0% found this document useful (0 votes)
314 views58 pages

Prokon Footing

The document provides design calculations for the foundation of a column supporting a floor slab. Input data includes dimensions of the column base, soil properties, loading, and material strengths. The output includes calculations of soil pressure, safety factors, moments and shear stresses on the base, and required reinforcing steel. Flexural reinforcement of 223 mm2/m is designed for the bottom of the base in the X-direction to resist a moment of 27.88 kNm/m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
314 views58 pages

Prokon Footing

The document provides design calculations for the foundation of a column supporting a floor slab. Input data includes dimensions of the column base, soil properties, loading, and material strengths. The output includes calculations of soil pressure, safety factors, moments and shear stresses on the base, and required reinforcing steel. Flexural reinforcement of 223 mm2/m is designed for the bottom of the base in the X-direction to resist a moment of 27.88 kNm/m.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 58

Job Number Sheet

Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Column Base Design : F1
C15
Input Data

Base length A (m) 1.40


Base width B (m) 1.70
Column(s) Col 1 Col 2
C (m) 0.2
D (m) 0.4
E (m)
F (m)
Stub column height X (m) 0.65
Base depth Y (m) 0.35
Soil cover Z (m) 0.60
Concrete density (kN/m 3) 25
Soil density (kN/m 3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 60
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 60
ULS ovt. LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m²) 120
S.F. Overturning (ULS) 1
S.F. Slip (ULS) 1
fcu base (MPa) 35
fcu columns (MPa) 35
fy (MPa) 460
Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Loading Data

Unfactored Loads

Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
1 1 1.6 1.6 230
Sketch of Base

BS8110 - 1997 Y

C1
X
B

D1

A
Y

Mx
P

Hx

X
Z

Y
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Output for Load Case 1
Note: The calculated flexural reinforcement was used in the calculations.

Output for Load Case 1


Soil pressure (ULS)(kN/m²) 182.25
Soil pressure (SLS)(kN/m²) 116.37
SF overturning (SLS) >100
SF overturning (ULS) >100
Safety Factor slip (ULS) >100
Safety Factor uplift (ULS) >100
Bottom
Design moment X (kNm/m) 27.88
Reinforcement X (mm²/m) 223
Design moment Y (kNm/m) 32.72
Reinforcement Y (mm²/m) 271
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm²/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm²/m) 0
Linear Shear X (MPa) 0.155
vc (MPa) 0.404
Linear Shear Y (MPa) 0.191
vc (MPa) 0.407
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) 0.107
vc (MPa) 0.405
vcu (MPa) 4.73
v col face (MPa) 1.18
Cost 370.14

Load Case:1 Legend


Max M (+)
BS8110 - 1997 Y Y Max M (-)
Max Shear

0.20 0.20
X X
1.70

1.70

0.40 0.40

1.40 1.40
Y Y

Mx Mx
P P

Hx Hx
0.60

0.60

0.65 0.65
0.35 0.35

116.37 kN/m² 182.25 kN/m²


Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Reinforcement Calculation for X-direction:Positive Moments

Load Case 1

Design moment:27.88 kNm/m

Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
300
=
.00219
1+
.0035
= 184.534 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 184.519 mm

Depth of rectangular stress block:

a = b. x
= .9 ×150
= 135.000 mm

Concrete moment capacity: 3.4.4.4


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
135
= 135 × 300 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 488.255 kNm

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f. b . d 2 . f cu
2788×104
= 300 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×300 2 ×35
= 296.983 mm

Lever arm limitation 3.4.4.4

z = min(296.983 , 0.95*300.000) = 285.000 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
2788×104
=
438.1 ×285
= 223.293 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(300 - 285 )
=
.9
= 33.333 mm

Reinforcement Calculation for Y-direction:Positive Moments

Load Case 1

Design moment:32.72 kNm/m


Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
290
=
.00219
1+
.0035
= 178.383 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 178.368 mm

Depth of rectangular stress block:

a = b. x
= .9 ×145
= 130.500 mm

Concrete moment capacity: 3.4.4.4

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
130.5
= 130.5 × 290 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 456.247 kNm
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .

