A B 2" x 4" C-PURLINS


SPACED @ 0.70m. O.C.
C D DPWH
14000 OFFICE OF THE BUILDING OFFICIALS
2 - L 112" x 112" x 14" ANGLE BARS
1000 4000 4000 4000 1000 (TOP & BOTTOM CHORD) MUNICIPALITY OF TABUELAN

2 - L 112" x 112" x 14" ANGLE BARS RECOMMENDING APPROVAL:

1000
(WEB MEMBERS)
0
600

2000
MIDSPAN REINFORCEMENT
CONTINUOUS / DISCONTINUOUS (BOTTOM LAYER)
REINFORCEMENT (BOTTOM LAYER) HEAD, STRUCTURAL SECTION DATE

3000
APPROVED:

593 1000 1000 1000 1000 1000 1000 1000 1000 593
989

S/4
BUILDING OFFICIAL DATE
9186

2 FT1
FT1 FT2 FT2 FT1

11000
3000
2 - L 112" x 112" x 14" ANGLE BARS
2 - L 112" x 112" x 1 4" ANGLE BARS
(TOP & BOTTOM CHORD)
(TOP & BOTTOM CHORD)

SHORT SPAN (S)


3 600
0
2 - L 112" x 112" x 14" ANGLE BARS
(WEB MEMBERS)
2 - L 112" x 112" x 1 4" ANGLE BARS
(WEB MEMBERS)

2000
463
0

1455
3000
HT HT 593 1000 1000 1000 1000 1000 1000 1000 1000 422 1000 1000 1339
989

4
989
9015 3339
S/4

1000
FT2 HT
2000
TRUSSES DETAIL
L/4 L/4
5 SCALE 1:50 METERS
LONG SPAN (L)

3000 6000 3000


TYPICAL SLAB DETAIL
SCALE 1:30 METERS ROOF FRAMING PLAN
SCALE 1:80 METERS

L/4
CONTINUOUS / DISCONTINUOUS
REINFORCEMENT (BOTTOM LAYER) X
16 2ND FLOOR LINE
16 2ND FLOOR LINE
THICKNESS
15 15
MIDSPAN REINFORCEMENT BEAM BEAM
25mm COVER (BOTTOM LAYER) 14 14

13 250 13

250 12mm FRAMING BARS


12 12
SLAB SCHEDULE 250
11 11
BEAM NO. QUANTITY SHORT (m) LONG (m) THICK (mm) SHORT DIRECTION BAR SPACING
MIDSPAN CONT./DISCONT.EDGES
LONG DIRECTION BAR SPACING
MIDSPAN CONT./DISCONT.EDGES 7 8 9 10 11 12 13 14 15 16 25mm NOSING 12mm MAIN BARS @ 200mm O.C.

S1 6 3.00 4.00 100 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm 10 10

S2 2 2.00 3.00 100 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm
6 9 9 12mm TEMPERATURE BARS @ 300mm O.C.

S3 2 1.50 4.00 100 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm
5 8 8

3000
S4 1 2.00 4.00 100 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm 12mm @ 200mm 10mm TEMPERATURE BARS
7 7
4
250 6
6
3 250 5
20mm SPACING

2 Y'

188
12mm FRAMING BARS 250 4
4
25mm NOSING

1313

1313

188
250 3
1 12mm MAIN BARS @ 200mm O.C.
3

188

188
2 2
Y 10mm TEMPERATURE BARS

188

188
12mm TEMPERATURE BARS @ 300mm O.C. 1 1

188
FINISHED FLOOR LINE FINISHED FLOOR LINE

X'

500
12mm horizontal bars @ 200mm O.C.
SECTION THRU Y-Y'
PLAN 12mm main bars @ 200mm B.W.

STAIRS DETAIL

200
SECTION THRU X-X'
SCALE 1:25 METERS
600

IT SHALL BE UNLAWFUL OF
FROM THE OFFICE OF: REG. NO. : 0041927 SEAL: ANY PERSON, W/O WRITTEN PROJECT TITLE: APPROVED BY: SHEET CONTENT: REVISION : SHEET NO.:
CONSENT OF THE ARCHITECT
OR AUTHOR OF THE SAID
DATE : 08-14-85 AS SHOWN DATE :
PTR NO. : 0187595
DOCUMENTS TO DUPLICATE
OR TO MAKE COPIES FOR USE
IN THE REPETITION OF AND
OR OTHER PROJECT OR
A PROPOSED 2- STOREY RESIDENCE MARIA FLOR ROBSON REF. DWG. : 5
7
BUILDING, WEATHER
LICENSED CIVIL ENGINEER DATE : 01-03-11 EXECUTED PARTLY OR IN A
OWNER CADD BY : R.P.
WHOLE.
TIN :123-770-138 REPUBLIC ACT 545
LOCATION: TAPON, TABUNOK, TABUELAN, CEBU ADDRESS: TAPON, TABUNOK, TABUELAN, CEBU CHECKED BY: