Wo Ogdc

Work Order 19-2427 details a planned maintenance task to makeup coolant in asset A-1309-1310 located in the QP-AREA-13 Front End Compression area. The work is scheduled to take place between 14:55 and 22:00 on March 26, 2019. No tools, equipment, tasks, or trades are listed, and the estimated total cost is $0, though the actual total cost is listed as $50,000. The work order was generated by NOOR NABI BHUTTO and is classified as routine planned maintenance for a combustion engine.

Uploaded by

Intelshk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

Wo Ogdc

Work Order 19-2427 details a planned maintenance task to makeup coolant in asset A-1309-1310 located in the QP-AREA-13 Front End Compression area. The work is scheduled to take place between 14:55 and 22:00 on March 26, 2019. No tools, equipment, tasks, or trades are listed, and the estimated total cost is $0, though the actual total cost is listed as $50,000. The work order was generated by NOOR NABI BHUTTO and is classified as routine planned maintenance for a combustion engine.

Uploaded by

Intelshk
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Order 19-2427

Work Order Details


Section: Mechanical

Asset: A-1309 PTW: 74032

Location: QP-AREA-13 Front End Compression Raise Date: 26 Mar 2019 14:52

Work Order Description Status APPR


To makeup cooliant in A-1309-1310 Classification: CEGE - Combustion engines (piston) - Otto (gas) engine

Safety Plan Requested By: NOOR NABI BHUTTO


Work Type: MA

Multi Asset Work Pemit: COLD

Priority:
Equipment
Release:

Instructions Start Finish


Target 26 Mar 2019 14:55 26 Mar 2019 22:00
Actual

Work Planning

Tool/Equipment
Description Quantity Line Cost

Tasks
Tasks Description Observation

Trades Planned
Team Labor Quantity Regular Hours

Trades Actual
Team Labor Regular Hours

Spares
Item Description Quantity Unit Cost Line Cost

Estimated Total Cost: 0 Actual Total Cost: 50000

Failure Reporting
Failure Class Failure Code
Problem NA Not Applicable
Cause
Remedy

Supervisor I/C Mechanical Plant Manager

This is Maximo Generated report Printed on: 26 Mar 2019 19:49