Structural Design of SHORING SYSTEM

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

S & H Engineering

Project : THE CONSTELLATION (PAVILION AND SANCTUARY)


Location : ABU DHABI- UAE.
Owner : ROYAL ARCHITECT PROJECT MANAGER
Consultant : AURECON AUSTRALIA PTY LTD.
Main Contractor : AL FARA’A GENERAL CONTRACTING.
Shoring Contractor : S & H ENGINEERING L.L.C.

KING POST SHORING SYSTEM


SOIL PROPERTY

N =27
=36
E
=0.25

N =45
=40
E
=0.22

C
E
=0.20

KING POST =305X305X97


SPACING =1.30m
LAND KEY :
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
0m
1.3
1.3 0m
0m 1.3
1.3 0m
0m 1.3
0m
1.3 1.3 0m
0m 0m 40.3
1.3 1.3
0m 0m
1.3 1.3
0m 0m 0m
1.3 1.3 1.3
0m 0m 0m
1.3 1.3 1.3
0m 0m 0m
1.3 1.3
1.3 m
0m 0m 1.30
1.3 1.3 0m
0m 0m 1.3
1.3 0m
1.3 0m 1.3
0m 0m

3
1.3 1.3 1.3
0 0m 0m
m 1.3 1.3 GENERAL NOTES :
1.3 0m 0m

E
0m 1.3 1.3
1.3 1.3 0m 0m
0m 0m 1.3 1.3
0m

AG
1.3 1.3 m 1.3
0m 0m 1 .30 0m
1.3 1.3 0m 1.3
0m 0m 1.3 0m

ST
1.3 37 1.3 0m 1.3
.7m 1.3 0m

ST
0m 0m 1.3
1.3 1.3 0m 0m
0m 0m 1.3 1.3
m m
1.3 1.3 1.30 1.30
0m 0m 0m

AG
1.3 1.3 0m 1.3
0m 0m 1.3 0m
0m 1.3
1.3
0m
1.3 1.3 0m
0m m 1.3
1.3 1.3 1.30 0m
0m 0m 0m 1.3
1.3 0m 0m

E
1.3 1.3 1.3
0m 0m 0m 0m 50.7
1.3 1.3 1.3 1.3
0m 0m 0m 0m
1.3 1.3 1.3 0m 1.3

1
0m 0m 0m 16.9 0m
1.3 1.3

A
1.3 1.3 0m
0m 0m 0m 1.3
1.3 1.3 1.3 0m
0m 0m 0m 1.3
1.3 1.3 1.3 .30
m
0m 0 0m 1
m 1.3 0m
37 1.3
.7m 1.30 1.3
0m 0m 0m
m 1.3 1.3
1.3 1.3 0m 0m
0m 0m 1.3 1.3
1.3 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 0m
0m 1.3
1.3 23.40m 0m
0m
6.50m 1.3
0m
1.3 1.3
0m 0m
1.3 1.3
0 0m
m
1.3 1.3
0m
0m 1.3
0m

STAGE 2
1.3
0m 1.3
m
1.3 1.30
0m 0m
1.3

DETAIL 1
1.3
0m 0m
1.3 1.3
0 0m
m 1.3
1.3 0m
0m 1.3
1.3 0m 0m
0 m 1.3 6.5
1.3 0m
0m 1.3
1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m
1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m 1.30m
6.50m 33.80m

PLAN VIEW
A

UNIVERSAL COLUMN
1.30m 1.30m (305 X 305 X 97)
(+3.20) (+3.20)
0 SUBMISSION 11-MAR-2017
REV. NO. DESCRIPTION Date
OWNER:

DETAIL 1 INFILL WOODEN


PANEL
ROYAL ARCHITECT
PROJECT MANAGER
UNIVERSAL COLUMN
(305X305X97) 1.30m 1.30m
CONSULTANT:

WOODEN AURECON AUSTRALIA PTY LTD.


IN-FILL PANEL

MAIN CONTRACTOR:
UNIVERSAL COLUMN
(305 X 305 X 97)
FILE LOCATION: F:\VISMARK-WORK -PROJECT\2017\PROJECT 2017\Al Faraa\modifede-rev.1\SHORING LAYOUT REV.1.dwg

(-4.30)
WOODEN
SQUARE SECTION
(3'' x 3'') PROJECT NAME :

THE CONSTELLATION
(PAVILION AND SANCTUARY)
ZONE :

PLYWOOD PANEL ABU DHABI CITY-U.A.E


(18.0 mm)
SECTOR NO : PLOT NO :

- -
SQUARE 3.0"X3.0"
18mm SHORING CONTRACTOR :

PLYWOOD
S & H ENGINEERING LLC
18mm Tel no. 02-6313253 Fax: 02-6317704 P.O. Box 46865

1.22m PLYWOOD

INFILL WOODEN
DRAWING TITLE :

SECTION A-A PANEL KING POST SHORING


SYSTEM
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
INPUT DATA

SOIL PROFILE
Stratum Elevation of ---------- Soil types ----------
no. top of stratum Active side Passive side
1 1.00 1 Sand L#1 1 Sand L#1
2 -4.32 2 Sand L#2 2 Sand L#2
3 -6.82 3 Rock L#3 3 Rock L#3

SOIL PROPERTIES
Bulk Young's At rest Consol Active Passive
-- Soil type -- density Modulus coeff. state. limit limit Cohesion
No. Description kN/m3 Eh,kN/m2 Ko NC/OC Ka Kp kN/m2
(Datum elev.) (dEh/dy ) (dKo/dy) ( Nu ) ( Kac ) ( Kpc ) ( dc/dy )
1 Sand L#1 16.00 30000 0.412 OC 0.236 5.530
(0.250) (0.000) ( 0.000)
2 Sand L#2 18.00 50000 0.357 OC 0.196 7.243
(0.220) (0.000) ( 0.000)
3 Rock L#3 20.00 119500 0.357 OC 0.196 7.243 119.5d
(0.200) (0.958) ( 7.440)

GROUND WATER CONDITIONS


Density of water = 10.00 kN/m3
Active side Passive side
Initial water table elevation -25.00 -25.00

Automatic water pressure balancing at toe of wall : No

WALL PROPERTIES
Elevation of toe of wall = -11.00
Maximum finite element length = 0.16
Youngs modulus of wall E = 2.0000E+08 kN/m2
Moment of inertia of wall I = 1.7115E-04 m4/m run
E.I = 34231 kN.m2/m run

SURCHARGE LOADS
Distance Length Width Surcharge
Surcharge from parallel perpend. ----- kN/m2 -----
no. Elev. wall to wall to wall Near edge Far edge
1 1.00 0.00(A) 100.00 100.00 10.00 =

Note: A = Active side, P = Passive side

CONSTRUCTION STAGES
Construction Stage description
stage no. --------------------------------------------------------
1 Apply surcharge no.1 at elevation 1.00
2 Excavate to elevation -4.30 on PASSIVE side
FACTORS OF SAFETY and ANALYSIS OPTIONS
Type of structure - Retaining wall

Stability analysis:
Method of analysis - Strength Factor method
Factor on soil strength for calculating wall depth = 1.50
Factor on soil strength for calculating tie force = 1.50

Parameters for undrained strata:


Minimum equivalent fluid density = 5.00 kN/m3
Maximum depth of water filled tension crack = 0.00 m

Bending moment and displacement calculation:


Method - Subgrade reaction model using Influence Coefficients
Open Tension Crack analysis? - No
Non-linear Modulus Parameter (L) = 0 m

Boundary conditions:
Length of wall (normal to plane of analysis) = 1000.00 m

Width of excavation on active side of wall = 20.00 m


Width of excavation on passive side of wall = 20.00 m

Distance to rigid boundary on active side = 20.00 m


Distance to rigid boundary on passive side = 20.00 m

OUTPUT OPTIONS
Results to be stored on disk? - Yes
Results to be output on the printer? - No

