Engineering Project: TK-4094 Prarancangan Pabrik Kimia Semester 2 - 2015/2016
Engineering Project: TK-4094 Prarancangan Pabrik Kimia Semester 2 - 2015/2016
1 Technology/Process Screening.
2 Conceptual Study.
4 Basic Engineering.
6 Detail Engineering.
Apa perbedaannya? (1)
Technology/Proce Process Front End Detailed
Deliverable!!
ss Screening Conceptual Study Engineering Study Basic Engineering Engineering Engineering
Manhour Manhour Manhour Manhour Manhour Manhour
1 Project Engineering
1.1 Basic of Contract/Scope of Work x x x x x x
1.2 Project Execution Strategy x x x
dilakukan!
1.10 Life Cycle Costing *6 x x x
1.11 Value Engineering activities *6 x x x
2 Process Engineering
2.1 Process Design basis x x x x x x
2.2 Process Selection and Option Evaluation x x x x x x
2.3 Process Description x x x x x
2.4 Block Flow Diagram x x x x x
2.5 Process Flow Diagram x x x x
2.6 Overall Plant Material Balance x x x x x
2.7 Process Simulation Outputs x x x x
2.8 Heat and Material Balance by Stream x x x x
2.9 P&I Diagrams *2 x x x x
2.10 Product Specification x x x x x
2.11 Utility Consumption x x x x x
2.12 Major Equipment Schedule x x x x x
2.13 Equipment Process Datasheets x x x x
2.14 Linesizing Calculation x x x
2.15 Process Control Philosophy x x x
2.16 Flow Instrument Process Data x
2.17 Control Valve Process Data x x
2.18 Relief Valve Process Data x x
2.19 Preparation of Enquiry Packages x
2.20 Technical Bid Evaluations x
2.21 Preparation of Consumables Requisitions x
2.22 Plant Operating Instructions x x
2.23 Review of Vendor Documentation x
Apa perbedaannya? (2)
• Turbo Expander
• Gas Turbine
• Gas Engine
• FEED
• EPC Tender
• Penunjukan Pemenang
• Contract Formation
• Contract Signing
• KOM