3272×104
= 290 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×290 2 ×35
= 286.327 mm

Lever arm limitation 3.4.4.4

z = min(286.327 , 0.95*290.000) = 275.500 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
3272×104
=
438.1 ×275.5
= 271.093 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(290 - 275.5 )
=
.9
= 32.222 mm

Punching Shear Stress/Reinforcement Calculation

Load Case 1

Column number:1

The shear force outside the critical perimeter amounts to:44.23 kN

Calculation of required punching shear reinforcement:

Area used for shear


Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Ash = ucrit. d
= 1400 ×295
= 413.0×103 mm²

% Rebar in X - direction tab 3.11

100 . Asx
F1x =
xb. d
100 ×312.59
=
1400 ×295
= 0.0757

% Rebar in Y - direction tab 3.11

100 . Asy
F1y =
yb. d
100 ×404.57
=
1 492.5 ×295
= 0.0919

tab 3.11

F1x = min(0.15 , F1x ) = 0.150

tab 3.11

F1y = min(0.15 , F1y ) = 0.150

tab 3.11

400
F2 =
d
400
=
295
= 1.356

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

0.79 .
v cx = F1x0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

tab 3.11

0.79 .
v cy = F1y0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

Weighted average of vc

v cx. nx. xb + v cy. ny. yb


vc =
nx. xb + ny. yb
.36236 ×2 ×1400 + .36236 ×0 ×1 492.5
=
2 ×1400 + 0 ×1 492.5
= 0.3624 MPa

Actual shear stress

Veff
vv =
Ash
44233
=
413000
= 0.1071 MPa

tab 3.11

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

v c = v c_. F3
= .36236 ×1.1187
= 0.4054 MPa

Shear capacity without reinforcement

v c. Ash
Vcap =
1000
.40537 ×413000
=
1000
= 167.418 kN

The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required

Shear Stress/Reinforcement Calculation for Y-direction

Load Case 1

Design shear force:55.29 kN


Based on flexural reinforcement of:271mm²/m

Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×290 - (1000 - 0 )×0
= 290.0×103 mm²

Reinforcement ratio 3.4.5.4-6

Ast
F1 =
Ash
271.07
=
290000
= 0.0009

f 1 = f 1i. 100
= .00093 ×100
= 0.0930
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
F1 = min(3 , F1 ) = 0.093

F1 = max(0.15 , F1 ) = 0.150 3.4.5.4-6

400
f2 =
de
400
=
290
= 1.379

0.79 . 0.33333. 0.25


vc = F1 F2
1.25
0.79
= ×.15 0.33333×1.3793 0.25
1.25
= 0.3639 MPa

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

v c = v c1. F3
= .36391 ×1.1187
= 0.4071 MPa

Maximum allowable shear stress

v cu = 0.8 . f cu
= 0.8 × 35
= 4.733 MPa

vcu = min(5 , vcu ) = 4.733

Actual Shear stress:

V . 1×103
v=
Ash
55.292 ×1×103
=
290000
= 0.1907 MPa
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Shear force capacity

Vco = v c. Ash. 1×10-3


= .40711 ×290000 ×1×10-3
= 118.062 kN

Shear reinforcement Table 3.16

(v - v c). b
Asv/sv =
0.95 . f yv
(.19066 - .40711 )×1000
=
0.95 ×460
= -0.4953

Minimum links Table 3.16

0.40 . b
Asv/svn=
0.95 . f yv
0.40 ×1000
=
0.95 ×460
= 0.9153
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Column Base Design : F2
C15
Input Data

Base length A (m) 1.25


Base width B (m) 1.5
Column(s) Col 1 Col 2
C (m) 0.2
D (m) 0.4
E (m)
F (m)
Stub column height X (m) 0.65
Base depth Y (m) 0.35
Soil cover Z (m) 0.60
Concrete density (kN/m 3) 25
Soil density (kN/m 3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 60
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 60
ULS ovt. LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m²) 120
S.F. Overturning (ULS) 1
S.F. Slip (ULS) 1
fcu base (MPa) 35
fcu columns (MPa) 35
fy (MPa) 460
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Loading Data

Unfactored Loads

Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
1 1 1.6 1.6 185

Sketch of Base

BS8110 - 1997 Y

C1
X
B

D1

A
Y
Mx
P

Hx

X
Z

Y
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Output for Load Case 1
Note: The calculated flexural reinforcement was used in the calculations.