Stage ------ Stage description ----------- ------- Output options -------


no. Displacement Active, Graph.
Bending mom. Passive output
Shear force pressures
1 Apply surcharge no.1 at elev. 1.00 Yes Yes Yes
2 Excav. to elev. -4.30 on PASSIVE side Yes Yes Yes
* Summary output Yes - Yes

Program WALLAP - Copyright (C) 2005 by DL Borin, distributed by GEOSOLVE


69 Rodenhurst Road, London SW4, UK. Tel: +44 20 8674 7251
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Stage No. 1 Apply surcharge no.1 at elevation 1.00

STABILITY ANALYSIS according to Strength Factor method


Factor of safety on soil strength

FoS for toe Toe elev. for Strut force


elev. = -11.00 FoS = 1.500 for F=1.500
--------------- ------------- -----------
Stage --- G.L. --- Strut Factor Moment Toe Wall Strut
No. Act. Pass. Elev. of equilib. elev. Penetr force
Safety at elev. -ation kN/m run
1 1.00 1.00 Cant. 25.374 -9.51 0.77 0.23

BENDING MOMENT and DISPLACEMENT CALCULATION - Assumptions:


Subgrade reaction model - Boussinesq Influence coefficients
Soil deformations are elastic until the active or passive limit is reached
Open Tension Crack analysis - No
Length of wall perpendicular to section = 1000.00m

Rigid boundaries: Active side 20.00 from wall


Passive side 20.00 from wall

Node Y Nett Wall Wall Shear Bending Strut


no. coord pressure disp. rotation force moment forces
kN/m2 m rad. kN/m kN.m/m kN/m
1 1.00 2.36 0.001 2.28E-05 0.0 0.0
2 0.90 0.21 0.001 2.27E-05 0.1 0.0
3 0.80 -0.07 0.001 2.27E-05 0.1 0.0
4 0.64 -0.36 0.001 2.25E-05 0.1 0.1
5 0.48 -0.34 0.001 2.22E-05 0.0 0.1
6 0.32 -0.31 0.000 2.19E-05 -0.0 0.1
7 0.16 -0.29 0.000 2.16E-05 -0.1 0.1
8 0.00 -0.26 0.000 2.14E-05 -0.1 0.0
9 -0.16 -0.24 0.000 2.12E-05 -0.1 0.0
10 -0.32 -0.21 0.000 2.11E-05 -0.2 0.0
11 -0.48 -0.19 0.000 2.12E-05 -0.2 -0.0
12 -0.64 -0.16 0.000 2.14E-05 -0.2 -0.1
13 -0.80 -0.14 0.000 2.18E-05 -0.3 -0.1
14 -0.96 -0.11 0.000 2.24E-05 -0.3 -0.1
15 -1.12 -0.08 0.000 2.31E-05 -0.3 -0.2
16 -1.28 -0.06 0.000 2.41E-05 -0.3 -0.2
17 -1.44 -0.03 0.000 2.54E-05 -0.3 -0.3
18 -1.60 0.00 0.000 2.68E-05 -0.3 -0.3
19 -1.76 0.04 0.000 2.85E-05 -0.3 -0.4
20 -1.92 0.07 0.000 3.05E-05 -0.3 -0.4
21 -2.08 0.11 0.000 3.26E-05 -0.3 -0.5
22 -2.24 0.15 0.000 3.50E-05 -0.3 -0.5
23 -2.40 0.19 0.000 3.76E-05 -0.2 -0.6
24 -2.56 0.23 0.000 4.03E-05 -0.2 -0.6
25 -2.72 0.28 0.000 4.32E-05 -0.2 -0.6
26 -2.88 0.34 0.000 4.62E-05 -0.1 -0.7
27 -3.04 0.39 0.000 4.93E-05 -0.1 -0.7
28 -3.20 0.45 0.000 5.25E-05 0.0 -0.7
29 -3.36 0.51 0.000 5.56E-05 0.1 -0.7
30 -3.52 0.58 0.000 5.87E-05 0.2 -0.6
31 -3.68 0.65 0.000 6.17E-05 0.3 -0.6
32 -3.84 0.73 0.000 6.44E-05 0.4 -0.6
33 -4.00 0.80 0.000 6.69E-05 0.5 -0.5
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.1 Apply surcharge no.1 at elevation 1.00 (continued)

Node Y Nett Wall Wall Shear Bending Strut


no. coord pressure disp. rotation force moment forces
kN/m2 m rad. kN/m kN.m/m kN/m
34 -4.15 0.88 0.000 6.88E-05 0.6 -0.4
35 -4.30 0.95 0.000 7.04E-05 0.8 -0.3
36 -4.32 0.96 0.000 7.05E-05 0.8 -0.3
-1.02 0.000 7.05E-05 0.8 -0.3
37 -4.48 -0.89 0.000 7.16E-05 0.6 -0.2
38 -4.64 -0.75 0.000 7.22E-05 0.5 -0.1
39 -4.80 -0.62 0.000 7.24E-05 0.4 -0.0
40 -4.96 -0.48 0.000 7.23E-05 0.3 0.0
41 -5.12 -0.34 0.000 7.20E-05 0.2 0.1
42 -5.28 -0.20 0.000 7.15E-05 0.2 0.1
43 -5.44 -0.07 0.000 7.09E-05 0.2 0.2
44 -5.60 0.06 0.000 7.01E-05 0.2 0.2
45 -5.76 0.20 0.000 6.92E-05 0.2 0.2
46 -5.92 0.33 0.000 6.81E-05 0.2 0.2
47 -6.08 0.45 0.000 6.69E-05 0.3 0.3
48 -6.24 0.58 0.000 6.54E-05 0.4 0.3
49 -6.40 0.70 0.000 6.37E-05 0.5 0.4
50 -6.56 0.82 0.000 6.15E-05 0.6 0.5
51 -6.69 0.91 0.000 5.95E-05 0.7 0.6
52 -6.82 1.00 0.000 5.71E-05 0.8 0.7
-1.77 0.000 5.71E-05 0.8 0.7
53 -6.93 -1.59 0.000 5.48E-05 0.7 0.8
54 -7.04 -1.43 0.000 5.22E-05 0.5 0.8
55 -7.20 -1.20 0.000 4.82E-05 0.3 0.9
56 -7.36 -1.00 0.000 4.40E-05 0.1 0.9
57 -7.52 -0.81 0.000 3.96E-05 -0.0 0.9
58 -7.68 -0.64 0.000 3.54E-05 -0.2 0.9
59 -7.84 -0.50 0.000 3.12E-05 -0.2 0.9
60 -8.00 -0.37 0.000 2.72E-05 -0.3 0.8
61 -8.16 -0.25 0.000 2.35E-05 -0.4 0.8
62 -8.32 -0.16 0.000 2.00E-05 -0.4 0.7
63 -8.48 -0.07 0.000 1.68E-05 -0.4 0.6
64 -8.64 -0.01 0.000 1.39E-05 -0.4 0.6
65 -8.80 0.05 0.000 1.13E-05 -0.4 0.5
66 -8.96 0.10 0.000 9.14E-06 -0.4 0.4
67 -9.12 0.13 0.000 7.19E-06 -0.4 0.4
68 -9.28 0.16 0.000 5.54E-06 -0.4 0.3
69 -9.44 0.18 0.000 4.15E-06 -0.3 0.3
70 -9.60 0.20 0.000 3.01E-06 -0.3 0.2
71 -9.76 0.21 0.000 2.10E-06 -0.3 0.2
72 -9.92 0.21 0.000 1.40E-06 -0.2 0.1
73 -10.08 0.22 0.000 8.81E-07 -0.2 0.1
74 -10.24 0.22 0.000 5.10E-07 -0.2 0.1
75 -10.40 0.22 0.000 2.65E-07 -0.1 0.0
76 -10.56 0.22 0.000 1.21E-07 -0.1 0.0
77 -10.72 0.22 0.000 5.08E-08 -0.1 0.0
78 -10.86 0.22 0.000 2.85E-08 -0.0 0.0
79 -11.00 0.22 0.000 2.40E-08 -0.0 -0.0
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.1 Apply surcharge no.1 at elevation 1.00 (continued)

