC cables, conduits, 212 nr 11,561.32 2,450,999.30
junction boxes, flush switch and all other required
materials.
- -
SOCKET OUTLETS - -
Supply and Installation of Power Socket Outlets
- -
including all accessories.
13A Switched- Single 2,742 nr 2,930.93 8,036,613.98
13A Switched-Twin 1,294 nr 2,930.93 3,792,625.27
20A DP Switch 1,429 nr 3,343.06 4,777,229.07
Shaver Sockets 322 nr 3,343.06 1,076,464.49
- -
ISOLATORS - -
Supply and Installation of Power Isolating switches in
- -
PVC/ in powder coated metal enclosure as specified.
20A 2P Isolator in PVC enclosure 162 nr 16,345.06 2,647,899.65
- -
POWER POINT WIRING - -
Wiring of Power Socket Outlets including supply and
installation of 2×2.5 sqmm Cu/PVC/PVC+ 2.5 sqmm
- -
Cu/PVC cables, conduits, accessories and all other
material required.
13A Switched-Single 1,313 nr 7,624.33 10,010,746.60
13A Switched-Twin 1,294 nr 7,624.33 9,865,884.31
13A Switched-Single Via 20A DP Switch 1,429 nr 7,624.33 10,895,169.00
Shaver Sockets 322 nr 7,624.33 2,455,034.58
- -
ISOLATOR WIRING - -
Wiring of Isolating switches including supply and
installation of required cables, conduits, accessories - -
and all other materials required.
20A 2P Isolator 162 nr 36,351.58 5,888,955.26
- -
COMMON WORKS - -
Supply and Installation of Bus bar Trunking System - -
Supply and installation of any other accessories
required for Bus Trunking System (Details to be given - -
by Tenderer)
1600 A, Al, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically 160 m 138,529.11 22,164,658.17
from FP/MDB(LV)/LG up to Level-31
- -
Supply and installation of vertical bus trunking tap-off
- -
unit tap off units contained in a galvanized steel box
400A, 3P MCCB (Category B) 2 nr 181,048.62 362,097.23
250A, 3P MCCB (Category B) 1 nr 134,496.92 134,496.92
160A, 3P MCCB (Category B) 1 nr 128,090.42 128,090.42
125A, 3P MCCB (Category B) 27 nr 120,975.07 3,266,326.87
- -
CABLES - -
FEEDER CABLES - -
Supply and Installation of LV Power Cables including all
- -
accessories (except the cable management system)
1x 4C 50 sq.mm Cu/XLPE/PVC 150 m 19,030.15 2,854,521.92
1x 4C 150 sq.mm Cu/XLPE/PVC 55 m 25,602.61 1,408,143.63
4Cx 10 sq.mm Cu/XLPE/PVC Cable 5.0 m 9,830.77 49,153.84
- -
Supply and installation of Fire Resistant Cables
(CU/MICA/XLPE/LOSH), with enhanced fire rating as
- -
specified, including all accessories (except the cable
management system)
4C 185 sq.mm Fire Resistant Cable 280 m 26,580.69 7,442,594.31
4C 95 sq.mm Fire Resistant Cable 30 m 10,651.28 319,538.44
4C 35 sq.mm Fire Resistant Cable 135 m 14,478.39 1,954,582.15
4C 25 sq.mm Fire Resistant Cable 10 m 10,522.80 105,228.02
4C 10 sq.mm Fire Resistant Cable 10 m 8,844.83 88,448.31
2C 6 sq.mm Fire Resistant Cable 30 m 5,736.18 172,085.31
- -
EARTH CABLES - -
Supply and Installation of Earth Cables including all
- -
accessories (except the cable management system)
95 sq.mm Cu/PVC 140 m 9,346.80 1,308,552.31
70 sq.mm Cu/PVC 185 m 8,957.96 1,657,222.85
50 sq.mm Cu/PVC 30 m 8,246.84 247,405.14
35 sq.mm Cu/PVC 60 m 7,745.90 464,753.93
25 sq.mm Cu/PVC 150 m 5,306.94 796,040.74
16 sq.mm Cu/PVC 60 m 5,096.75 305,805.24
10 sq.mm Cu/PVC 10 m 4,981.15 49,811.53
6 sq.mm Cu/PVC 30 m 4,601.07 138,032.08
- -
CABLE MANAGEMENT SYSTEM - -
Supply and Installation of Cable Management System
- -
including all accessories.
