Check Sheet For Scope of Works: Name of Sub-Contractor

This document is a check sheet for the scope of work for a sub-contractor. It includes 8 sections (A-H) outlining various work items that are either included or excluded from the sub-contractor's scope. Section A covers general work items like providing manpower, tools, and safety controls. Section B addresses site offices. Section C lists temporary facilities. Section D outlines storage and security. Section E covers unloading and unpacking. Section F includes various erection works. Section G is for site testing and commissioning assistance. Section H has site cleaning. The check sheet indicates whether each work item is included or excluded from the sub-contractor's responsibilities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views3 pages

Check Sheet For Scope of Works: Name of Sub-Contractor

This document is a check sheet for the scope of work for a sub-contractor. It includes 8 sections (A-H) outlining various work items that are either included or excluded from the sub-contractor's scope. Section A covers general work items like providing manpower, tools, and safety controls. Section B addresses site offices. Section C lists temporary facilities. Section D outlines storage and security. Section E covers unloading and unpacking. Section F includes various erection works. Section G is for site testing and commissioning assistance. Section H has site cleaning. The check sheet indicates whether each work item is included or excluded from the sub-contractor's responsibilities.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

NAME OF SUB-CONTRACTOR :

CHECK SHEET FOR SCOPE OF WORKS


INCLUDE
NO WORK DESCRIPTION D
EXCLUDED
A GENERAL


1 provide necessary man-power for performance of complete erection works

2 provide necessary tools,vehicles, cranes, lorry etc. for completion erection works


3 daily/weekly/monthly progress report

4 performance bond

5 guarantee/warranty bond

6 workmen's compensation policy for sub-contractor's personnel

7 accommodation & transportation for sub-contractor's personnel

8 safety control

B OFFICE


1 provide site office for HICO

2 provide site office for sub-contractor

C TEMPORARY FACILITIES


1 installation & removal of temporary electricity supply

2 installation & removal of temporary water supply

3 installation & removal of temporary telephone facilities

4 installation & removal of temporary lighting facilities

5 monthly charge of usage of electricity, water & telephone

6 provide portable fire extinguishers

D STORAGE & KEEPING


1 provide portable cabin storage

2 provide covered storage (indoor)

3 provide fencing & gate for open yard storage

4 provide store keeper

5 provide security guard
E UNLOADING & UNPACKING AT SITE


1 handling & transportation of all equipment & materials within the site

2 provide unloading facilities

3 provide unloading works at site

4 provide unpacking of all crates/packages

5 general checking & inspection of equipment at site

F ERECTION WORKS


1 provide oil filtering/purification plant

2 include vacuum & oil filteration works

3 assisting unloading main body of power x-former to plinth

4 fixing all x-former accessories

5 pilot cable laying (if any)

6 assisting 230 & 132kv power cable seaing ends works

7 230 & 132kv power cable laying

8 LV cable laying & termination

9 fixing,installation/assembly & setting for cable rack, cable tray & ladder

10 installation/assembly & setting for substation computer-based control system
11 provide all fixing & anchor bolt,support and base channel for installation of equipment, √
SWGR & panels etc.


12 provide touch-up paint for all equipments

13 touch-up painting works for all equipments

14 provided special provision as mentioned in the General Requirements

G SITE TEST & COMMISSIONING


1 provide site test & commissioning

2 provide site test & commissioning assistance

H OTHERS


1 site/equipment cleaning & waste disposal
2