Node Y ------------------------ ACTIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
1 1.00 0.00 10.00 2.36 55.30 2.36 2.36a 3657
2 0.90 0.00 11.60 2.73 64.14 2.73 2.73a 3657
3 0.80 0.00 13.20 3.11 72.99 3.11 3.11a 3657
4 0.64 0.00 15.76 3.72 87.15 3.86 3.86 3657
5 0.48 0.00 18.32 4.32 101.31 4.93 4.93 3657
6 0.32 0.00 20.88 4.92 115.47 6.00 6.00 3657
7 0.16 0.00 23.44 5.53 129.63 7.06 7.06 3657
8 0.00 0.00 26.00 6.13 143.78 8.13 8.13 3657
9 -0.16 0.00 28.56 6.73 157.94 9.20 9.20 3657
10 -0.32 0.00 31.12 7.34 172.10 10.27 10.27 3657
11 -0.48 0.00 33.68 7.94 186.25 11.33 11.33 3657
12 -0.64 0.00 36.24 8.55 200.41 12.40 12.40 3657
13 -0.80 0.00 38.80 9.15 214.57 13.47 13.47 3657
14 -0.96 0.00 41.36 9.75 228.72 14.54 14.54 3657
15 -1.12 0.00 43.92 10.36 242.88 15.61 15.61 3657
16 -1.28 0.00 46.48 10.96 257.04 16.68 16.68 3657
17 -1.44 0.00 49.04 11.56 271.19 17.75 17.75 3657
18 -1.60 0.00 51.60 12.17 285.35 18.82 18.82 3657
19 -1.76 0.00 54.16 12.77 299.51 19.89 19.89 3657
20 -1.92 0.00 56.72 13.37 313.66 20.96 20.96 3657
21 -2.08 0.00 59.28 13.98 327.82 22.03 22.03 3657
22 -2.24 0.00 61.84 14.58 341.98 23.11 23.11 3657
23 -2.40 0.00 64.40 15.18 356.13 24.18 24.18 3657
24 -2.56 0.00 66.96 15.79 370.29 25.26 25.26 3657
25 -2.72 0.00 69.52 16.39 384.44 26.34 26.34 3657
26 -2.88 0.00 72.08 17.00 398.60 27.42 27.42 3657
27 -3.04 0.00 74.64 17.60 412.76 28.51 28.51 3657
28 -3.20 0.00 77.20 18.20 426.91 29.59 29.59 3657
29 -3.36 0.00 79.76 18.81 441.07 30.68 30.68 3657
30 -3.52 0.00 82.32 19.41 455.22 31.77 31.77 3657
31 -3.68 0.00 84.88 20.01 469.38 32.86 32.86 3657
32 -3.84 0.00 87.44 20.62 483.53 33.95 33.95 3657
33 -4.00 0.00 90.00 21.22 497.69 35.04 35.04 3657
34 -4.15 0.00 92.40 21.79 510.96 36.07 36.07 3657
35 -4.30 0.00 94.79 22.35 524.23 37.10 37.10 3657
36 -4.32 0.00 95.11 22.43 526.00 37.23 37.23 3657
0.00 95.11 18.64 688.91 31.30 31.30 5937
37 -4.48 0.00 97.99 19.21 709.77 32.40 32.40 5937
38 -4.64 0.00 100.87 19.77 730.63 33.50 33.50 5937
39 -4.80 0.00 103.75 20.34 751.48 34.59 34.59 5937
40 -4.96 0.00 106.63 20.90 772.34 35.69 35.69 5937
41 -5.12 0.00 109.51 21.46 793.19 36.79 36.79 5937
42 -5.28 0.00 112.39 22.03 814.05 37.88 37.88 5937
43 -5.44 0.00 115.27 22.59 834.90 38.98 38.98 5937
44 -5.60 0.00 118.15 23.16 855.76 40.08 40.08 5937
45 -5.76 0.00 121.03 23.72 876.61 41.17 41.17 5937
46 -5.92 0.00 123.91 24.29 897.47 42.26 42.26 5937
47 -6.08 0.00 126.79 24.85 918.32 43.36 43.36 5937
48 -6.24 0.00 129.67 25.41 939.17 44.45 44.45 5937
49 -6.40 0.00 132.55 25.98 960.03 45.54 45.54 5937
50 -6.56 0.00 135.42 26.54 980.88 46.63 46.63 5937
51 -6.69 0.00 137.76 27.00 997.82 47.51 47.51 5937
52 -6.82 0.00 140.10 27.46 1014.77 48.39 48.39 5937
0.00 140.10 0.00 1903.79 46.84 46.84 13965
53 -6.93 0.00 142.30 0.00 1919.72 47.72 47.72 13965
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.1 Apply surcharge no.1 at elevation 1.00 (continued)

Node Y ------------------------ ACTIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
54 -7.04 0.00 144.50 0.00 1935.64 48.58 48.58 13965
55 -7.20 0.00 147.70 0.00 1958.81 49.84 49.84 13965
56 -7.36 0.00 150.90 0.00 1981.98 51.08 51.08 13965
57 -7.52 0.00 154.10 0.00 2005.15 52.32 52.32 13965
58 -7.68 0.00 157.30 0.00 2028.32 53.55 53.55 13965
59 -7.84 0.00 160.50 0.00 2051.48 54.76 54.76 13965
60 -8.00 0.00 163.69 0.00 2074.65 55.97 55.97 13965
61 -8.16 0.00 166.89 0.00 2097.82 57.17 57.17 13965
62 -8.32 0.00 170.09 0.00 2120.98 58.36 58.36 13965
63 -8.48 0.00 173.29 0.00 2144.15 59.55 59.55 13965
64 -8.64 0.00 176.49 0.00 2167.31 60.72 60.72 13965
65 -8.80 0.00 179.69 0.00 2190.48 61.90 61.90 13965
66 -8.96 0.00 182.89 0.00 2213.64 63.06 63.06 13965
67 -9.12 0.00 186.08 0.00 2236.81 64.22 64.22 13965
68 -9.28 0.00 189.28 0.00 2259.97 65.38 65.38 13965
69 -9.44 0.00 192.48 0.00 2283.14 66.53 66.53 13965
70 -9.60 0.00 195.68 0.00 2306.30 67.68 67.68 13965
71 -9.76 0.00 198.88 0.00 2329.46 68.83 68.83 13965
72 -9.92 0.00 202.08 0.00 2352.63 69.98 69.98 13965
73 -10.08 0.00 205.27 0.00 2375.79 71.12 71.12 13965
74 -10.24 0.00 208.47 0.00 2398.95 72.27 72.27 13965
75 -10.40 0.00 211.67 0.00 2422.11 73.41 73.41 13965
76 -10.56 0.00 214.87 0.00 2445.27 74.55 74.55 13965
77 -10.72 0.00 218.07 0.00 2468.43 75.70 75.70 13965
78 -10.86 0.00 220.86 0.00 2488.70 76.70 76.70 13965
79 -11.00 0.00 223.66 0.00 2508.96 77.69 77.69 13965

