②no residual deformation is visible after completion of hydraulic test.
10Unit/batch inspection 10.1Unit/batch inspection for issuing marine products certificatesis to be carried out after CCS works approval. 10.2Unit/batch inspection is to include the following items: (1) The inspections are to be carried out according to approved inspection plan, including at least visual examination of welds, non-destructive testing of welds, coil inspection, inspection of expansiontank/collecting tank and hydraulic test.B-02(201510) THERMAL OIL HEATERS 8/8
(2) The manufacturer is to submit to CCS the documentation as specified in 5.1 and 5.2 of this Guideline.