Cable Tray 400mm (W) x 150mm (H) -Heavy duty 100 m 11,899.70 1,189,970.34
Cable Tray 200mm (W) x 75mm (H) 50 m 7,026.04 351,302.08
Cable Tray 150mm (W) x 100mm (H) 975 m 6,906.53 6,733,861.95
Cable Tray 100mm (W) x 100mm (H) 75 m 4,522.87 339,215.06
Cable Tray 100mm (W) x 50mm (H) 100 m 4,240.56 424,056.11
GI Conduits 20mm diameter 100 m 2,031.40 203,139.97
GI Conduits 25mm diameter 100 m 2,314.97 231,496.63
GI Conduits 32mm diameter 100 m 2,536.84 253,684.32
PVC Conduits 20mm diameter 100 m 1,448.39 144,839.27
PVC Conduits 25mm diameter 100 m 1,514.33 151,433.29
PVC Conduits 32mm diameter 100 m 1,761.98 176,198.18
- -
Earthing System - -
Supply and installation of earth backbone,
25mm×2.5mm Cu tape vertically installed in electrical
100 m 4,175.55 417,555.24
riser for LV system.- From Level-5 to Lift Machine
Room.
Supply and installation of earth termination box at
electrical riser of each level and connected to Copper
tape earth inside the electrical riser, as specified in - -
drawings (Rate excluding the cost for earth cables).-
From Level-5 to Lift Machine Room Level.
X/L5/E 1 nr 10,424.73 10,424.73
X/L6/E 1 nr 10,424.73 10,424.73
X/L7/E 1 nr 10,424.73 10,424.73
X/L8/E 1 nr 10,424.73 10,424.73
X/L9/E 1 nr 10,424.73 10,424.73
X/L10/E 1 nr 10,424.73 10,424.73
X/L11/E 1 nr 10,424.73 10,424.73
X/L12/E 1 nr 10,424.73 10,424.73
X/L13/E 1 nr 10,424.73 10,424.73
X/L14/E 1 nr 10,424.73 10,424.73
X/L15/E 1 nr 10,424.73 10,424.73
X/L16/E 1 nr 10,424.73 10,424.73
X/L17/E 1 nr 10,424.73 10,424.73
X/L18/E 1 nr 10,424.73 10,424.73
X/L19/E 1 nr 10,424.73 10,424.73
X/L20/E 1 nr 10,424.73 10,424.73
X/L21/E 1 nr 10,424.73 10,424.73
X/L22/E 1 nr 10,424.73 10,424.73
X/L23/E 1 nr 10,424.73 10,424.73
X/L24/E 1 nr 10,424.73 10,424.73
X/L25/E 1 nr 10,424.73 10,424.73
X/L26/E 1 nr 10,424.73 10,424.73
X/L27/E 1 nr 10,424.73 10,424.73
X/L28/E 1 nr 10,424.73 10,424.73
X/L29/E 1 nr 10,424.73 10,424.73
X/L30/E 1 nr 10,424.73 10,424.73
X/L31/E 1 nr 10,424.73 10,424.73
X/LMR/E 1 nr 10,424.73 10,424.73
- -
Level 5-31, except for Level 6,9,12,15,18,21,24,27,30 - -
ELECTRICAL SWITCHGEAR - -
Supply and Installation of Floor Distribution Boards
- -
(FDB)
z/FDB/TB/yL 18 nr 356,964.60 6,425,362.78
z= Tower 1/Tower 2 - -
y= Level 5 to Level 31 except for Level
- -
6,9,12,15,18,21,24,27,30
z/FDB/TB/yL 9 nr 356,964.60 3,212,681.39
z= Tower 1/Tower 2 - -
y= Level 6,9,12,15,18,21,24,27,30 - -
z/CU/TB/yL/COM 9 nr 356,964.60 3,212,681.39
z= Tower 1/Tower 2 - -
y= Level 6,9,12,15,18,21,24,27,30 - -
z/FDB/TB/LM 1 nr 356,964.60 356,964.60
z= Tower 1/Tower 2 - -
- -
Supply and Installation of Distribution
- -
Boards/Consumer Units (DB/CU)
z/DB/TB/LM 1 nr 272,334.52 272,334.52
z= Tower 1/Tower 2 - -
z/CU/TB/LM 1 nr 272,334.52 272,334.52
z= Tower 1/Tower 2 - -
- -
Supply and Installation Fire cable Terminal Boxes. - -
z/EDB/FIRE/L21 1 nr 96,150.66 96,150.66
z= Tower 1/Tower 2 - -
z/ECU/FIRE/L21 1 nr 96,150.66 96,150.66
z= Tower 1/Tower 2 - -
z/Ecu/FIRE/LM 1 nr 96,150.66 96,150.66
z= Tower 1/Tower 2 - -
- -
Supply and Installation of UL listed FM Approved
- -
Automatic Transfer Units (ATS)
z/FATS/FSP/L21 1 nr 148,696.72 148,696.72
z= Tower 1/Tower 2 - -
z/FATS/FHP/L21 1 nr 148,696.72 148,696.72
z= Tower 1/Tower 2 - -
z/FATS/FS/LM 1 nr 148,696.72 148,696.72
z= Tower 1/Tower 2 - -
- -
LIGHT FITTINGS AND FANS - -
Supply and Installation of Light Fittings as specified in
the drawings and specifications including all - -
accessories.