Node Y ----------------------- PASSIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
1 1.00 0.00 0.00 0.00 0.00 0.00 0.00 3657
2 0.90 0.00 1.60 0.38 8.85 2.53 2.53 3657
3 0.80 0.00 3.20 0.75 17.70 3.18 3.18 3657
4 0.64 0.00 5.76 1.36 31.85 4.22 4.22 3657
5 0.48 0.00 8.32 1.96 46.01 5.26 5.26 3657
6 0.32 0.00 10.88 2.57 60.17 6.31 6.31 3657
7 0.16 0.00 13.44 3.17 74.33 7.35 7.35 3657
8 0.00 0.00 16.00 3.77 88.48 8.39 8.39 3657
9 -0.16 0.00 18.56 4.38 102.64 9.44 9.44 3657
10 -0.32 0.00 21.12 4.98 116.80 10.48 10.48 3657
11 -0.48 0.00 23.68 5.58 130.95 11.52 11.52 3657
12 -0.64 0.00 26.24 6.19 145.11 12.56 12.56 3657
13 -0.80 0.00 28.80 6.79 159.27 13.61 13.61 3657
14 -0.96 0.00 31.36 7.39 173.43 14.65 14.65 3657
15 -1.12 0.00 33.92 8.00 187.58 15.69 15.69 3657
16 -1.28 0.00 36.48 8.60 201.74 16.73 16.73 3657
17 -1.44 0.00 39.04 9.21 215.90 17.77 17.77 3657
18 -1.60 0.00 41.60 9.81 230.05 18.81 18.81 3657
19 -1.76 0.00 44.16 10.41 244.21 19.85 19.85 3657
20 -1.92 0.00 46.72 11.02 258.37 20.89 20.89 3657
21 -2.08 0.00 49.28 11.62 272.53 21.93 21.93 3657
22 -2.24 0.00 51.84 12.22 286.68 22.96 22.96 3657
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.1 Apply surcharge no.1 at elevation 1.00 (continued)

Node Y ----------------------- PASSIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
23 -2.40 0.00 54.40 12.83 300.84 24.00 24.00 3657
24 -2.56 0.00 56.96 13.43 315.00 25.03 25.03 3657
25 -2.72 0.00 59.52 14.03 329.15 26.06 26.06 3657
26 -2.88 0.00 62.08 14.64 343.31 27.09 27.09 3657
27 -3.04 0.00 64.64 15.24 357.47 28.11 28.11 3657
28 -3.20 0.00 67.20 15.85 371.63 29.14 29.14 3657
29 -3.36 0.00 69.76 16.45 385.78 30.16 30.16 3657
30 -3.52 0.00 72.32 17.05 399.94 31.19 31.19 3657
31 -3.68 0.00 74.88 17.66 414.10 32.21 32.21 3657
32 -3.84 0.00 77.44 18.26 428.25 33.22 33.22 3657
33 -4.00 0.00 80.00 18.86 442.41 34.24 34.24 3657
34 -4.15 0.00 82.40 19.43 455.68 35.19 35.19 3657
35 -4.30 0.00 84.80 20.00 468.96 36.14 36.14 3657
36 -4.32 0.00 85.12 20.07 470.73 36.27 36.27 3657
0.00 85.12 16.68 616.52 32.33 32.33 5937
37 -4.48 0.00 88.00 17.25 637.38 33.29 33.29 5937
38 -4.64 0.00 90.88 17.81 658.24 34.25 34.25 5937
39 -4.80 0.00 93.76 18.38 679.10 35.21 35.21 5937
40 -4.96 0.00 96.64 18.94 699.96 36.17 36.17 5937
41 -5.12 0.00 99.52 19.51 720.82 37.13 37.13 5937
42 -5.28 0.00 102.40 20.07 741.68 38.09 38.09 5937
43 -5.44 0.00 105.28 20.63 762.54 39.05 39.05 5937
44 -5.60 0.00 108.16 21.20 783.40 40.01 40.01 5937
45 -5.76 0.00 111.04 21.76 804.26 40.97 40.97 5937
46 -5.92 0.00 113.92 22.33 825.12 41.94 41.94 5937
47 -6.08 0.00 116.80 22.89 845.98 42.90 42.90 5937
48 -6.24 0.00 119.68 23.46 866.84 43.87 43.87 5937
49 -6.40 0.00 122.56 24.02 887.70 44.84 44.84 5937
50 -6.56 0.00 125.44 24.59 908.56 45.80 45.80 5937
51 -6.69 0.00 127.78 25.04 925.51 46.59 46.59 5937
52 -6.82 0.00 130.12 25.50 942.46 47.38 47.38 5937
0.00 130.12 0.00 1831.48 48.61 48.61 13965
53 -6.93 0.00 132.32 0.00 1847.42 49.31 49.31 13965
54 -7.04 0.00 134.52 0.00 1863.35 50.01 50.01 13965
55 -7.20 0.00 137.72 0.00 1886.53 51.04 51.04 13965
56 -7.36 0.00 140.92 0.00 1909.70 52.08 52.08 13965
57 -7.52 0.00 144.12 0.00 1932.88 53.13 53.13 13965
58 -7.68 0.00 147.32 0.00 1956.06 54.19 54.19 13965
59 -7.84 0.00 150.52 0.00 1979.23 55.26 55.26 13965
60 -8.00 0.00 153.72 0.00 2002.41 56.34 56.34 13965
61 -8.16 0.00 156.92 0.00 2025.58 57.42 57.42 13965
62 -8.32 0.00 160.12 0.00 2048.76 58.52 58.52 13965
63 -8.48 0.00 163.32 0.00 2071.94 59.62 59.62 13965
64 -8.64 0.00 166.52 0.00 2095.11 60.73 60.73 13965
65 -8.80 0.00 169.72 0.00 2118.29 61.84 61.84 13965
66 -8.96 0.00 172.92 0.00 2141.47 62.96 62.96 13965
67 -9.12 0.00 176.12 0.00 2164.64 64.09 64.09 13965
68 -9.28 0.00 179.32 0.00 2187.82 65.22 65.22 13965
69 -9.44 0.00 182.52 0.00 2210.99 66.35 66.35 13965
70 -9.60 0.00 185.72 0.00 2234.17 67.49 67.49 13965
71 -9.76 0.00 188.92 0.00 2257.35 68.62 68.62 13965
72 -9.92 0.00 192.12 0.00 2280.52 69.76 69.76 13965
73 -10.08 0.00 195.32 0.00 2303.70 70.90 70.90 13965
74 -10.24 0.00 198.52 0.00 2326.88 72.04 72.04 13965
75 -10.40 0.00 201.72 0.00 2350.05 73.19 73.19 13965
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.1 Apply surcharge no.1 at elevation 1.00 (continued)

Node Y ----------------------- PASSIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
76 -10.56 0.00 204.92 0.00 2373.23 74.33 74.33 13965
77 -10.72 0.00 208.12 0.00 2396.40 75.47 75.47 13965
78 -10.86 0.00 210.92 0.00 2416.68 76.47 76.47 13965
79 -11.00 0.00 213.72 0.00 2436.96 77.47 77.47 13965

Note: 3.11a Soil pressure at active limit


123.45p Soil pressure at passive limit
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Stage No. 2 Excavate to elevation -4.30 on PASSIVE side

STABILITY ANALYSIS according to Strength Factor method


Factor of safety on soil strength

FoS for toe Toe elev. for Strut force


elev. = -11.00 FoS = 1.500 for F=1.500
--------------- ------------- -----------
Stage --- G.L. --- Strut Factor Moment Toe Wall Strut
No. Act. Pass. Elev. of equilib. elev. Penetr force
Safety at elev. -ation kN/m run
2 1.00 -4.30 Cant. 2.601 -9.80 -8.61 4.31

BENDING MOMENT and DISPLACEMENT CALCULATION - Assumptions:


Subgrade reaction model - Boussinesq Influence coefficients
Soil deformations are elastic until the active or passive limit is reached
Open Tension Crack analysis - No
Length of wall perpendicular to section = 1000.00m

