0% found this document useful (0 votes)
142 views

Format Excel Program PGJ V 1.2

The document contains survey data for a road project including elevation measurements at regular intervals along the road's path and details about the road's design specifications. Elevation measurements are provided for the natural ground levels on both sides of the road as well as the road surface. Additional information includes drainage elevations, superelevation rates, and widening at turns.

Uploaded by

NIDA ULHUSNA
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
142 views

Format Excel Program PGJ V 1.2

The document contains survey data for a road project including elevation measurements at regular intervals along the road's path and details about the road's design specifications. Elevation measurements are provided for the natural ground levels on both sides of the road as well as the road surface. Additional information includes drainage elevations, superelevation rates, and widening at turns.

Uploaded by

NIDA ULHUSNA
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 17

1 2 3 4 5 6 7 8

Elevasi Elevasi Elevasi Jalan


Elevasi Tanah Elevasi Tanah Tanah
Asli Kiri (m) Asli As (m) Kanan Asli Tanah
(m) Jalan (m) Tepi Kiri (m) As (m)

A 15+0 146.414 145.615 145.333 135.3 135.860 136


1 15+50 146.456 145.478 145.296 135.3 135.860 136
2 15+100 146.556 145.750 144.750 135.3 135.860 136
3 15+150 146.565 145.833 144.606 135.3 135.860 136
4 15+200 146.542 146.069 144.000 135.3 135.860 136
5 15+250 146.428 144.909 144.800 135.3 135.860 136
JR 15+275 146.052 144.247 144.000 135.3 135.860 136
6 15+300 144.500 143.750 143.154 135.3 135.860 136
TS 15+336 143.294 142.522 142.190 135.3 135.860 136
7 15+356 142.492 141.872 141.443 135.3 135.860 136
8 15+376 141.818 141.304 140.794 135.3 135.510 136
9 15+396 141.283 140.696 140.200 135.3 135.335 136
SC 15+416 140.762 140.182 139.750 135.3 135.160 136
10 15+436 140.082 140.174 139.332 135.3 135.160 136
11 15+456 142.492 139.760 141.443 135.3 135.160 136
CS 15+476 139.304 138.720 138.163 135.3 135.160 136
12 15+496 139.080 138.455 137.902 135.3 135.335 136
13 15+516 138.930 138.300 137.666 135.3 135.510 136
14 15+536 138.836 138.105 137.436 135.3 135.860 136
ST 15+556 138.757 138.054 137.238 135.3 135.860 136
PLV1 15+580 138.625 137.826 137.053 135.3 135.860 136
15 15+606 138.432 137.579 136.734 135.073 135.633 135.773
PPV1 15+620 138.231 137.436 136.632 134.845 135.405 135.545
PTV1 15+660 137.600 136.778 136.095 133.482 134.042 134.182
16 15+706 136.258 135.680 135.099 131.4368 131.997 132.13675
17 615+755 135.114 134.710 134.260 129.1643 129.724 129.86425
PLV2 15+800 134.404 134.158 132.750 127.118 127.678 127.818
PPV2 15+840 130.966 131.630 129.692 125.755 126.315 126.455
PTV2 15+880 129.800 129.143 128.615 125.3 125.860 126
18 15+906 126.800 126.667 125.938 125.3 125.860 126
awal 15+920 124.000 124.000 125.3 126
jembatan 124.000 125.860
19 15+956 119.126 119.286 119.160 125.3 125.860 126
20 16+006 121.675 121.000 120.000 125.3 125.860 126
21 16+056 126.680 126.485 125.800 125.3 125.860 126
akhir 16+060 126.747 126.125 125.3 126
