1 154 Days Fri 3/1/19
1 154 Days Fri 3/1/19
S.N. Work Description Duration Start Qtr 1, 2019 Qtr 2, 2019 Qtr 3, 2019 Qtr 4, 2019 Qtr 1, 2020 Qtr 2, 2020 Qtr 3, 2020 Qtr 4, 2020 Qtr 1, 2021
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
1 1 Research Start up 154 days Fri 3/1/19 Research Start up
2 1.1 Proposal writing and 23 days Fri 3/1/19 Proposal writing and Defence
Defence
3 1.2 Course Work 132 days Mon 4/1/19 Course Work
6 1.2.3 Guided Course: Modeling 43 days Thu 8/1/19 Guided Course: Modeling
7 2 Experiment of existing pump 176 days Mon 4/1/19 Experiment of existing pump
9 2.2 Status of Pumps used in 45 days Mon 4/1/19 Status of Pumps used in Nepal and their problems
Nepal and their problems
10 2.3 Identification of pump for 22 days Sun 6/2/19 Identification of pump for turbine mode
turbine mode
11 2.4 Numerical and Experimental 89 days Mon 7/1/19 Numerical and Experimental Testing of pump
Testing of pump
12 2.5 Paper Writing 1 22 days Fri 11/1/19 Paper Writing 1
13 3 Design Modification and 175 days Sun 12/1/19 Design Modification and Manufacturing
Manufacturing
14 3.1 Design modification of 67 days Sun 12/1/19 Design modification of existing impeller
existing impeller
15 3.2 Numerical analysis 44 days Mon 3/2/20 Numerical analysis
16 3.3 Local manufacturing and 66 days Fri 5/1/20 Local manufacturing and procedure development
procedure development
17 4 Experimental Testing and 150 days Sat 8/1/20 Experimental Testing and performance evaluation
performance evaluation
18 4.1 Intstrumentation work 67 days Sat 8/1/20 Intstrumentation work
19 4.2 Experimental Testing and 67 days Sun 11/1/20 Experimental Testing and measuremnts, results
measuremnts, results
20 4.3 Write Paper 2 42 days Fri 1/1/21 Write Paper 2
22 5 Future recommendation and 22 days Fri 3/1/19 Future recommendation and Final Defence
Final Defence
23 5.1 Future recommendation and 22 days Fri 3/1/19 Future recommendation and preparation for defence
preparation for defence
Task Summary External Milestone Inactive Summary Manual Summary Rollup Finish-only
Project: Masters
Split Project Summary Inactive Task Manual Task Manual Summary Deadline
Date: Sat 3/23/1
Milestone External Tasks Inactive Milestone Duration-only Start-only Progress