SHE INSPECTION REPORT

Date 8.3.2019 WPC V201 SunCon


Time 0800 hrs Area DD24 - DD30
Item No Details of Good Observation

1&2

Location DD26 Location TPSS 4

Details Edge protection installed Details Both workers have attended


Observation for slope area Observation KVMRT SHE Passport Blue
Card & Grey Card

1
Item No Details of Observation and Nonconformities (if any)

1.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Housekeeping is required Agreed Closed
15.3.2019
Finding on regular basis. Unused Date
material to be removed Status Open/Closed/Ongoing
Details of
Refer to GS G9.17.10 Action Taken
Housekeeping

2.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Edge protection to be re Agreed Closed
15.3.2019
Finding installed properly. Any Date
material to be placed Status Open/Closed/Ongoing
securely on top Details of
Action Taken
Refer to GS G9.17.28
Working at Height

2
Item No Details of Observation and Nonconformities (if any)

3.

BEFORE: 8.3. 2019 AFTER:


Location DD28 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Fire extinguisher to be Agreed Closed
15.3.2019
Finding recharged Date
Status Open/Closed/Ongoing
Refer to GS G9.17.7 Details of
Fire Prevention Action Taken

4.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Evidence workers resting Agreed Closed
15.3.2019
Finding not on proper designated Date
rest area Status Open/Closed/Ongoing
Details of
Refer to GS G9.17.39 Action Taken
Welfare Facilities

3
Item No Details of Observation and Nonconformities (if any)

5.

BEFORE: 8.3. 2019 AFTER:


Location DDS28 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Improper layout of the Agreed Closed
15.3.2019
Finding weatherproof non Date
domestic cable that is Status Open/Closed/Ongoing
exposed to friction from Details of
the hoarding sharp ends Action Taken

Refer to GS G9.17.6
Electricity Temporary
Electrical Supply
6.

AFTER:
BEFORE: 8.3. 2019
Location DD24 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Dirty road need to be Agreed Closed
15.3.2019
Finding clean near site access Date
Status Open/Closed/Ongoing
Refer to GS G2.4 Site Details of
Cleanliness Action Taken

4
Item No Details of Observation and Nonconformities (if any)

7.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Protruding rebar to be Agreed Closed
15.3.2019
Finding bent/ protected Date
Status Open/Closed/Ongoing
Refer to GS G9.17.17 Details of
Construction Plant & Action Taken
Equipment

5
Item No Details of Observation and Nonconformities (if any)

8.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Proper signage should Agreed Closed
15.3.2019
Finding be displayed to alert Date
workers on the Status Open/Closed/Ongoing
requirement to wear Details of
harness when going up Action Taken
as the area have not yet
declared as Harness
Free Zone (HFZ)

Refer to:
- GS G9.17.18 Working
at Height
- GS G17.9 Signage

6
Item No Details of Observation and Nonconformities (if any)

9.

BEFORE: 8.3. 2019 AFTER:


Location DD27 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Parapet wall to be stored Agreed Closed
15.3.2019
Finding & secured properly Date
Status Open/Closed/Ongoing
Refer to: Details of
-GS G9.17.19 Parapet Action Taken
Walls and Noise Barrier
Installation
-Method Statement:
SSP-PDP2-PKG1-
OVPR-MST-00107

7
Item No Details of Observation and Nonconformities (if any)

10.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Improper usage of Agreed Closed
15.3.2019
Finding scaffold platform to cross Date
to the other side Status Open/Closed/Ongoing
Details of
Refer to GS G9.17.25 Action Taken
Scaffolding

8
Item No Details of Observation and Nonconformities (if any)

11.

AFTER:
BEFORE: 8.3. 2019
Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Opening to be closed/ Agreed Closed
15.3.2019
Finding barricaded. Scaffold Date
spotted with no Status Open/Closed/Ongoing
inspection tag/ signage Details of
Action Taken
Refer to:
- GS G9.17.28 Working
at Height
-GS G9.17.25
Scaffolding

9
Item No Details of Observation and Nonconformities (if any)

12.

BEFORE: 8.3. 2019 AFTER:


Location DD30 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details No guardrail as edge Agreed Closed
15.3.2019
Finding protection along the Date
slope Status Open/Closed/Ongoing
Details of
Refer to GS G9.17.12 Action Taken
Excavation

13.

BEFORE: 8.3. 2019 AFTER:


Location DD26 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Houskeeping is required Agreed Closed
15.3.2019
Finding on regular basis Date
Status Open/Closed/Ongoing
Refer to GS G9.17.10 Details of
Housekeeping Action Taken

10
Item No Details of Observation and Nonconformities (if any)

14.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details To re inspect modular Agreed Closed
15.3.2019
Finding access on weekly basis/ Date
after bad weather by TWI Status Open/Closed/Ongoing
Details of
Refer to: Action Taken
- GS G9.17.27
Temporary Works
-GS G4.8 Temporary
Works

11
Item No Details of Observation and Nonconformities (if any)

15.

BEFORE: 8.3. 2019 AFTER:


Location DD28 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Damaged lifting Agreed Closed
15.3.2019
Finding appliances spotted for Date
lorry crane WRC 7625 Status Open/Closed/Ongoing
Details of
Refer to GS G9.17.3 Action Taken
Cranes, Lifting &
Hoisting Machinery &
Lifting Gear

12
Item No Details of Observation and Nonconformities (if any)

16.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Going up to the top with Agreed Closed
15.3.2019
Finding no lanyard. Last Date
inspection was on Sept Status Open/Closed/Ongoing
2018. The lanyard is hold Details of
separately from the Action Taken
harness while the
workers going up

Refer to GS G9.17.28
Working at Height

13
Item No Details of Observation and Nonconformities (if any)

17.

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Protruding nail spotted Agreed Closed
15.3.2019
Finding on the left plywood Date
exposing workers to Status Open/Closed/Ongoing
potential protruding Details of
hazard Action Taken

Refer to GS G9.17.17
Construction Plant &
Equipment

14
Item No Details of Observation and Nonconformities (if any)

18..

BEFORE: 8.3. 2019 AFTER:


Location TPSS4 Category Observation/NCR/SWO
NCR/SWO/
Safetrac Ref
No (if any)
Details Damaged 16A industrial Agreed Closed
15.3.2019
Finding plug wrapped in plastic Date
being used Status Open/Closed/Ongoing

Refer to GS G9.17.6
Details of
Electricity Temporary
Action Taken
Electrical Supply
Inspected by 1. Azmi Bin Rani Report Date 8.3.2019
(PDP SHM)
2. Nur Farahin Ab Manan
(PDP SHO)
3. Peter Anand A/L
Tamal Salavan
(PDP SHO)

Signature

Distributed by email ( EDMS Aconex) within 24hours of the inspection to


PDP HOD SHE, PDP S&H/E Manager, PDP S&H/E Officer , PDPR, PDP CD, PDP PM,PDP CM, SC
SRE, SC CRE, WPC PD, WPC PM, WPC S&H/E Manager