Rigid boundaries: Active side 20.00 from wall


Passive side 20.00 from wall

Node Y Nett Wall Wall Shear Bending Strut


no. coord pressure disp. rotation force moment forces
kN/m2 m rad. kN/m kN.m/m kN/m
1 1.00 2.36 0.114 1.89E-02 0.0 0.0
2 0.90 2.73 0.112 1.89E-02 0.3 0.0
3 0.80 3.11 0.110 1.89E-02 0.5 0.1
4 0.64 3.72 0.107 1.89E-02 1.1 0.2
5 0.48 4.32 0.104 1.89E-02 1.7 0.4
6 0.32 4.92 0.101 1.89E-02 2.5 0.8
7 0.16 5.53 0.098 1.89E-02 3.3 1.2
8 0.00 6.13 0.095 1.89E-02 4.2 1.8
9 -0.16 6.73 0.092 1.88E-02 5.3 2.6
10 -0.32 7.34 0.089 1.88E-02 6.4 3.5
11 -0.48 7.94 0.086 1.88E-02 7.6 4.6
12 -0.64 8.55 0.083 1.88E-02 8.9 6.0
13 -0.80 9.15 0.080 1.88E-02 10.4 7.5
14 -0.96 9.75 0.077 1.87E-02 11.9 9.3
15 -1.12 10.36 0.074 1.87E-02 13.5 11.3
16 -1.28 10.96 0.071 1.86E-02 15.2 13.6
17 -1.44 11.56 0.068 1.85E-02 17.0 16.2
18 -1.60 12.17 0.065 1.85E-02 18.9 19.0
19 -1.76 12.77 0.062 1.84E-02 20.9 22.2
20 -1.92 13.37 0.059 1.83E-02 23.0 25.7
21 -2.08 13.98 0.056 1.81E-02 25.2 29.6
22 -2.24 14.58 0.054 1.80E-02 27.4 33.8
23 -2.40 15.18 0.051 1.78E-02 29.8 38.4
24 -2.56 15.79 0.048 1.76E-02 32.3 43.3
25 -2.72 16.39 0.045 1.74E-02 34.9 48.7
26 -2.88 17.00 0.042 1.72E-02 37.5 54.5
27 -3.04 17.60 0.040 1.69E-02 40.3 60.7
28 -3.20 18.20 0.037 1.66E-02 43.2 67.4
29 -3.36 18.81 0.034 1.63E-02 46.1 74.5
30 -3.52 19.41 0.032 1.59E-02 49.2 82.2
31 -3.68 20.01 0.029 1.55E-02 52.4 90.3
32 -3.84 20.62 0.027 1.50E-02 55.6 98.9
33 -4.00 21.22 0.024 1.46E-02 58.9 108.1
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.2 Excavate to elevation -4.30 on PASSIVE side (continued)

Node Y Nett Wall Wall Shear Bending Strut


no. coord pressure disp. rotation force moment forces
kN/m2 m rad. kN/m kN.m/m kN/m
34 -4.15 21.79 0.022 1.41E-02 62.2 117.2
35 -4.30 22.35 0.020 1.35E-02 65.5 126.7
36 -4.32 20.66 0.020 1.35E-02 65.9 128.0
16.32 0.020 1.35E-02 65.9 128.0
37 -4.48 -3.97 0.018 1.28E-02 66.9 138.7
38 -4.64 -24.27 0.016 1.22E-02 64.6 149.3
39 -4.80 -44.57 0.014 1.14E-02 59.1 159.2
40 -4.96 -64.87 0.012 1.07E-02 50.4 168.0
41 -5.12 -85.17 0.010 9.92E-03 38.4 175.2
42 -5.28 -105.48 0.009 9.09E-03 23.1 180.1
43 -5.44 -125.79 0.007 8.24E-03 4.6 182.4
44 -5.60 -130.36 0.006 7.39E-03 -15.9 182.1
45 -5.76 -105.04 0.005 6.55E-03 -34.7 177.9
46 -5.92 -82.81 0.004 5.74E-03 -49.7 171.0
47 -6.08 -63.54 0.003 4.96E-03 -61.4 162.0
48 -6.24 -47.09 0.002 4.23E-03 -70.3 151.3
49 -6.40 -28.94 0.002 3.55E-03 -76.4 139.6
50 -6.56 -12.31 0.001 2.92E-03 -79.7 127.0
51 -6.69 -1.09 0.001 2.46E-03 -80.5 116.5
52 -6.82 8.27 0.001 2.04E-03 -80.1 106.0
-19.82 0.001 2.04E-03 -80.1 106.0
53 -6.93 -4.28 0.000 1.71E-03 -81.4 97.1
54 -7.04 8.64 0.000 1.41E-03 -81.2 88.1
55 -7.20 23.34 0.000 1.03E-03 -78.6 75.2
56 -7.36 33.93 -0.000 7.13E-04 -74.0 63.0
57 -7.52 40.84 -0.000 4.46E-04 -68.0 51.6
58 -7.68 44.73 -0.000 2.29E-04 -61.2 41.2
59 -7.84 46.22 -0.000 5.82E-05 -53.9 32.0
60 -8.00 45.85 -0.000 -7.24E-05 -46.5 23.9
61 -8.16 44.08 -0.000 -1.68E-04 -39.4 17.1
62 -8.32 41.33 -0.000 -2.34E-04 -32.5 11.4
63 -8.48 37.93 -0.000 -2.76E-04 -26.2 6.7
64 -8.64 34.14 -0.000 -2.99E-04 -20.4 3.0
65 -8.80 30.20 -0.000 -3.06E-04 -15.3 0.1
66 -8.96 26.25 0.000 -3.02E-04 -10.7 -1.9
67 -9.12 22.43 0.000 -2.90E-04 -6.9 -3.3
68 -9.28 18.47 0.000 -2.73E-04 -3.6 -4.1
69 -9.44 14.63 0.000 -2.53E-04 -0.9 -4.4
70 -9.60 11.09 0.000 -2.32E-04 1.1 -4.4
71 -9.76 7.85 0.000 -2.12E-04 2.6 -4.1
72 -9.92 4.89 0.000 -1.94E-04 3.7 -3.6
73 -10.08 2.18 0.000 -1.79E-04 4.2 -2.9
74 -10.24 -0.34 0.000 -1.67E-04 4.4 -2.2
75 -10.40 -2.71 0.000 -1.58E-04 4.1 -1.5
76 -10.56 -4.97 0.000 -1.53E-04 3.5 -0.9
77 -10.72 -7.17 0.000 -1.50E-04 2.5 -0.4
78 -10.86 -9.07 0.000 -1.49E-04 1.4 -0.1
79 -11.00 -10.96 0.000 -1.49E-04 0.0 -0.0
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.2 Excavate to elevation -4.30 on PASSIVE side (continued)