jembatan 126.533 125.860
22 16+106 127.745 127.333 126.767 125.3 125.860 126
TS 16+152 128.667 127.787 127.130 125.3 125.860 126
23 16+172 128.808 127.818 127.107 125.3 126.035 126
24 16+192 128.855 127.727 127.091 125.3 126.210 126
25 16+212 128.888 127.714 127.008 125.3 126.385 126
26 16+232 128.693 127.714 126.838 125.3 126.560 126
27 16+252 128.222 127.368 126.557 125.3 126.385 126
28 16+272 127.813 127.000 126.235 125.3 126.210 126
29 16+292 127.420 126.625 125.294 125.3 126.035 126
ST 16+312 127.111 126.207 124.462 125.3 125.860 126
PLV3 16+340 126.320 124.308 122.857 125.3 125.860 126
PPV3 16+380 124.727 123.415 122.538 125.7 126.260 126.4
PTV3 16+420 124.667 123.600 123.167 126.9 127.460 127.6
PLV4 16+440 125.412 123.887 123.415 127.7 128.260 128.4
PPV4 16+480 125.926 124.929 124.111 128.9 129.460 129.6
PTV4 16+520 126.201 126.060 126.000 129.3 129.860 130
awal jalan eksisting 16+542 126.438 128.000 126.291 129.3 129.860 130
31 16+606 126.953 128.000 126.788 129.3 129.860 130
32 16+656 127.407 128.000 127.239 129.3 129.860 130
33 16+706 127.853 128.000 127.648 129.3 129.860 130
34 16+756 130.075 129.286 128.621 129.3 129.860 130
35 16+806 130.948 130.524 130.207 129.3 129.860 130
B 16+826 131.083 130.779 130.391 129.3 129.860 130
9 10 11 12 13 14 15
evasi Jalan Lajur Lajur
Elevasi Dasar Superelevasi Superelevasi Pelebaran Pendakian Pendakian
Tepi Kanan Drainase (m) Kiri Kanan Tikungan Kiri Kanan
(m)
135.860 133.718 -0.0200 -0.0200 0.000 0.000 0.000
135.860 133.584 -0.0200 -0.0200 0.000 0.000 0.000
135.860 133.449 -0.0200 -0.0200 0.000 0.000 0.000
135.860 133.315 -0.0200 -0.0200 0.000 0.000 3.500
135.860 133.449 -0.0200 -0.0200 0.000 0.000 3.500
135.860 133.584 -0.0200 -0.0200 0.000 0.000 3.500
135.860 133.718 -0.0200 -0.0200 0.000 0.000 0.000
135.860 133.852 -0.0200 -0.0200 0.000 0.000 0.000
135.860 133.718 -0.0200 -0.0200 0.000 0.000 0.000
136.035 133.554 -0.0200 0.0050 0.000 0.000 0.000
136.210 133.500 -0.0300 0.0300 0.000 0.000 0.000
136.385 133.447 -0.0550 0.0550 0.000 0.000 0.000
136.560 133.393 -0.0800 0.0800 0.000 0.000 0.000
136.560 133.339 -0.0800 0.0800 0.000 0.000 0.000
136.560 133.318 -0.0800 0.0800 0.000 0.000 0.000
136.560 133.371 -0.0800 0.0800 0.000 0.000 0.000
136.385 133.425 -0.0550 0.0550 0.000 0.000 0.000
136.210 133.479 -0.0300 0.0300 0.000 0.000 0.000
136.035 133.533 -0.0200 0.0050 0.000 0.000 0.000
135.860 133.586 -0.0200 -0.0200 0.000 0.000 0.000
135.860 133.651 -0.0200 -0.0200 0.000 0.000 0.000
135.633 133.424 -0.0200 -0.0200 0.000 0.000 0.000
135.405 133.196 -0.0200 -0.0200 0.000 0.000 0.000
134.042 131.833 -0.0200 -0.0200 0.000 0.000 0.000
131.997 129.788 -0.0200 -0.0200 0.000 0.000 0.000
129.724 127.515 -0.0200 -0.0200 0.000 0.000 0.000
127.678 125.469 -0.0200 -0.0200 0.000 0.000 0.000
126.315 124.106 -0.0200 -0.0200 0.000 0.000 0.000
125.860 123.651 -0.0200 -0.0200 0.000 0.000 0.000
125.860 123.584 -0.0200 -0.0200 0.000 0.000 0.000

123.543 -0.0200 -0.0200 0.000 0.000 0.000


125.860
125.860 0.000 -0.0200 -0.0200 0.000 0.000 0.000
125.860 0.000 -0.0200 -0.0200 0.000 0.000 0.000
125.860 0.000 -0.0200 -0.0200 0.000 0.000 0.000