Output for Load Case 1


Soil pressure (ULS)(kN/m²) 185.56
Soil pressure (SLS)(kN/m²) 118.45
SF overturning (SLS) >100
SF overturning (ULS) >100
Safety Factor slip (ULS) >100
Safety Factor uplift (ULS) >100
Bottom
Design moment X (kNm/m) 21.80
Reinforcement X (mm²/m) 175
Design moment Y (kNm/m) 23.93
Reinforcement Y (mm²/m) 198
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm²/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm²/m) 0
Linear Shear X (MPa) 0.119
vc (MPa) 0.404
Linear Shear Y (MPa) 0.143
vc (MPa) 0.407
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) 0.052
vc (MPa) 0.405
vcu (MPa) 4.73
v col face (MPa) 0.94
Cost 284.45

Load Case:1 Legend


Max M (+)
BS8110 - 1997 Y Y Max M (-)
Max Shear

0.20 0.20
X X
1.50

1.50

0.40 0.40

1.25 1.25
Y Y

Mx Mx
P P

Hx Hx
0.60

0.60

0.65 0.65

0.35 0.35

118.45 kN/m² 185.56 kN/m²


Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Reinforcement Calculation for X-direction:Positive Moments

Load Case 1

Design moment:21.80 kNm/m

Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
300
=
.00219
1+
.0035
= 184.534 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 184.519 mm

Depth of rectangular stress block:

a = b. x
= .9 ×150
= 135.000 mm

Concrete moment capacity: 3.4.4.4


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
135
= 135 × 300 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 488.255 kNm

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f. b . d 2 . f cu
2180×104
= 300 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×300 2 ×35
= 297.646 mm

Lever arm limitation 3.4.4.4

z = min(297.646 , 0.95*300.000) = 285.000 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
2180×104
=
438.1 ×285
= 174.598 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(300 - 285 )
=
.9
= 33.333 mm

Reinforcement Calculation for Y-direction:Positive Moments

Load Case 1

Design moment:23.93 kNm/m


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
290
=
.00219
1+
.0035
= 178.383 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 178.368 mm

Depth of rectangular stress block:

a = b. x
= .9 ×145
= 130.500 mm

Concrete moment capacity: 3.4.4.4

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
130.5
= 130.5 × 290 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 456.247 kNm
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .

2393×104
= 290 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×290 2 ×35
= 287.323 mm

Lever arm limitation 3.4.4.4

z = min(287.323 , 0.95*290.000) = 275.500 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
2393×104
=
438.1 ×275.5
= 198.266 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(290 - 275.5 )
=
.9
= 32.222 mm

Punching Shear Stress/Reinforcement Calculation

Load Case 1

Column number:1

The shear force outside the critical perimeter amounts to:19.28 kN

Calculation of required punching shear reinforcement:

Area used for shear


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Ash = ucrit. d
= 1250 ×295
= 368.8×103 mm²

% Rebar in X - direction tab 3.11

100 . Asx
F1x =
xb. d
100 ×218.26
=
1250 ×295
= 0.0592

% Rebar in Y - direction tab 3.11

100 . Asy
F1y =
yb. d
100 ×276.04
=
1 392.5 ×295
= 0.0672

tab 3.11

F1x = min(0.15 , F1x ) = 0.150

tab 3.11

F1y = min(0.15 , F1y ) = 0.150

tab 3.11

400
F2 =
d
400
=
295
= 1.356

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

0.79 .
v cx = F1x0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

tab 3.11

0.79 .
v cy = F1y0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

Weighted average of vc

v cx. nx. xb + v cy. ny. yb


vc =
nx. xb + ny. yb
.36236 ×2 ×1250 + .36236 ×0 ×1 392.5
=
2 ×1250 + 0 ×1 392.5
= 0.3624 MPa

Actual shear stress

Veff
vv =
Ash
19280
=
368750
= 0.0523 MPa

tab 3.11

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

v c = v c_. F3
= .36236 ×1.1187
= 0.4054 MPa

Shear capacity without reinforcement

v c. Ash
Vcap =
1000
.40537 ×368750
=
1000
= 149.480 kN

The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required

Shear Stress/Reinforcement Calculation for Y-direction

Load Case 1

Design shear force:41.53 kN


Based on flexural reinforcement of:198mm²/m

Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×290 - (1000 - 0 )×0
= 290.0×103 mm²

Reinforcement ratio 3.4.5.4-6

Ast
F1 =
Ash
198.24
=
290000
= 0.0007

f 1 = f 1i. 100
= .00068 ×100
= 0.0680
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
F1 = min(3 , F1 ) = 0.068

