PRE-FINAL JURY

DHRUVIN KATARIA
ROLL NO-29
T4
Concept – Social Cohesion/ Co-housing
List by Kamal Meattle (Indian environmental activist)
AREA STATEMENT
STUDIO TECHNOLOGY: SEMESTER 4 (STUDIO UTILITY)

DESIGN PROGRAMME:

TOTAL PLOT AREA: 10000


MAX PERMISSIBLE FSI @1.8 18000

CONSTRUCTION AREA STATEMENT

NO SPACE UNIT AREA (SQM) QUANTITY (SQM) TOTAL FSI


13 BHK 156 20 3000 3000
22 BHK 95 40 3680 3680
31 BHK - TYPE 01 66 80 5280 5280
41 BHK - TYPE 02 51 20 1020 1020
5DORMITORIES 63 10 630 630
6AMENITIES 800 1 800 800
7PARKING 3570 1 3570 0
8TOTAL 1 TO 7 4792 1 4792 14410
9CIRCULATION + UTILITY 958.4 1 958.4 0
STRUCTURES (20%)
10WALL AREA (10%) 479.2 1 479.2 479.2
11TOTAL CONSTRUCTION AREA 19417.6 14889.2
SITE LAYOUT 2BHK JOGGING TRACK
3BHK

DORMITORY
AMENITIES

1BHK - B

TEMPLE

1BHK - A
DEVELOPMENT
3BHK UNIT PLAN
3BHK CLUSTER PLAN
3BHK 3D VIEW
3BHK ELEVATION

3BHK SECTION
2BHK UNIT PLAN
2BHK CLUSTER PLAN
2BHK 3D VIEW
2BHK ELEVATION

2BHK SECTION
2 & 3BHK 3D CLUSTER VIEW
2 & 3BHK 3D CLUSTER VIEW
1BHK-A UNIT PLAN
1BHK TYPE A CLUSTER PLAN
1BHK 3D VIEW
1BHK-A ELEVATION 1BHK-A SECTION AA’
1BHK-B UNIT PLAN
1BHK-A 3D VIEW
1BHK-B ELEVATION 1BHK-B SECTION AA’
DORMITORY UNIT PLAN
DORMITORY 3D VIEW
DORMITORY ELEVATION DORMITORY SECTION AA’
Amenities
Staircase Plantation
Kitchen Design
Bathroom Design
FACADE DESIGN
DUCT COVERING
FACADE DESIGN
SHADING – BOX WINDOW
STRUCTURE
• 3BHK AND 2BHK UNITS – STEEL STRUCTURE
• VIERENDEEL TRUSS SYSTEM – NEED TO ONLY
PROVIDE SUPPORT AT 1ST , 3RD , 5TH, 7TH FLOOR
• FOUNDATION – PILE FOUNDATION

• OTHER UNITS– RCC FRAME STRUCTURE


• FOUNDATION – RAFT/STEP FOUNDATION

2 BHK STEEL FRAME


PARKING
HVAC
PLUMBING WATER SUPPLY
WATER TANK CAPACITY
NO SPACE PER FLAT( PER PERSON = 135L) QUANTITY REQUIRED LITRE PROVIDED LITRE
1 3 BHK 675 10 6750 13500
2 2 BHK 675 14 9450 18900
3 1 BHK - TYPE 01 675 28 18900 37800
4 1 BHK - TYPE 02 675 20 13500 27000
5 DORMITORIES 1080 10 10800 21600
DRAINAGE – UNIT LEVEL SYSTEM – ONE PIPE SYSTEM

COMPONENTS –
1. DRAINAGE PIPE – 9”
2. INLET PIPE – 2”
3. OUTLET PIPE – 2”
4. STORMWATER PIPE – 4.5”
5. VENT PIPE – 6”
DRAINAGE – SITE LEVEL
ELECTRIC LAYOUT – UNIT LEVEL
ELECTRIC LAYOUT – SITE LEVEL
ENTRANCE GATE DESIGN
SITE LAYOUT B’

A
A’

B
SITE SECTION AA’
SITE SECTION BB’
SITE ELEVATION

SOUTH ELEVATION
SITE ELEVATION

WEST ELEVATION
SITE 3D VIEW
SITE 3D VIEW
SITE 3D VIEW
SITE 3D VIEW
SITE 3D VIEW
THANK YOU