Perspective: Table of Contents
Perspective: Table of Contents
Perspective: Table of Contents
TABLE OF CONTENTS
GENERAL ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL
G-1 BILL OF QUANTITIES S-1 GENERAL NOTES
A-9 SCHEDULE OF DOORS & WINDOWS, DETAIL PLAN, P-1 GROUND FLOOR, TYPICAL SECOND EE - 1 GENERAL NOTES,LEGEND, FLUORESCENT LIGHT
G-2 BILL OF QUANTITIES ELEVATION & SECTION OF RAMP, SPOT DETAILS S-2 GENERAL NOTES THIRD & FOURTH FLOOR PLUMBING LAYOUT FIXTURE MOUNTING DETAIL, LOAD SCHEDULE,
G-3 BILL OF QUANTITIES PANEL BOARD DIAGRAM AND ELECTRICAL RISER
G-4 BILL OF QUANTITIES A - 10 SECTION DETAIL OF EAVES, SPOT DETAIL CORNER S-3 FOUNDATION PLAN, TYPICAL SECOND FLOOR TO FOURTH P-2 ISOMETRIC SEWER LINE LAYOUT DIAGRAM ( 12-CL )
CEILING, CONCRETE SUNBREAKER DETAIL, FLOOR FRAMING PLAN
G-5 BILL OF QUANTITIES
PERSPECTIVE, SECTION & SPOT DETAIL OF CEILING, S-4 COLUMN SCHEDULE, SCHEDULE OF FOOTING, P-3 GROUND FLOOR, TYPICAL SECOND, THIRD EE - 2 POWER LAYOUT ( 12-CL )
G-6 BILL OF QUANTITIES
PLAN & SECTION OF VENTILATION SCHEDULE FOOTING BEAMS, TYPICAL FOOTING DETAIL, & FOURTH FLOOR WATER LINE LAYOUT
ELEVATION OF COLUMN & DETAIL OF WALL FOOTINGS EE - 3 LIGHTING LAYOUT ( 12-CL )
ARCHITECTURAL A - 11 STAIR DETAILS P-4 ISOMETRIC WATER LINE LAYOUT
S-5 PLAN FOOTING F-3, ELEVATION FOOTING F-3, EE - 1 LOAD SCHEDULE, FLUORESCENT LIGHT FIXTURE
A-1 PERSPECTIVE, TABLE OF CONTENTS PLAN FOOTING CF-1 & TYPICAL ELEVATION OF MICRO-PILE
A - 12 DETAIL BAY SECTION (ALONG TOILET) P-5 ISOMETRIC DRAINAGE LINE LAYOUT MOUNTING DETAIL, ELECTRICAL RISER DIAGRAM,
DETAIL BAY SECTION (ALONG CORRIDOR) PANEL BOARD DIAGRAM, GENERAL NOTES AND
A-2 KEY PLAN S-6 SCHEDULE MAIN BEAMS, SCHEDULE OF SECONDARY
DETAIL PLAN OF FEMALE & MALE TOILET BEAMS, SCHEDULE OF SLABS, TYPICAL SLAB P-6 ROOF DRAIN LAYOUT, LEGEND ( 16-CL )
ELEVATION, TYPICAL BEAM ELEVATION & TYPE OF STIRRUPS SECTION OF DRAIN PIPE AND SPOT DETAIL
A-3 GROUND FLOOR PLAN, SECOND FLOOR & THIRD FLOOR PLAN,
A - 13 DETAIL SECTION OF FEMALE & MALE TOILET, EE - 2 POWER LAYOUT ( 16-CL )
SCHEDULE OF FLOOR FINISH S-7 DETAIL OF STAIR, RAMP DETAIL, DETAIL OF DC-1,
DETAIL OF COUNTER SINK P-7 PLAN OF SEPTIC TANK, LONGITUDINAL
DETAIL OF STAIR ON GRADE & DETAIL OF WALL ON FTB EE - 3 LIGHTING LAYOUT ( 16-CL )
SECTION, CROSS SECTION, COVER DETAIL,
A-4 FOURTH FLOOR PLAN & FRONT ELEVATION
A - 14 DETAILS OF BLACKBOARD S-8 ROOF FRAMING PLAN CATCH BASIN DETAIL, PLUMBING NOTES
AND LEGEND EE - 1 LOAD SCHEDULE, FLUORESCENT LIGHT FIXTURE
A-5 REAR ELEVATION, LEFT & RIGHT ELEVATIONS, CROSS SECTION
S-9 ELEVATION OF END WALL FRAME, DETAIL SECTION OF PC-1, MOUNTING DETAIL, ELECTRICAL RISER DIAGRAM,
CONNECTION OF PURLINS TO RG-4, PANEL BOARD DIAGRAM, GENERAL NOTES AND
A-6 LONGITUDINAL SECTION & GROUND FLOOR REFLECTED CONCRETE SUN BREAKER DETAIL LEGEND ( 20-CL )
CEILING PLAN
S - 10 TRUSS DETAILS & CONNECTION DETAILS
EE - 2 POWER LAYOUT ( 20-CL )
A-7 TYPICAL SECOND FLOOR & THIRD FLOOR REFLECTED CEILING
PLAN, FOURTH FLOOR REFLECTED CEILING PLAN S - 11 BASE PLATE DETAILS, ANCHOR BOLT DETAIL,
ROOF PANEL SIDE LAP DETAIL, J-BOLT TO PURLIN EE - 3 LIGHTING LAYOUT ( 20-CL )
CONNECTION DETAIL, J-BOLT SPACING, PURLIN
A-8 ROOF PLAN, SPOT DETAIL PLAN AND SECTION OF 1 & 2, CONNECTION DETAIL, SECTION, TRUSS DETAIL AT
DOOR FRAME TYPICAL PLAN & SECTION DETAIL, GUTTER END
GLASS JALOUSIE TYPICAL DETAIL PLANS, GLASS JALOUSIE
TYPICAL DETAIL SECTIONS
VARIOUS DPWH
(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS BOD
PERSPECTIVE, 7
NOTE : STANDARD FOUR-STOREY TABLE OF CONTENTS A-1
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 47
SCHOOL BUILDING
OIC, BUILDINGS DIVISION DIRECTOR IV, BOD UNDERSECRETARY SECRETARY
( 20-CLASSROOMS )