F1 = max(0.15 , F1 ) = 0.150 3.4.5.4-6

400
f2 =
de
400
=
290
= 1.379

0.79 . 0.33333. 0.25


vc = F1 F2
1.25
0.79
= ×.15 0.33333×1.3793 0.25
1.25
= 0.3639 MPa

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

v c = v c1. F3
= .36391 ×1.1187
= 0.4071 MPa

Maximum allowable shear stress

v cu = 0.8 . f cu
= 0.8 × 35
= 4.733 MPa

vcu = min(5 , vcu ) = 4.733

Actual Shear stress:

V . 1×103
v=
Ash
41.525 ×1×103
=
290000
= 0.1432 MPa
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Shear force capacity

Vco = v c. Ash. 1×10-3


= .40711 ×290000 ×1×10-3
= 118.062 kN

Shear reinforcement Table 3.16

(v - v c). b
Asv/sv =
0.95 . f yv
(.14319 - .40711 )×1000
=
0.95 ×460
= -0.6039

Minimum links Table 3.16

0.40 . b
Asv/svn=
0.95 . f yv
0.40 ×1000
=
0.95 ×460
= 0.9153
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Column Base Design : F3
C15
Input Data

Base length A (m) 1.20


Base width B (m) 1.30
Column(s) Col 1 Col 2
C (m) 0.2
D (m) 0.4
E (m)
F (m)
Stub column height X (m) 0.65
Base depth Y (m) 0.35
Soil cover Z (m) 0.60
Concrete density (kN/m 3) 25
Soil density (kN/m 3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 60
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 60
ULS ovt. LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m²) 120
S.F. Overturning (ULS) 1
S.F. Slip (ULS) 1
fcu base (MPa) 35
fcu columns (MPa) 35
fy (MPa) 460
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Loading Data

Unfactored Loads

Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
1 1 1.6 1.6 155
Sketch of Base

BS8110 - 1997 Y

C1
X
B

D1

A
Y
Mx
P

Hx

X
Z

Y
Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Output for Load Case 1
Note: The calculated flexural reinforcement was used in the calculations.

Output for Load Case 1


Soil pressure (ULS)(kN/m²) 186.74
Soil pressure (SLS)(kN/m²) 119.19
SF overturning (SLS) >100
SF overturning (ULS) >100
Safety Factor slip (ULS) >100
Safety Factor uplift (ULS) >100
Bottom
Design moment X (kNm/m) 19.92
Reinforcement X (mm²/m) 160
Design moment Y (kNm/m) 16.14
Reinforcement Y (mm²/m) 134
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm²/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm²/m) 0
Linear Shear X (MPa) 0.105
vc (MPa) 0.404
Linear Shear Y (MPa) 0.086
vc (MPa) 0.407
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) 0.029
vc (MPa) 0.405
vcu (MPa) 4.73
v col face (MPa) 0.78
Cost 232.76

Load Case:1 Legend


Max M (+)
BS8110 - 1997 Y Y Max M (-)
Max Shear

0.20 0.20
X X
1.30

1.30

0.40 0.40

1.20 1.20
Y Y

Mx Mx
P P

Hx Hx
0.60

0.60

0.65 0.65

0.35 0.35

119.19 kN/m² 186.74 kN/m²


Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Reinforcement Calculation for X-direction:Positive Moments

Load Case 1

Design moment:19.92 kNm/m

Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
300
=
.00219
1+
.0035
= 184.534 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 184.519 mm

Depth of rectangular stress block:

a = b. x
= .9 ×150
= 135.000 mm

Concrete moment capacity: 3.4.4.4


Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
135
= 135 × 300 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 488.255 kNm

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .

1992×104
= 300 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×300 2 ×35
= 297.850 mm

Lever arm limitation 3.4.4.4

z = min(297.850 , 0.95*300.000) = 285.000 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
1992×104
=
438.1 ×285
= 159.541 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(300 - 285 )
=
.9
= 33.333 mm

Reinforcement Calculation for Y-direction:Positive Moments

Load Case 1

Design moment:16.14 kNm/m


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
290
=
.00219
1+
.0035
= 178.383 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 178.368 mm

Depth of rectangular stress block:

a = b. x
= .9 ×145
= 130.500 mm

Concrete moment capacity: 3.4.4.4

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
130.5
= 130.5 × 290 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 456.247 kNm
Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f. b . d 2 . f cu
1614×104
= 290 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×290 2 ×35
= 288.200 mm