LF-1 6 nr 10,968.86 65,813.18
LF-3 34 nr 10,968.86 372,941.36
LF-9 309 nr 10,968.86 3,389,378.85
Supply and Installation of Emergency Light Fittings as
specified in the drawings and specifications including all - -
accessories.
LF-1 E 2 nr 10,968.86 21,937.73
LF-9 E 151 nr 10,968.86 1,656,298.40
- -
LIGHT POINT WIRING - -
Wiring of Light Points including supply and installation
of 1.5 sqmm Cu/PVC+ 2.5 sqmm Cu/PVC cables,
- -
conduits, junction boxes, flush switch and all other
required materials.
One Way 349 nr 12,282.02 4,286,424.83
Two Way/Intermediate Emergency 58 nr 12,282.02 712,357.14
Emergency Lamps Non Maintain type 59 nr 12,282.02 724,639.15
- -
- -
SOCKET OUTLETS - -
Supply and Installation of Power Socket Outlets
- -
including all accessories.
13A Switched- Single 168 nr 2,930.93 492,396.48
16A Industrial Socket outlet 3 nr 3,343.06 10,029.17
- -
ISOLATORS - -
Supply and Installation of Power Isolating switches in
- -
PVC/ in powder coated metal enclosure as specified.
100A 4P Isolator in PVC enclosure 4 nr 16,345.06 65,380.24
X/E-ISO/LM/HVAC-SPF 1 nr 16,345.06 16,345.06
X/E-ISO/LM/LIFT-FIRE 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-1 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-2 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-3 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-4 1 nr 16,345.06 16,345.06
X/ISO/LM/LIFT-1 1 nr 16,345.06 16,345.06
X/ISO/LM/LIFT-2 1 nr 16,345.06 16,345.06
X/ISO/LM/LIFT-G 1 nr 16,345.06 16,345.06
X/ISO/LM/BP-1 1 nr 16,345.06 16,345.06
X/ISO/LM/BP-2 1 nr 16,345.06 16,345.06
X/ISO/LM/BP-3 1 nr 16,345.06 16,345.06
- -
- -
POWER POINT WIRING - -
Wiring of Power Socket Outlets including supply and
installation of 2×2.5 sqmm Cu/PVC/PVC+ 2.5 sqmm
- -
Cu/PVC cables, conduits, accessories and all other
materials required.
13A Switched- Single 168 nr 7,624.33 1,280,887.61
13A Industrial Socket outlet 3 nr 7,624.33 22,872.99
- -
ISOLATOR WIRING - -
Wiring of Isolating switches including supply and
installation of required cables, conduits, accessories - -
and all other materials required.
100A 4P Isolator - 4×35 sqmm Fire Resistant Cable +
4 nr 36,351.58 145,406.30
16 sqmm Cu/PVC cable
X/ISO/LM/HVAC-SPF 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-FIRE 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-1 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-2 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-3 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-4 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-1 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-2 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-G 1 nr 36,351.58 36,351.58
X/ISO/LM/BP-1 1 nr 36,351.58 36,351.58
X/ISO/LM/BP-2 1 nr 36,351.58 36,351.58
X/ISO/LM/BP-3 1 nr 36,351.58 36,351.58
- -
Fire Barriers - -
Supply and installation of Fire Barriers for the LV/ ELV
risers using approved material and method -From 1 Item 1,442,441.00 1,442,441.00
Level-5 to Machine Room Level
- -
Testing and Commissioning - -
Testing the entire installation and rectify any defects
and submit a certificate by a chartered electrical 1 Item 1,442,441.00 1,442,441.00
engineer
- -
Any other item of work which are required, in the
opinion of the Bidder, for the completion of Works
(Bidder shall list such items and price).
Total 313,167,981.04
BILL NO. 7.2.5 - TOWER 2 (Similar to Tower 1)
Cod Quanti Rate
e Description ty Unit (LKR) Total (LKR)
Similar to Tower 1 313,167,981.04
Total 313,167,981.04
BILL NO. 7.2.6 - TOWER 3
Cod Quanti
e Description ty Unit Rate (LKR) Total (LKR)
For the full description of materials,
plants/equipment/systems and workmanship refer
Note
"Specification of works", "Drawings" and "Pricing
Preambles".
Rate shall include for design (where necessary), supply,
install, testing, commissioning of Low Voltage
Distribution and Wiring System as per Drawings and
Note
Specifications and complete to working order with all
connections to the entire satisfaction of the
Engineer/Consultants.
The Bidder shall provide a schedule of all Builder's work
in connection with details of such items as necessary, Note
along with the Bid.
The Bidder shall provide all dimensions and technical
information of all necessary Builder's work to the
Note
Engineer in advance, in relation with the programme of
work.
Apartments
ELECTRICAL SWITCHGEAR
Supply and Installation of Consumer Units (CU).
x/ CU/ TB/ zL/ P 6 nr 231,484.35 1,388,906.08
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 8/ Level 9/ Level 10 - -
P= Apartment 1A/ Apartment 1B - -
x/ CU/ TB/ zL/ P 8 nr 231,484.35 1,851,874.77
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7/ Level 8/ Level 9/ Level 10 - -
P= Apartment 1C/ Apartment 1D - -
x/ CU/ TB/ zL/ P 4 nr 231,484.35 925,937.38
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7/ Level 8/ Level 9/ Level 10 - -
P= Apartment 1.5A/1.5B/1.5C/1.5D - -
x/ CU/ TB/ zL/ P 10 nr 231,484.35 2,314,843.46
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7/ Level 8/ Level 9 - -
P= Apartment 1.5A1/ 1.5B1/ 1.5C1/ 1.5D1 - -
x/ CU/ TB/ zL/ P 14 nr 231,484.35 3,240,780.84
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7/ Level 8/ Level 9/ Level 10 - -
P= Apartment 2A/2B/ 2C/ 2D - -
x/ CU/ TB/ zL/ P 48 nr 231,484.35 11,111,248.60
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 11 to Level 34 - -
P= Apartment 2F/ Apartment 2G - -
x/ CU/ TB/ zL/ P 48 nr 231,484.35 11,111,248.60
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 11 to Level 34 - -
P= Apartment 2H/ Apartment 2J - -
x/ CU/ TB/ zL/ P 2 nr 231,484.35 462,968.69
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7 - -
P= Apartment 2P/ Apartment 2Q - -
x/ CU/ TB/ zL/ P 2 nr 231,484.35 462,968.69
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7 - -
P= Apartment 2.5P/ Apartment 2.5Q - -
x/ CU/ TB/ zL/ P 96 nr 231,484.35 22,222,497.21
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 11 to Level 34 - -
P= Apartment 3F/ 3G/ 3H/ 3J - -
x/ CU/ TB/ zL/ P 2 nr 231,484.35 462,968.69
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 7 - -
P= Apartment 3P/ Apartment 3Q - -
x/ CU/ TB/ zL/ P 4 nr 231,484.35 925,937.38
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 35/ Level 36 - -
P= Apartment 4D/ Apartment 4E - -
x/ CU/ TB/ zL/ P 4 nr 231,484.35 925,937.38
x= Tower 3/ Tower 4/ Tower 5 - -
z= Level 35/ Level 36 - -
P= Apartment 4F/ Apartment 4G - -
- -
- -
CABLES - -
FEEDER CABLES - -
Supply and Installation of LV Power Cables including all
- -
accessories (except the cable management system).
4C × 6 sq.mm Cu/XLPE/PVC 6,266 m 3,540.50 22,184,744.00
EARTH CABLES - -
Supply and Installation of Earth Cables including all
- -
accessories (except the cable management system).
6 sq.mm Cu/PVC 6,266 m 2,414.26 15,127,740.91
CABLE MANAGEMENT SYSTEM - -
GI CONDUITS - -
Supply and Installation of GI conduits including brass
glands and sockets to connect the flexible conduit to the - -
metal trunking.
50 mm diameter 2,748 m 3,615.92 9,936,561.10
LIGHT FITTINGS AND FANS - -
Supply and Installation of Light Fittings and fans as
specified in the drawings and specifications including all - -
accessories.