Node Y ------------------------ ACTIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
1 1.00 0.00 10.00 2.36 55.30 2.36 2.36a 5685
2 0.90 0.00 11.60 2.73 64.14 2.73 2.73a 5685
3 0.80 0.00 13.20 3.11 72.99 3.11 3.11a 5685
4 0.64 0.00 15.76 3.72 87.15 3.72 3.72a 5685
5 0.48 0.00 18.32 4.32 101.31 4.32 4.32a 5685
6 0.32 0.00 20.88 4.92 115.47 4.92 4.92a 5685
7 0.16 0.00 23.44 5.53 129.63 5.53 5.53a 5685
8 0.00 0.00 26.00 6.13 143.78 6.13 6.13a 5685
9 -0.16 0.00 28.56 6.73 157.94 6.73 6.73a 5685
10 -0.32 0.00 31.12 7.34 172.10 7.34 7.34a 5685
11 -0.48 0.00 33.68 7.94 186.25 7.94 7.94a 5685
12 -0.64 0.00 36.24 8.55 200.41 8.55 8.55a 5685
13 -0.80 0.00 38.80 9.15 214.57 9.15 9.15a 5685
14 -0.96 0.00 41.36 9.75 228.72 9.75 9.75a 5685
15 -1.12 0.00 43.92 10.36 242.88 10.36 10.36a 5685
16 -1.28 0.00 46.48 10.96 257.04 10.96 10.96a 5685
17 -1.44 0.00 49.04 11.56 271.19 11.56 11.56a 5685
18 -1.60 0.00 51.60 12.17 285.35 12.17 12.17a 5685
19 -1.76 0.00 54.16 12.77 299.51 12.77 12.77a 5685
20 -1.92 0.00 56.72 13.37 313.66 13.37 13.37a 5685
21 -2.08 0.00 59.28 13.98 327.82 13.98 13.98a 5685
22 -2.24 0.00 61.84 14.58 341.98 14.58 14.58a 5685
23 -2.40 0.00 64.40 15.18 356.13 15.18 15.18a 5685
24 -2.56 0.00 66.96 15.79 370.29 15.79 15.79a 5685
25 -2.72 0.00 69.52 16.39 384.44 16.39 16.39a 5685
26 -2.88 0.00 72.08 17.00 398.60 17.00 17.00a 5685
27 -3.04 0.00 74.64 17.60 412.76 17.60 17.60a 5685
28 -3.20 0.00 77.20 18.20 426.91 18.20 18.20a 5685
29 -3.36 0.00 79.76 18.81 441.07 18.81 18.81a 5685
30 -3.52 0.00 82.32 19.41 455.22 19.41 19.41a 5685
31 -3.68 0.00 84.88 20.01 469.38 20.01 20.01a 5685
32 -3.84 0.00 87.44 20.62 483.53 20.62 20.62a 5685
33 -4.00 0.00 90.00 21.22 497.69 21.22 21.22a 5685
34 -4.15 0.00 92.40 21.79 510.96 21.79 21.79a 5685
35 -4.30 0.00 94.79 22.35 524.23 22.35 22.35a 5685
36 -4.32 0.00 95.11 22.43 526.00 22.43 22.43a 5685
0.00 95.11 18.64 688.91 18.64 18.64a 9254
37 -4.48 0.00 97.99 19.21 709.77 19.21 19.21a 9254
38 -4.64 0.00 100.87 19.77 730.63 19.77 19.77a 9254
39 -4.80 0.00 103.75 20.34 751.48 20.34 20.34a 9254
40 -4.96 0.00 106.63 20.90 772.34 20.90 20.90a 9254
41 -5.12 0.00 109.51 21.46 793.19 21.46 21.46a 9254
42 -5.28 0.00 112.39 22.03 814.05 22.03 22.03a 9254
43 -5.44 0.00 115.27 22.59 834.90 22.59 22.59a 9254
44 -5.60 0.00 118.15 23.16 855.76 23.16 23.16a 9254
45 -5.76 0.00 121.03 23.72 876.61 23.72 23.72a 9254
46 -5.92 0.00 123.91 24.29 897.47 24.29 24.29a 9254
47 -6.08 0.00 126.79 24.85 918.32 24.85 24.85a 9254
48 -6.24 0.00 129.67 25.41 939.17 25.41 25.41a 9254
49 -6.40 0.00 132.55 25.98 960.03 30.31 30.31 9254
50 -6.56 0.00 135.42 26.54 980.88 36.09 36.09 9254
51 -6.69 0.00 137.76 27.00 997.82 40.14 40.14 9254
52 -6.82 0.00 140.10 27.46 1014.77 43.66 43.66 9254
0.00 140.10 0.00 1903.79 35.70 35.70 21805
53 -6.93 0.00 142.30 0.00 1919.72 40.93 40.93 21805
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.2 Excavate to elevation -4.30 on PASSIVE side (continued)

Node Y ------------------------ ACTIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
54 -7.04 0.00 144.50 0.00 1935.64 45.43 45.43 21805
55 -7.20 0.00 147.70 0.00 1958.81 51.53 51.53 39383
56 -7.36 0.00 150.90 0.00 1981.98 57.97 57.97 39383
57 -7.52 0.00 154.10 0.00 2005.15 62.56 62.56 39383
58 -7.68 0.00 157.30 0.00 2028.32 65.66 65.66 39383
59 -7.84 0.00 160.50 0.00 2051.48 67.55 67.55 39383
60 -8.00 0.00 163.69 0.00 2074.65 68.51 68.51 39383
61 -8.16 0.00 166.89 0.00 2097.82 68.77 68.77 39383
62 -8.32 0.00 170.09 0.00 2120.98 68.54 68.54 39383
63 -8.48 0.00 173.29 0.00 2144.15 67.99 67.99 39383
64 -8.64 0.00 176.49 0.00 2167.31 67.24 67.24 39383
65 -8.80 0.00 179.69 0.00 2190.48 66.42 66.42 39383
66 -8.96 0.00 182.89 0.00 2213.64 65.59 65.59 39383
67 -9.12 0.00 186.08 0.00 2236.81 64.83 64.83 39383
68 -9.28 0.00 189.28 0.00 2259.97 64.00 64.00 44930
69 -9.44 0.00 192.48 0.00 2283.14 63.22 63.22 44930
70 -9.60 0.00 195.68 0.00 2306.30 62.60 62.60 44930
71 -9.76 0.00 198.88 0.00 2329.46 62.13 62.13 44930
72 -9.92 0.00 202.08 0.00 2352.63 61.81 61.81 44930
73 -10.08 0.00 205.27 0.00 2375.79 61.60 61.60 44930
74 -10.24 0.00 208.47 0.00 2398.95 61.49 61.49 44930
75 -10.40 0.00 211.67 0.00 2422.11 61.46 61.46 44930
76 -10.56 0.00 214.87 0.00 2445.27 61.48 61.48 44930
77 -10.72 0.00 218.07 0.00 2468.43 61.53 61.53 44930
78 -10.86 0.00 220.86 0.00 2488.70 61.59 61.59 44930
79 -11.00 0.00 223.66 0.00 2508.96 61.65 61.65 44930

Node Y ----------------------- PASSIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
1 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
2 0.90 0.00 0.00 0.00 0.00 0.00 0.00 0.0
3 0.80 0.00 0.00 0.00 0.00 0.00 0.00 0.0
4 0.64 0.00 0.00 0.00 0.00 0.00 0.00 0.0
5 0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.0
6 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.0
7 0.16 0.00 0.00 0.00 0.00 0.00 0.00 0.0
8 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
9 -0.16 0.00 0.00 0.00 0.00 0.00 0.00 0.0
10 -0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.0
11 -0.48 0.00 0.00 0.00 0.00 0.00 0.00 0.0
12 -0.64 0.00 0.00 0.00 0.00 0.00 0.00 0.0
13 -0.80 0.00 0.00 0.00 0.00 0.00 0.00 0.0
14 -0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.0
15 -1.12 0.00 0.00 0.00 0.00 0.00 0.00 0.0
16 -1.28 0.00 0.00 0.00 0.00 0.00 0.00 0.0
17 -1.44 0.00 0.00 0.00 0.00 0.00 0.00 0.0
18 -1.60 0.00 0.00 0.00 0.00 0.00 0.00 0.0
19 -1.76 0.00 0.00 0.00 0.00 0.00 0.00 0.0
20 -1.92 0.00 0.00 0.00 0.00 0.00 0.00 0.0
21 -2.08 0.00 0.00 0.00 0.00 0.00 0.00 0.0
22 -2.24 0.00 0.00 0.00 0.00 0.00 0.00 0.0
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.2 Excavate to elevation -4.30 on PASSIVE side (continued)