Lever arm limitation 3.4.4.4

z = min(288.200 , 0.95*290.000) = 275.500 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
1614×104
=
438.1 ×275.5
= 133.724 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(290 - 275.5 )
=
.9
= 32.222 mm

Punching Shear Stress/Reinforcement Calculation

Load Case 1

Column number:1

The shear force outside the critical perimeter amounts to:22.37 kN

Calculation of required punching shear reinforcement:

Area used for shear


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Ash = ucrit. d
= 2600 ×295
= 767.0×103 mm²

% Rebar in X - direction tab 3.11

100 . Asx
F1x =
xb. d
100 ×173.11
=
1085 ×295
= 0.0541

% Rebar in Y - direction tab 3.11

100 . Asy
F1y =
yb. d
100 ×173.8
=
1300 ×295
= 0.0453

tab 3.11

F1x = min(0.15 , F1x ) = 0.150

tab 3.11

F1y = min(0.15 , F1y ) = 0.150

tab 3.11

400
F2 =
d
400
=
295
= 1.356

tab 3.11
Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

0.79 .
v cx = F1x0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

tab 3.11

0.79 .
v cy = F1y0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

Weighted average of vc

v cx. nx. xb + v cy. ny. yb


vc =
nx. xb + ny. yb
.36236 ×2 ×1085 + .36236 ×2 ×1300
=
2 ×1085 + 2 ×1300
= 0.3624 MPa

Actual shear stress

Veff
vv =
Ash
22375
=
767000
= 0.0292 MPa

tab 3.11

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

v c = v c_. F3
= .36236 ×1.1187
= 0.4054 MPa

Shear capacity without reinforcement

v c. Ash
Vcap =
1000
.40537 ×767000
=
1000
= 310.919 kN

The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required

Shear Stress/Reinforcement Calculation for Y-direction

Load Case 1

Design shear force:24.86 kN


Based on flexural reinforcement of:134mm²/m

Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×290 - (1000 - 0 )×0
= 290.0×103 mm²

Reinforcement ratio 3.4.5.4-6

Ast
F1 =
Ash
133.69
=
290000
= 0.0005

f 1 = f 1i. 100
= .00046 ×100
= 0.0460
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
F1 = min(3 , F1 ) = 0.046

F1 = max(0.15 , F1 ) = 0.150 3.4.5.4-6

400
f2 =
de
400
=
290
= 1.379

0.79 . 0.33333. 0.25


vc = F1 F2
1.25
0.79
= ×.15 0.33333×1.3793 0.25
1.25
= 0.3639 MPa

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

v c = v c1. F3
= .36391 ×1.1187
= 0.4071 MPa

Maximum allowable shear stress

v cu = 0.8 . f cu
= 0.8 × 35
= 4.733 MPa

vcu = min(5 , vcu ) = 4.733

Actual Shear stress:

V . 1×103
v=
Ash
24.861 ×1×103
=
290000
= 0.0857 MPa
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Shear force capacity

Vco = v c. Ash. 1×10-3


= .40711 ×290000 ×1×10-3
= 118.062 kN

Shear reinforcement Table 3.16

(v - v c). b
Asv/sv =
0.95 . f yv
(.08573 - .40711 )×1000
=
0.95 ×460
= -0.7354

Minimum links Table 3.16

0.40 . b
Asv/svn=
0.95 . f yv
0.40 ×1000
=
0.95 ×460
= 0.9153
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Column Base Design : F4
C15
Input Data

Base length A (m) 1.20


Base width B (m) 1.20
Column(s) Col 1 Col 2
C (m) 0.2
D (m) 0.4
E (m)
F (m)
Stub column height X (m) 0.65
Base depth Y (m) 0.35
Soil cover Z (m) 0.60
Concrete density (kN/m 3) 25
Soil density (kN/m 3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 60
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 60
ULS ovt. LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m²) 120
S.F. Overturning (ULS) 1
S.F. Slip (ULS) 1
fcu base (MPa) 35
fcu columns (MPa) 35
fy (MPa) 460
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Loading Data

Unfactored Loads

Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
1 1 1.6 1.6 140
Sketch of Base

BS8110 - 1997 Y

C1
X
B

D1

A
Mx Y
P

Hx

X
Z

Y
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Output for Load Case 1
Note: The calculated flexural reinforcement was used in the calculations.