LF-4 3,222 nr 10,968.86 35,341,678.47
LF-5 310 nr 10,968.86 3,400,347.71
LF-7 820 nr 10,968.86 8,994,468.14
LF-8 506 nr 10,968.86 5,550,244.97
LF 15 6 nr 10,968.86 65,813.18
LF-16 242 nr 10,968.86 2,654,464.99
LF-17 4 nr 10,968.86 43,875.45
LF-18 502 m 10,968.86 5,506,369.52
LF-21 24 nr 10,968.86 263,252.73
LF-22 18 nr 10,968.86 197,439.54
LF-23 392 nr 10,968.86 4,299,794.52
Fans 844 nr 15,090.12 12,736,064.30
- -
Supply and Installation of Emergency Light Fittings as
specified in the drawings and specifications including all - -
accessories.
LF-7 E 260 nr 10,968.86 2,851,904.53
LIGHT POINT WIRING - -
Wiring of Light Points including supply and installation
of 1.5 sq mm Cu/PVC+ 2.5 sq mm Cu/PVC cables,
- -
conduits, junction boxes, flush mounted switch and all
other required material.
One Way 4,442 nr 12,282.02 54,556,730.93
Two Way 1,683 nr 12,282.02 20,670,638.94
Emergency Lamps 260 nr 12,282.02 3,193,325.09
Fan point wiring with hum free electronic type regulator 844 nr 12,282.02 10,366,024.52
- -
Extending the wiring from the nearest light point for
exhaust fans including supply and installation of 1.5 sq
mm Cu/PVC+ 2.5 sq mm Cu/PVC cables, conduits, 382 nr - -
junction boxes, flush switch and all other required
materials.
SOCKET OUTLETS - -
Supply and Installation of Power Socket Outlets
- -
including all accessories.
13A Switched- Single 3,930 nr 2,930.93 11,518,560.52
13A Switched-Twin 1,994 nr 2,930.93 5,844,277.27
20A DP Switch 2,098 nr 3,343.06 7,013,734.49
Shaver Sockets 478 nr 3,343.06 1,597,981.45
20A-Flex Outlet 8 nr 3,343.06 26,744.46
- -
ISOLATORS - -
Supply and Installation of Power Isolating switches in
- -
PVC/ in powder coated metal enclosure as specified.
20A 2P Isolator in PVC enclosure 250 nr 16,345.06 4,086,264.89
POWER POINT WIRING - -
Wiring of Power Socket Outlets including supply and
installation of 2×2.5 sq mm Cu/PVC/PVC+ 2.5 sq mm
- -
Cu/PVC cables, conduits, accessories and all other
material required.
13A Switched-Single 1,836 nr 7,624.33 13,998,271.72
13A Switched-Twin 1,994 nr 7,624.33 15,202,916.01
13A Switched-Single Via 20A DP Switch 2,090 nr 7,624.33 15,934,851.79
Shaver Sockets 478 nr 7,624.33 3,644,430.22
20A-Flex Outlet Control Via 20A DP 8 nr 7,624.33 60,994.65
- -
ISOLATOR WIRING - -
Wiring of Isolating switches including supply and
installation of required cables, conduits, accessories - -
and all other materials required.
20A 2P Isolator - 2×4 sq mm Cu/PVC/PVC+4 sq mm
250 nr 36,351.58 9,087,893.92
Cu/PVC cable
- -
Common works - -
COMMON BACKBONE - -
- -
Supply and Installation of Busbar Trunking System - -
Supply and installation of any other accessories
required for Bus Trunking System (Details to be given - -
by Tenderer)
2500 A, Al, 3P, 100% N with integral Earth busbar
trunking system installed horizontally and vertically 190 m 208,155.74 39,549,590.72
from RP/MDB(LV)/LG up to Level-36
- -
Supply and installation of vertical bus trunking tap-off
- -
unit tap off units contained in a galvanized steel box
250A, 3P MCCB (Category B) 3 nr 108,529.45 325,588.35
160A, 3P MCCB (Category B) 1 nr 102,122.95 102,122.95
125A, 3P MCCB (Category B) 6 nr 95,007.60 570,045.58
100A, 3P MCCB (Category B) 48 nr 59,018.69 2,832,897.33
- -
Supply and installation of Fire Resistant Cables
(CU/MICA/XLPE/LOSH), with enhanced fire rating as
- -
specified, including all accessories (except the cable
management system)
4C 185 sq.mm Fire Resistant Cable 370 m 26,580.69 9,834,856.76