Node Y ----------------------- PASSIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
23 -2.40 0.00 0.00 0.00 0.00 0.00 0.00 0.0
24 -2.56 0.00 0.00 0.00 0.00 0.00 0.00 0.0
25 -2.72 0.00 0.00 0.00 0.00 0.00 0.00 0.0
26 -2.88 0.00 0.00 0.00 0.00 0.00 0.00 0.0
27 -3.04 0.00 0.00 0.00 0.00 0.00 0.00 0.0
28 -3.20 0.00 0.00 0.00 0.00 0.00 0.00 0.0
29 -3.36 0.00 0.00 0.00 0.00 0.00 0.00 0.0
30 -3.52 0.00 0.00 0.00 0.00 0.00 0.00 0.0
31 -3.68 0.00 0.00 0.00 0.00 0.00 0.00 0.0
32 -3.84 0.00 0.00 0.00 0.00 0.00 0.00 0.0
33 -4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
34 -4.15 0.00 0.00 0.00 0.00 0.00 0.00 0.0
35 -4.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
0.00 0.00 0.00 0.00 0.00 0.00 14264
36 -4.32 0.00 0.32 0.08 1.77 1.77 1.77p 14264
0.00 0.32 0.06 2.32 2.32 2.32p 23278
37 -4.48 0.00 3.20 0.63 23.18 23.18 23.18p 23278
38 -4.64 0.00 6.08 1.19 44.04 44.04 44.04p 23278
39 -4.80 0.00 8.96 1.76 64.90 64.90 64.90p 23278
40 -4.96 0.00 11.84 2.32 85.77 85.77 85.77p 23278
41 -5.12 0.00 14.72 2.89 106.63 106.63 106.63p 23278
42 -5.28 0.00 17.60 3.45 127.51 127.51 127.51p 23278
43 -5.44 0.00 20.49 4.02 148.38 148.38 148.38p 23278
44 -5.60 0.00 23.37 4.58 169.27 153.52 153.52 23278
45 -5.76 0.00 26.25 5.15 190.16 128.76 128.76 23278
46 -5.92 0.00 29.14 5.71 211.05 107.09 107.09 23278
47 -6.08 0.00 32.03 6.28 231.96 88.39 88.39 23278
48 -6.24 0.00 34.91 6.84 252.87 72.50 72.50 23278
49 -6.40 0.00 37.80 7.41 273.79 59.24 59.24 23278
50 -6.56 0.00 40.69 7.98 294.73 48.40 48.40 23278
51 -6.69 0.00 43.04 8.44 311.74 41.23 41.23 23278
52 -6.82 0.00 45.39 8.90 328.76 35.39 35.39 23278
0.00 45.39 0.00 1217.82 55.52 55.52 54940
53 -6.93 0.00 47.60 0.00 1233.83 45.22 45.22 54940
54 -7.04 0.00 49.81 0.00 1249.84 36.79 36.79 54940
55 -7.20 0.00 53.03 0.00 1273.13 28.18 28.18 39383
56 -7.36 0.00 56.25 0.00 1296.44 24.03 24.03 39383
57 -7.52 0.00 59.47 0.00 1319.76 21.73 21.73 39383
58 -7.68 0.00 62.69 0.00 1343.10 20.92 20.92 39383
59 -7.84 0.00 65.91 0.00 1366.45 21.33 21.33 39383
60 -8.00 0.00 69.14 0.00 1389.82 22.66 22.66 39383
61 -8.16 0.00 72.37 0.00 1413.21 24.69 24.69 39383
62 -8.32 0.00 75.60 0.00 1436.61 27.21 27.21 39383
63 -8.48 0.00 78.83 0.00 1460.03 30.06 30.06 39383
64 -8.64 0.00 82.07 0.00 1483.46 33.10 33.10 39383
65 -8.80 0.00 85.31 0.00 1506.92 36.22 36.22 39383
66 -8.96 0.00 88.55 0.00 1530.39 39.34 39.34 39383
67 -9.12 0.00 91.79 0.00 1553.88 42.40 42.40 39383
68 -9.28 0.00 95.04 0.00 1577.39 45.53 45.53 44930
69 -9.44 0.00 98.29 0.00 1600.92 48.60 48.60 44930
70 -9.60 0.00 101.54 0.00 1624.47 51.52 51.52 44930
71 -9.76 0.00 104.79 0.00 1648.04 54.29 54.29 44930
72 -9.92 0.00 108.05 0.00 1671.63 56.92 56.92 44930
73 -10.08 0.00 111.31 0.00 1695.24 59.42 59.42 44930
74 -10.24 0.00 114.57 0.00 1718.87 61.83 61.83 44930
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Stage No.2 Excavate to elevation -4.30 on PASSIVE side (continued)

Node Y ----------------------- PASSIVE side ---------------------------


no. coord ------- Effective stresses ------- Total Soil
Water Vertic Active Passive Earth earth stiffness
press. -al limit limit pressure pressure coeff.
kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m2 kN/m3
75 -10.40 0.00 117.84 0.00 1742.53 64.17 64.17 44930
76 -10.56 0.00 121.11 0.00 1766.20 66.45 66.45 44930
77 -10.72 0.00 124.38 0.00 1789.90 68.70 68.70 44930
78 -10.86 0.00 127.24 0.00 1810.65 70.66 70.66 44930
79 -11.00 0.00 130.11 0.00 1831.41 72.61 72.61 44930

Note: 25.41a Soil pressure at active limit


148.38p Soil pressure at passive limit
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Summary of results

STABILITY ANALYSIS according to Strength Factor method


Factor of safety on soil strength

FoS for toe Toe elev. for Strut force


elev. = -11.00 FoS = 1.500 for F=1.500
--------------- ------------- -----------
Stage --- G.L. --- Strut Factor Moment Toe Wall Strut
No. Act. Pass. Elev. of equilib. elev. Penetr force
Safety at elev. -ation kN/m run
1 1.00 1.00 Cant. 25.374 -9.51 0.77 0.23
2 1.00 -4.30 Cant. 2.601 -9.80 -8.61 4.31
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Summary of results

BENDING MOMENT and DISPLACEMENT CALCULATION - Assumptions:


Subgrade reaction model - Boussinesq Influence coefficients
Soil deformations are elastic until the active or passive limit is reached
Open Tension Crack analysis - No
Length of wall perpendicular to section = 1000.00m