Output for Load Case 1


Soil pressure (ULS)(kN/m²) 183.35
Soil pressure (SLS)(kN/m²) 117.08
SF overturning (SLS) >100
SF overturning (ULS) >100
Safety Factor slip (ULS) >100
Safety Factor uplift (ULS) >100
Bottom
Design moment X (kNm/m) 19.50
Reinforcement X (mm²/m) 156
Design moment Y (kNm/m) 12.48
Reinforcement Y (mm²/m) 103
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm²/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm²/m) 0
Linear Shear X (MPa) 0.103
vc (MPa) 0.404
Linear Shear Y (MPa) 0.058
vc (MPa) 0.407
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) 0.029
vc (MPa) 0.405
vcu (MPa) 4.73
v col face (MPa) 0.70
Cost 213.34

Load Case:1 Legend


Max M (+)
BS8110 - 1997 Y Y Max M (-)
Max Shear

0.20 0.20
X X
1.20

1.20

0.40 0.40

1.20 1.20
Y Y

Mx Mx
P P

Hx Hx
0.60

0.60

0.65 0.65

0.35 0.35

117.08 kN/m² 183.35 kN/m²


Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Reinforcement Calculation for X-direction:Positive Moments

Load Case 1

Design moment:19.50 kNm/m

Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
300
=
.00219
1+
.0035
= 184.534 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 184.519 mm

Depth of rectangular stress block:

a = b. x
= .9 ×150
= 135.000 mm

Concrete moment capacity: 3.4.4.4


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
135
= 135 × 300 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 488.255 kNm

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .

1950×104
= 300 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×300 2 ×35
= 297.896 mm

Lever arm limitation 3.4.4.4

z = min(297.896 , 0.95*300.000) = 285.000 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
1950×104
=
438.1 ×285
= 156.177 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(300 - 285 )
=
.9
= 33.333 mm

Reinforcement Calculation for Y-direction:Positive Moments

Load Case 1

Design moment:12.48 kNm/m


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
290
=
.00219
1+
.0035
= 178.383 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 178.368 mm

Depth of rectangular stress block:

a = b. x
= .9 ×145
= 130.500 mm

Concrete moment capacity: 3.4.4.4

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
130.5
= 130.5 × 290 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 456.247 kNm
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f. b . d 2 . f cu
1248×104
= 290 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×290 2 ×35
= 288.610 mm

Lever arm limitation 3.4.4.4

z = min(288.610 , 0.95*290.000) = 275.500 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
1248×104
=
438.1 ×275.5
= 103.400 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(290 - 275.5 )
=
.9
= 32.222 mm

Punching Shear Stress/Reinforcement Calculation

Load Case 1

Column number:1

The shear force outside the critical perimeter amounts to:10.11 kN

Calculation of required punching shear reinforcement:

Area used for shear


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Ash = ucrit. d
= 1200 ×295
= 354.0×103 mm²

% Rebar in X - direction tab 3.11

100 . Asx
F1x =
xb. d
100 ×178.41
=
1 142.5 ×295
= 0.0529

% Rebar in Y - direction tab 3.11

100 . Asy
F1y =
yb. d
100 ×124.06
=
1200 ×295
= 0.0350

tab 3.11

F1x = min(0.15 , F1x ) = 0.150

tab 3.11

F1y = min(0.15 , F1y ) = 0.150

tab 3.11

400
F2 =
d
400
=
295
= 1.356

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

0.79 .
v cx = F1x0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

tab 3.11

0.79 .
v cy = F1y0.33333. F20.25
1.25
0.79
= ×.15 0.33333×1.3559 0.25
1.25
= 0.3624 MPa

Weighted average of vc

v cx. nx. xb + v cy. ny. yb


vc =
nx. xb + ny. yb
.36236 ×2 ×1 142.5 + .36236 ×1 ×1200
=
2 ×1 142.5 + 1 ×1200
= 0.3624 MPa

Actual shear stress

Veff
vv =
Ash
10107
=
354000
= 0.0286 MPa

tab 3.11

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

tab 3.11
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

v c = v c_. F3
= .36236 ×1.1187
= 0.4054 MPa

Shear capacity without reinforcement

v c. Ash
Vcap =
1000
.40537 ×354000
=
1000
= 143.501 kN

The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required

Shear Stress/Reinforcement Calculation for Y-direction

Load Case 1

Design shear force:16.85 kN


Based on flexural reinforcement of:103mm²/m

Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×290 - (1000 - 0 )×0
= 290.0×103 mm²