4c 95 sq.mm Fire Resistant Cable 30 m 20,353.04 610,591.09
4C 35 sq.mm Fire Resistant Cable 120 m 14,478.39 1,737,406.36
4C 25 sq.mm Fire Resistant Cable 10 m 10,522.80 105,228.02
4C 10 sq.mm Fire Resistant Cable 10 m 8,844.83 88,448.31
2C 6 sq.mm Fire Resistant Cable 20 m 5,736.18 114,723.54
- -
CABLES - -
FEEDER CABLES - -
Supply and Installation of LV Power Cables including all
- -
accessories (except the cable management system)
4C 50 sq.mm Cu/XLPE/PVC 320 m 16,161.61 5,171,715.82
4C 120 sq.mm Cu/XLPE/PVC Cable 25 m 22,316.51 557,912.69
4C 10 sq.mm Cu/XLPE/PVC Cable 5.00 m 8,844.83 44,224.16
- -
EARTH CABLES - -
Supply and Installation of Earth Cables including all
- -
accessories (except the cable management system)
95 sq.mm Cu/PVC 100 m 7,201.72 720,172.05
70 sq.mm Cu/PVC 195 m 6,812.88 1,328,511.52
50 sq.mm Cu/PVC 30 m 6,101.76 183,052.69
35 sq.mm Cu/PVC 40 m 5,600.82 224,032.68
25 sq.mm Cu/PVC 320 m 4,074.84 1,303,948.00
16 sq.mm Cu/PVC 120 m 3,864.65 463,758.39
10 sq.mm Cu/PVC 5.00 m 3,749.05 18,745.26
6 sq.mm Cu/PVC 20 m 3,368.97 67,379.37
- -
- -
CABLE MANAGEMENT SYSTEM - -
Supply and Installation of Cable Management System
- -
including all accessories.
Cable Tray 400mm (W) x 150mm (H) -Heavy duty 100 m 11,920.31 1,192,030.97
Cable Tray 200mm (W) x 75mm (H) 50 m 7,026.04 351,302.08
Cable Tray 100mm (W) x 50mm (H) 50 m 4,240.56 212,028.06
Cable Trunking 100mm (W) x 100mm (H) 40 m 4,522.87 180,914.70
Cable Tray 150mm (W) x 100mm (H) 375 m 5,209.06 1,953,396.46
GI Conduits 20mm diameter 50 m 2,031.40 101,569.99
GI Conduits 25mm diameter 50 m 2,314.97 115,748.31
GI Conduits 32mm diameter 50 m 2,536.84 126,842.16
PVC Conduits 20mm diameter 50 m 1,448.39 72,419.64
PVC Conduits 25mm diameter 50 m 1,514.33 75,716.64
PVC Conduits 32mm diameter 50 m 1,761.98 88,099.09
- -
Earthing System - -
Supply and installation of earth backbone,
25mm×2.5mm Cu tape vertically installed in electrical
130 m 4,175.55 542,821.82
riser for LV system.- From Level-6 to Lift Machine
Room.
Supply and installation of earth termination box at
electrical riser of each level for LV system and
connected to Copper tape earth inside the electrical
- -
riser, as specified in drawings (Rate excluding the cost
for earth cables).- From Level-6 to Lift Machine Room
Level.
X/L6/E 1 nr 10,424.73 10,424.73
X/L7/E 1 nr 10,424.73 10,424.73
X/L8/E 1 nr 10,424.73 10,424.73
X/L9/E 1 nr 10,424.73 10,424.73
X/L10/E 1 nr 10,424.73 10,424.73
X/L11/E 1 nr 10,424.73 10,424.73
X/L12/E 1 nr 10,424.73 10,424.73
X/L13/E 1 nr 10,424.73 10,424.73
X/L14/E 1 nr 10,424.73 10,424.73
X/L15/E 1 nr 10,424.73 10,424.73
X/L16/E 1 nr 10,424.73 10,424.73
X/L17/E 1 nr 10,424.73 10,424.73
X/L18/E 1 nr 10,424.73 10,424.73
X/L19/E 1 nr 10,424.73 10,424.73
X/L20/E 1 nr 10,424.73 10,424.73
X/L21/E 1 nr 10,424.73 10,424.73
X/L22/E 1 nr 10,424.73 10,424.73
X/L23/E 1 nr 10,424.73 10,424.73
X/L24/E 1 nr 10,424.73 10,424.73
X/L25/E 1 nr 10,424.73 10,424.73
X/L26/E 1 nr 10,424.73 10,424.73
X/L27/E 1 nr 10,424.73 10,424.73
X/L28/E 1 nr 10,424.73 10,424.73
X/L29/E 1 nr 10,424.73 10,424.73
X/L30/E 1 nr 10,424.73 10,424.73
X/L31/E 1 nr 10,424.73 10,424.73
X/L32/E 1 nr 10,424.73 10,424.73
X/L33/E 1 nr 10,424.73 10,424.73
X/L34/E 1 nr 10,424.73 10,424.73
X/L35/E 1 nr 10,424.73 10,424.73
X/L36/E 1 nr 10,424.73 10,424.73
X/LMR/E 1 nr 10,424.73 10,424.73
Supply and installation of earth cables 70mm Sq
Cu/PVC connecting above LV earth termination boxes 150 m 14,103.18 2,115,476.97
to LV earth backbone.
