Faculty of Civil and Environmental Engineering BPK 30902 Engineering Economy Assessment: Exercise No.2 Topic: Chapter 3 Student's Name

This document contains an engineering economics exam with 3 questions. Question 1 involves calculating a weighted price index for rubber in 2014 from past price data and using the index to calculate 2015 prices. Question 2 involves calculating the engineering hours needed to design transmission line towers using a 95% learning curve. Question 3 involves calculating the total costs of 240KW and 300KW generator units based on a past 100KW unit cost and other given factors.

Uploaded by

Logarithem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
116 views2 pages

Faculty of Civil and Environmental Engineering BPK 30902 Engineering Economy Assessment: Exercise No.2 Topic: Chapter 3 Student's Name

This document contains an engineering economics exam with 3 questions. Question 1 involves calculating a weighted price index for rubber in 2014 from past price data and using the index to calculate 2015 prices. Question 2 involves calculating the engineering hours needed to design transmission line towers using a 95% learning curve. Question 3 involves calculating the total costs of 240KW and 300KW generator units based on a past 100KW unit cost and other given factors.

Uploaded by

Logarithem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Faculty of Civil and Environmental Engineering Page 1 From 2

BPK 30902 ENGINEERING ECONOMY Number:


Assessment: Exercise No.2 Edition: 1
Topic: Chapter 3 Date: 27 Mac 2019
Student’s Name : Section :

FINAL EXAMINATION SEMESTER I SESSION 2014/2015

Q1 The table below shows the past price of Standard Malaysia Rubber (SMR) since
2012, whereby 2013 is the reference year having 246 as an index value. The
weight place on SMR CV is one (1) time, SMR L is one and half (1.5) times and
SMR 5 is two (2) time.

(i) Calculate a weighted index for the price of a kg of SMR in 2014.


(4 marks)

(ii) Calculate the corresponding 2015 prices of SMR from 2014 if 218 is the
index value in 2015.
(6 marks)
Price (sen / kg ) in Year
SMR
2012 2013 2014

SMR CV 1088 919 753

SMR L 1046 832 696

SMR 5 974 794 579

Q2 The structural engineering design section of Agile E-Power, a multinational


electrical utility corporation has developed several standard designs for a group
of similar transmission line towers. The detailed design for each tower is based
on one of the standard designs. A transmission line project involving 60 towers
has been approved. The estimated number of engineering hours needed to
accomplish the first detailed tower design is 123.

Determine:

(i) The number of engineering hours needed to design the eight and
sixteenth tower using a 95% learning curve.
(5 marks)

(ii) The reduction percentage when the production is doubled.


(5 marks)

(iii) The estimated cumulative average hours required to produce the first
five tower designs.
(5 marks)

FINAL EXAMINATION SEMESTER I SESSION 2013/2014

Q3 Cost for a generator set of 100-KW was RM35,000 ten years ago while the
cost index for this generator was 187 and is now 194 with the cost capacity
factor 0.75. The EE team is considering a 240-KW and 300-KW units of the
same general design to power a small-medium isolated plant. Both models
require an additional pre-compressor, which currently costs RM22,000.
(i) Calculate the total cost of the 240-KW unit.
(9 marks)

(ii) Compute the total cost of a 300-KW unit.


(6 marks)