Reinforcement ratio 3.4.5.4-6

Ast
F1 =
Ash
103.38
=
290000
= 0.0004

f 1 = f 1i. 100
= .00036 ×100
= 0.0360
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
F1 = min(3 , F1 ) = 0.036

F1 = max(0.15 , F1 ) = 0.150 3.4.5.4-6

400
f2 =
de
400
=
290
= 1.379

0.79 . 0.33333. 0.25


vc = F1 F2
1.25
0.79
= ×.15 0.33333×1.3793 0.25
1.25
= 0.3639 MPa

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

v c = v c1. F3
= .36391 ×1.1187
= 0.4071 MPa

Maximum allowable shear stress

v cu = 0.8 . f cu
= 0.8 × 35
= 4.733 MPa

vcu = min(5 , vcu ) = 4.733

Actual Shear stress:

V . 1×103
v=
Ash
16.846 ×1×103
=
290000
= 0.0581 MPa
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Shear force capacity

Vco = v c. Ash. 1×10-3


= .40711 ×290000 ×1×10-3
= 118.062 kN

Shear reinforcement Table 3.16

(v - v c). b
Asv/sv =
0.95 . f yv
(.05809 - .40711 )×1000
=
0.95 ×460
= -0.7987

Minimum links Table 3.16

0.40 . b
Asv/svn=
0.95 . f yv
0.40 ×1000
=
0.95 ×460
= 0.9153
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Column Base Design : F5
C15
Input Data

Base length A (m) 0.75


Base width B (m) 1.1
Column(s) Col 1 Col 2
C (m) 0.2
D (m) 0.4
E (m)
F (m)
Stub column height X (m) 0.65
Base depth Y (m) 0.35
Soil cover Z (m) 0.60
Concrete density (kN/m 3) 25
Soil density (kN/m 3) 18
Soil friction angle (°) 22
Base friction constant 0.5
Rebar depth top X (mm) 50
Rebar depth top Y (mm) 60
Rebar depth bottom X (mm) 50
Rebar depth bottom Y (mm) 60
ULS ovt. LF: Self weight 0.9
ULS LF: Self weight 1.4
Max. SLS bearing pr. (kN/m²) 120
S.F. Overturning (ULS) 1
S.F. Slip (ULS) 1
fcu base (MPa) 35
fcu columns (MPa) 35
fy (MPa) 460
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Loading Data

Unfactored Loads

Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
1 1 1.6 1.6 41
Sketch of Base

BS8110 - 1997 Y

C1

X
B

D1

A
Mx Y
P

Hx

X
Z

Y
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Output for Load Case 1
Note: The calculated flexural reinforcement was used in the calculations.

Output for Load Case 1


Soil pressure (ULS)(kN/m²) 107.63
Soil pressure (SLS)(kN/m²) 69.78
SF overturning (SLS) >100
SF overturning (ULS) >100
Safety Factor slip (ULS) >100
Safety Factor uplift (ULS) >100
Bottom
Design moment X (kNm/m) 3.03
Reinforcement X (mm²/m) 24
Design moment Y (kNm/m) 4.92
Reinforcement Y (mm²/m) 41
Top
Design moment X (kNm/m) 0.00
Reinforcement X (mm²/m) 0
Design moment Y (kNm/m) 0.00
Reinforcement Y (mm²/m) 0
Linear Shear X (MPa) 0.000
vc (MPa) 0.404
Linear Shear Y (MPa) 0.017
vc (MPa) 0.407
Linear Shear Other (MPa) 0.000
Punching Shear (MPa) N.A.
vc (MPa) N.A.
vcu (MPa) 4.73
v col face (MPa) 0.23
Cost 117.18

Load Case:1 Legend


Max M (+)
BS8110 - 1997Y Y Max M (-)
Max Shear

0.20 0.20
X X
1.10

1.10

0.40 0.40

0.75 0.75
Y Y

Mx Mx
P P

Hx Hx
0.60

0.60

0.65 0.65

0.35 0.35

69.78 kN/m² 107.63 kN/m²


Soil Pressures at SLS Soil Pressures at ULS
Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Reinforcement Calculation for X-direction:Positive Moments