Rigid boundaries: Active side 20.00 from wall


Passive side 20.00 from wall

Bending moment, shear force and displacement envelopes


Node Y Displacement Bending moment Shear force
no. coord maximum minimum maximum minimum maximum minimum
m m kN.m/m kN.m/m kN/m kN/m
1 1.00 0.114 0.000 0.0 0.0 0.0 0.0
2 0.90 0.112 0.000 0.0 0.0 0.3 0.0
3 0.80 0.110 0.000 0.1 0.0 0.5 0.0
4 0.64 0.107 0.000 0.2 0.0 1.1 0.0
5 0.48 0.104 0.000 0.4 0.0 1.7 0.0
6 0.32 0.101 0.000 0.8 0.0 2.5 -0.0
7 0.16 0.098 0.000 1.2 0.0 3.3 -0.1
8 0.00 0.095 0.000 1.8 0.0 4.2 -0.1
9 -0.16 0.092 0.000 2.6 0.0 5.3 -0.1
10 -0.32 0.089 0.000 3.5 0.0 6.4 -0.2
11 -0.48 0.086 0.000 4.6 -0.0 7.6 -0.2
12 -0.64 0.083 0.000 6.0 -0.1 8.9 -0.2
13 -0.80 0.080 0.000 7.5 -0.1 10.4 -0.3
14 -0.96 0.077 0.000 9.3 -0.1 11.9 -0.3
15 -1.12 0.074 0.000 11.3 -0.2 13.5 -0.3
16 -1.28 0.071 0.000 13.6 -0.2 15.2 -0.3
17 -1.44 0.068 0.000 16.2 -0.3 17.0 -0.3
18 -1.60 0.065 0.000 19.0 -0.3 18.9 -0.3
19 -1.76 0.062 0.000 22.2 -0.4 20.9 -0.3
20 -1.92 0.059 0.000 25.7 -0.4 23.0 -0.3
21 -2.08 0.056 0.000 29.6 -0.5 25.2 -0.3
22 -2.24 0.054 0.000 33.8 -0.5 27.4 -0.3
23 -2.40 0.051 0.000 38.4 -0.6 29.8 -0.2
24 -2.56 0.048 0.000 43.3 -0.6 32.3 -0.2
25 -2.72 0.045 0.000 48.7 -0.6 34.9 -0.2
26 -2.88 0.042 0.000 54.5 -0.7 37.5 -0.1
27 -3.04 0.040 0.000 60.7 -0.7 40.3 -0.1
28 -3.20 0.037 0.000 67.4 -0.7 43.2 0.0
29 -3.36 0.034 0.000 74.5 -0.7 46.1 0.0
30 -3.52 0.032 0.000 82.2 -0.6 49.2 0.0
31 -3.68 0.029 0.000 90.3 -0.6 52.4 0.0
32 -3.84 0.027 0.000 98.9 -0.6 55.6 0.0
33 -4.00 0.024 0.000 108.1 -0.5 58.9 0.0
34 -4.15 0.022 0.000 117.2 -0.4 62.2 0.0
35 -4.30 0.020 0.000 126.7 -0.3 65.5 0.0
36 -4.32 0.020 0.000 128.0 -0.3 65.9 0.0
37 -4.48 0.018 0.000 138.7 -0.2 66.9 0.0
38 -4.64 0.016 0.000 149.3 -0.1 64.6 0.0
39 -4.80 0.014 0.000 159.2 -0.0 59.1 0.0
40 -4.96 0.012 0.000 168.0 0.0 50.4 0.0
41 -5.12 0.010 0.000 175.2 0.0 38.4 0.0
42 -5.28 0.009 0.000 180.1 0.0 23.1 0.0
43 -5.44 0.007 0.000 182.4 0.0 4.6 0.0
44 -5.60 0.006 0.000 182.1 0.0 0.2 -15.9
45 -5.76 0.005 0.000 177.9 0.0 0.2 -34.7
Run ID. faraa jan16 | Sheet No.
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------

Bending moment, shear force and displacement envelopes


Node Y Displacement Bending moment Shear force
no. coord maximum minimum maximum minimum maximum minimum
m m kN.m/m kN.m/m kN/m kN/m
46 -5.92 0.004 0.000 171.0 0.0 0.2 -49.7
47 -6.08 0.003 0.000 162.0 0.0 0.3 -61.4
48 -6.24 0.002 0.000 151.3 0.0 0.4 -70.3
49 -6.40 0.002 0.000 139.6 0.0 0.5 -76.4
50 -6.56 0.001 0.000 127.0 0.0 0.6 -79.7
51 -6.69 0.001 0.000 116.5 0.0 0.7 -80.5
52 -6.82 0.001 0.000 106.0 0.0 0.8 -80.1
53 -6.93 0.000 0.000 97.1 0.0 0.7 -81.4
54 -7.04 0.000 0.000 88.1 0.0 0.5 -81.2
55 -7.20 0.000 0.000 75.2 0.0 0.3 -78.6
56 -7.36 0.000 -0.000 63.0 0.0 0.1 -74.0
57 -7.52 0.000 -0.000 51.6 0.0 0.0 -68.0
58 -7.68 0.000 -0.000 41.2 0.0 0.0 -61.2
59 -7.84 0.000 -0.000 32.0 0.0 0.0 -53.9
60 -8.00 0.000 -0.000 23.9 0.0 0.0 -46.5
61 -8.16 0.000 -0.000 17.1 0.0 0.0 -39.4
62 -8.32 0.000 -0.000 11.4 0.0 0.0 -32.5
63 -8.48 0.000 -0.000 6.7 0.0 0.0 -26.2
64 -8.64 0.000 -0.000 3.0 0.0 0.0 -20.4
65 -8.80 0.000 -0.000 0.5 0.0 0.0 -15.3
66 -8.96 0.000 0.000 0.4 -1.9 0.0 -10.7
67 -9.12 0.000 0.000 0.4 -3.3 0.0 -6.9
68 -9.28 0.000 0.000 0.3 -4.1 0.0 -3.6
69 -9.44 0.000 0.000 0.3 -4.4 0.0 -0.9
70 -9.60 0.000 0.000 0.2 -4.4 1.1 -0.3
71 -9.76 0.000 0.000 0.2 -4.1 2.6 -0.3
72 -9.92 0.000 0.000 0.1 -3.6 3.7 -0.2
73 -10.08 0.000 0.000 0.1 -2.9 4.2 -0.2
74 -10.24 0.000 0.000 0.1 -2.2 4.4 -0.2
75 -10.40 0.000 0.000 0.0 -1.5 4.1 -0.1
76 -10.56 0.000 0.000 0.0 -0.9 3.5 -0.1
77 -10.72 0.000 0.000 0.0 -0.4 2.5 -0.1
78 -10.86 0.000 0.000 0.0 -0.1 1.4 -0.0
79 -11.00 0.000 0.000 0.0 -0.0 0.0 -0.0

Maximum and minimum bending moment and shear force at each stage
Stage --------- Bending moment -------- ---------- Shear force ----------
no. maximum elev. minimum elev. maximum elev. minimum elev.
kN.m/m kN.m/m kN/m kN/m
1 0.9 -7.52 -0.7 -3.20 0.8 -6.82 -0.4 -8.64
2 182.4 -5.44 -4.4 -9.44 66.9 -4.48 -81.4 -6.93

Maximum and minimum displacement at each stage


Stage -------- Displacement --------- Stage description
no. maximum elev. minimum elev. -----------------
m m
1 0.001 1.00 0.000 1.00 Apply surcharge no.1 at elev. 1.00
2 0.114 1.00 -0.000 -7.84 Excav. to elev. -4.30 on PASSIVE side
Licensed to S & H ENGINEERING | Sheet No.
Program: WALLAP Version 5.03 Revision A19.B32.R29 |
Licensed from GEOSOLVE | Job No.
Run ID. faraa jan16 | Made by :
Al Faraa Engineering | Date: 9-03-2017
Mar. 8th , 2017 | Checked :
-----------------------------------------------------------------------------
Units: kN,m
Date : Mar. 9th, 2017
Contractor: Al Faraa Engineering

CHECK OF STRESSES ON UNIVERSAL COLUMN

Summary:
 Universal Column Section = UC 305 x 305 x 97
 Cross Sectional Area (A) = 123.00 cm2
 Moment of Inertia (I) = 22250.00 cm4
 Section Modulus (Sx) = 1445.00 cm3
 Yeild Stress (fy) = 355.00 MPa
 Spacing of UC (s) = 1.30 m
 Maxumim Deflection (δmax) = 114 mm
 Maximum Moment per section (M) = 237.12 kNm/m
 Maximum Shear per section (Q) = 105.82 kN/m

Checks:
● MOMENT CALCULATIONS:

Allowable Flexural Stress (fb) = 213.00 MPa


Actual Flexural Stress (Fb) = 164.10 MPa

Is Fb < fb ? Yes. The section is SAFE

● SHEAR CALCULATIONS:

Allowable Shear Stress (fv) = 142.00 MPa


Actual Shear Stress (Fv) = 8.60 MPa

Is Fv < fv ? Yes. The section is SAFE

● DEFLECTION CHECK:

Maximum deflection = 11.4 cm


For temporary shoring systems, lateral movements are irrelevant for
structure stability.

You might also like