- -
ELECTRICAL SWITCHGEAR - -
Supply and Installation of Floor Distribution Boards
- -
(FDB)
Z/FDB/TB/yL 22 nr 356,964.60 7,853,221.17
Z=Tower3/Tower 5 - -
y= Level 5 to Level 36 except for Level-
- -
8,11,14,17,20,23,26,29,32,35
Z/FDB/TB/yL 10 nr 356,964.60 3,569,645.99
Z=Tower3/Tower 5 - -
y= Level 8,11,14,17,20,23,26,29,32,35 - -
Z/CU/TB/yL/COM 10 nr 356,964.60 3,569,645.99
Z=Tower3/Tower 5 - -
y= Level 8,11,14,17,20,23,26,29,32,35 - -
Z/FDB/TB2/LM 1 nr 356,964.60 356,964.60
Z=Tower3/Tower 5 - -
- -
Supply and Installation of Distribution Boards Consumer
- -
Units (DB/CU).
X/DB/TB2/LM 1 nr 272,334.52 272,334.52
X/CU/TB2/LM 1 nr 272,334.52 272,334.52
- -
Supply and Installation Fire cable Terminal Boxes. - -
X/EDB/FIRE/L28 1 nr 45,455.63 45,455.63
X/ECU/FIRE/L28 1 nr 45,455.63 45,455.63
X/ECU/FIRE/LM 1 nr 45,455.63 45,455.63
- -
Supply and Installation of UL listed FM Approved
- -
Automatic Transfer Units (ATS)
X/FATS/FS/LM 1 nr 122,729.25 122,729.25
X/FATS/FSP/L28 1 nr 122,729.25 122,729.25
X/FATS/FHP/L28 1 nr 122,729.25 122,729.25
- -
LIGHT FITTINGS AND FANS - -
Supply and Installation of Light Fittings as specified in
the drawings and specifications including all - -
accessories.
LF-1 9 nr 10,968.86 98,719.77
LF-3 40 nr 10,968.86 438,754.54
LF-9 388 nr 10,968.86 4,255,919.07
LF-31 90 nr 10,968.86 987,197.72
- -
Supply and Installation of Emergency Light Fittings as
specified in the drawings and specifications including all - -
accessories.
LF-1 E 6 nr 10,968.86 65,813.18
LF-3 E 4 nr 10,968.86 43,875.45
LF-9 E 90 nr 10,968.86 987,197.72
LF-30 E 46 nr 10,968.86 504,567.72
LF-31 E 20 nr 10,968.86 219,377.27
- -
LIGHT POINT WIRING - -
Wiring of Light Points including supply and installation
of 1.5 sqmm Cu/PVC+ 2.5 sqmm Cu/PVC cables,
- -
conduits, junction boxes, flush switch and all other
required materials.
One Way 527 nr 12,282.02 6,472,624.31
Two Way 4 nr 12,282.02 49,128.08
Intermediate 66 nr 12,282.02 810,613.29
Emergency Lamps 100 nr 12,282.02 1,228,201.96
Exit Lamps Non Maintain type 38 nr 12,282.02 466,716.74
- -
SOCKET OUTLETS - -
Supply and Installation of Power Socket Outlets
- -
including all accessories.
13A Switched- Single 192 nr 2,930.93 562,738.83
16A Industrial Socket Outlet (IP65) 3 nr 3,343.06 10,029.17
- -
ISOLATORS - -
Supply and Installation of Power Isolating switches in
- -
PVC/ in powder coated metal enclosure as specified.
X/E-/ISO/LM/HVAC-SPF 1 nr 16,345.06 16,345.06
X/E-ISO/LM/LIFT-FIRE 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-1 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-2 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-3 1 nr 16,345.06 16,345.06
X/ISO/LM/HVAC-4 1 nr 16,345.06 16,345.06
X/ISO/LM/LIFT-1 1 nr 16,345.06 16,345.06
X/ISO/LM/LIFT-2 1 nr 16,345.06 16,345.06
X/ISO/LM/LIFT-G 1 nr 16,345.06 16,345.06
X/ISO/LM/BP-1 1 nr 16,345.06 16,345.06
X/ISO/LM/BP-2 1 nr 16,345.06 16,345.06
X/ISO/LM/BP-3 1 nr 16,345.06 16,345.06
- -
POWER POINT WIRING - -
Wiring of Power Socket Outlets including supply and
installation of 2×2.5 sqmm Cu/PVC/PVC+ 2.5 sqmm
- -
Cu/PVC cables, conduits, accessories and all other
materials required.
13A Switched- Single 192 nr 7,624.33 1,463,871.55
16A Industrial Socket Outlet 3 nr 9,272.84 27,818.51
- -
ISOLATOR WIRING - -
Wiring of Isolating switches including supply and
installation of required cables, conduits, accessories - -
and all other materials required.
X/E-/ISO/LM/HVAC-SPF 1 nr 36,351.58 36,351.58
X/E-ISO/LM/LIFT-FIRE 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-1 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-2 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-3 1 nr 36,351.58 36,351.58
X/ISO/LM/HVAC-4 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-1 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-2 1 nr 36,351.58 36,351.58
X/ISO/LM/LIFT-G 1 nr 36,351.58 36,351.58
X/ISO/LM/BP-1 1 nr 36,351.58 36,351.58
X/ISO/LM/BP-2 1 nr 36,351.58 36,351.58
X/ISO/LM/BP-3 1 nr 36,351.58 36,351.58
- -
Fire Barriers - -
Supply and installation of Fire Barriers for the LV/ ELV
risers using approved material and method -From 1 Item 1,442,441.00 1,442,441.00
Level-5 to Machine Room Level
- -
Testing and Commissioning - -
Testing the entire installation and rectify any defects
and submit a certificate by a chartered electrical 1 Item 1,442,441.00 1,442,441.00
engineer
1,634,007.15
-
-
2,178,676.20
-
-
1,089,338.10
-
-
2,723,345.25
-
-
3,812,683.34
-
-
13,072,057.18
-
-
13,072,057.18
-
-
1,634,007.15
-
-
544,669.05
-
-
544,669.05
-
-
24,510,107.21
-
-
544,669.05
-
-
1,089,338.10
-
-
1,089,338.10
-
-
-
-
-
22,290,958.86
-
5,851,032.44
-
-
9,274,886.91
-
35,144,238.92
3,400,347.71
9,191,907.68
5,616,058.15
65,813.18
2,654,464.99
43,875.45
5,506,369.52
263,252.73
197,439.54
4,233,981.34
131,626.36
12,645,523.56
-
2,851,904.53
-
34,785,584.43
13,208,824.66
2,033,330.03
6,553,579.08
-
4,485,791.17
-
-
10,481,010.80
5,844,277.27
6,164,597.90
1,597,981.45
26,744.46
-
-
4,184,335.24
-
13,235,838.62
15,202,916.01
14,021,144.71
3,644,430.22
74,182.68
-
-
-
9,306,003.38
-
-
-
-
39,549,590.72
-
-
325,588.35
102,122.95
570,045.58
2,832,897.33
-
-
-
11,570,419.72
718,342.46
2,044,007.48
123,797.67
104,056.84
134,968.87
-
-
-
5,171,715.82
557,912.69
44,224.16
-
-
-
720,172.05
1,328,511.52
183,052.69
224,032.68
1,303,948.00
463,758.39
18,745.26
67,379.37
-
-
-
-
1,192,030.97
351,302.08
212,028.06
180,914.70
1,953,396.46
101,569.99
115,748.31
126,842.16
72,419.64
75,716.64
88,099.09
-
-
542,821.82
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
10,424.73
2,115,476.97
-
-
-
-
7,853,221.17
-
3,569,645.99
-
3,569,645.99
-
356,964.60
-
-
272,334.52
272,334.52
-
-
45,455.63
45,455.63
45,455.63
-
-
246,367.05
246,367.05
246,367.05
-
-
98,719.77
438,754.54
4,255,919.07
987,197.72
-
65,813.18
43,875.45
987,197.72
504,567.72
219,377.27
-
-
6,472,624.31
49,128.08
810,613.29
1,228,201.96
454,434.72
-
-
-
562,738.83
8,792.79
-
-
65,380.24
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
16,345.06
-
-
-
1,463,871.55
22,872.99
-
-
145,406.30
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
36,351.58
-
-
1,442,441.00
-
-
1,442,441.00
1,442,441.00
447,989,249.85
BILL NO. 7.2.8 - TOWER 5 (Similar to Tower 3)
Cod Quanti
e Description ty Unit Rate (LKR) Total (LKR)
Similar to Tower 3 475,392,540
Total 475,392,540