Load Case 1

Design moment:3.03 kNm/m

Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
300
=
.00219
1+
.0035
= 184.534 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 184.519 mm

Depth of rectangular stress block:

a = b. x
= .9 ×150
= 135.000 mm

Concrete moment capacity: 3.4.4.4


Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
135
= 135 × 300 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 488.255 kNm

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f. b . d 2 . f cu
3035×103
= 300 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×300 2 ×35
= 299.674 mm

Lever arm limitation 3.4.4.4

z = min(299.675 , 0.95*300.000) = 285.000 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
3035×103
=
438.1 ×285
= 24.308 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(300 - 285 )
=
.9
= 33.333 mm

Reinforcement Calculation for Y-direction:Positive Moments

Load Case 1

Design moment:4.92 kNm/m


Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Calculation of the maximum steel strain:

f st
est =
Es
438.1
=
200000
= 0.0022

Balanced neutral axis

d
xb =
est
1+
ec
290
=
.00219
1+
.0035
= 178.383 mm

%redis
bb = 1 -
100
0
=1 -
100
= 1.0000

Maximum allowed neutral axis depth: 3.2.2.1

x = min(d/(1+ e st/ e c) , ( b b-0.4)*d) = 178.368 mm

Depth of rectangular stress block:

a = b. x
= .9 ×145
= 130.500 mm

Concrete moment capacity: 3.4.4.4

a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
130.5
= 130.5 × 290 - ×1000 ×.66667 ×.66667 ×35 ×1×10-6
2
= 456.247 kNm
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

Lever arm 3.4.4.4

M
z = d . 0.5 + 0.25 -
2 . a . f. b . d 2 . f cu
4915×103
= 290 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×290 2 ×35
= 289.454 mm

Lever arm limitation 3.4.4.4

z = min(289.454 , 0.95*290.000) = 275.500 mm

Tension steel 3.4.4.4

M
Ast =
f st. z
4915×103
=
438.1 ×275.5
= 40.722 mm²

Neutral axis depth 3.4.4.4

2 . (d - z )
Neutralaxis
=
b
2 ×(290 - 275.5 )
=
.9
= 32.222 mm

Punching Shear Stress/Reinforcement Calculation

Load Case 1

Column number:1

Shear Stress/Reinforcement Calculation for Y-direction

Load Case 1

Design shear force:4.86 kN


Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019
Based on flexural reinforcement of:41mm²/m

Shear Calculations:
Area used for shear calculations:

Ash = bw. de - (bw - bf ). bf


= 1000 ×290 - (1000 - 0 )×0
= 290.0×103 mm²

Reinforcement ratio 3.4.5.4-6

Ast
F1 =
Ash
40.723
=
290000
= 0.0001

f 1 = f 1i. 100
= .00014 ×100
= 0.0140

F1 = min(3 , F1 ) = 0.014

F1 = max(0.15 , F1 ) = 0.150 3.4.5.4-6

400
f2 =
de
400
=
290
= 1.379

0.79 . 0.33333. 0.25


vc = F1 F2
1.25
0.79
= ×.15 0.33333×1.3793 0.25
1.25
= 0.3639 MPa
Job Number Sheet
Job Title
GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

f cu 0.33333
F3 =
25
35 0.33333
=
25
= 1.119

v c = v c1. F3
= .36391 ×1.1187
= 0.4071 MPa

Maximum allowable shear stress

v cu = 0.8 . f cu
= 0.8 × 35
= 4.733 MPa

vcu = min(5 , vcu ) = 4.733

Actual Shear stress:

V . 1×103
v=
Ash
4.8554 ×1×103
=
290000
= 0.0167 MPa

Shear force capacity

Vco = v c. Ash. 1×10-3


= .40711 ×290000 ×1×10-3
= 118.062 kN

Shear reinforcement Table 3.16

(v - v c). b
Asv/sv =
0.95 . f yv
(.01674 - .40711 )×1000
=
0.95 ×460
= -0.8933

Minimum links Table 3.16


Job Number Sheet
Job Title GR FLOOR SERV BLOCK-FOUNDATION DESIGN
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com ABBAS AL BALOSHI
E-Mail : [email protected] Calcs by Checked by Date
2/26/2019

0.40 . b
Asv/svn=
0.95 . f yv
0.40 ×1000
=
0.95 ×460
= 0.9153

You might also like