123.730 -0.0200 -0.0200 0.000 0.000 0.000


125.860
125.860 123.744 -0.0200 -0.0200 0.000 0.000 0.000
125.860 123.865 -0.0200 -0.0200 0.000 0.000 0.000
125.860 123.991 0.0050 -0.0200 0.000 0.000 0.000
125.860 124.045 0.0300 -0.0300 0.000 0.000 0.000
125.615 123.843 0.0550 -0.0550 0.000 0.000 0.000
125.440 123.783 0.0800 -0.0800 0.000 0.000 0.000
125.615 123.730 0.0550 -0.0550 0.000 0.000 0.000
125.860 123.676 0.0300 -0.0300 0.000 0.000 0.000
125.860 123.622 0.0050 -0.0200 0.000 0.000 0.000
125.860 123.569 -0.0200 -0.0200 0.000 0.000 0.000
125.860 123.493 -0.0200 -0.0200 0.000 0.000 0.000
126.260 123.893 -0.0200 -0.0200 0.000 0.000 0.000
127.460 125.093 -0.0200 -0.0200 0.000 0.000 0.000
128.260 125.893 -0.0200 -0.0200 0.000 0.000 0.000
129.460 127.093 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.493 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.402 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.246 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.246 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.203 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.337 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.472 -0.0200 -0.0200 0.000 0.000 0.000
129.860 127.477 -0.0200 -0.0200 0.000 0.000 0.000
No Stationing El. Tanah El. Jalan E
1 0.0 89.22 88.0 -3.75%
2 20.0 89.33 87.3 -3.75%
3 40.0 89.67 86.5 -3.75%
4 60.0 89.67 85.8 -3.75%
5 80.0 89.00 85.0 -3.75%
6 100.0 88.00 84.3 -3.75% 98.00
96.00
7 120.0 85.33 83.5 -3.75% 94.00
8 140.0 82.67 82.8 -3.75% 92.00
90.00
9 160.0 80.00 82.0 0.00% 1 88.00
10 180.0 80.67 82.0 0.00% -400.0 86.00
11 200.0 81.33 82.0 0.00% 84.00

El eva s i
82.00
12 220.0 82.00 82.0 0.00% 80.00
13 240.0 82.80 82.0 0.00% 78.00
76.00
14 260.0 84.00 82.0 0.00%
74.00
15 280.0 85.00 82.0 0.00% 72.00
16 300.0 86.00 82.0 0.00% 70.00
68.00
17 320.0 86.43 82.0 0.00% 66.00
18 340.0 87.48 82.0 0.00% 0.0 50.0 100.0 150.0 200.0 250.0 300

19 360.0 89.25 82.0 0.00%


20 380.0 92.00 82.0 0.00%
21 400.0 96.00 82.0 0.00%
22 420.0 92.00 82.0 0.00% Tikungan 1 Langit Terowongan
23 440.0 90.00 82.0 0.00% 520 40 250
24 460.0 87.67 82.0 0.00% 520 120 550
25 476.4 86.00 82.0 0.00% TS 1 Tikungan 2 Rel Kereta
26 490.0 84.80 82.0 0.00% 1010 40 1464
27 500.0 84.00 82.0 0.00% 1010 120 1544
28 514.7 82.00 82.0 0.00% SC 1 / CS 1 Tikungan 3 Elevasi Existing
29 520.0 80.89 82.0 0.00% 1290 40 180
30 530.0 81.25 82.0 0.00% 1290 120 280
31 540.0 80.80 82.0 0.00% Existing
32 553.1 80.50 82.0 0.00% ST 1 230 40
33 560.0 79.75 82.0 -3.00% 2 230 120
34 580.0 79.55 81.4 -3.00% Rel Kereta
35 600.0 79.80 80.8 -3.00% 1504 40
36 620.0 80.00 80.2 -3.00% 1504 120
37 640.0 80.00 79.6 -3.00%
38 660.0 79.33 79.0 -3.00%
39 680.0 78.63 78.4 -3.00%
40 700.0 78.00 77.8 0.00% 3
41 720.0 76.00 77.8 0.00%
42 740.0 74.71 77.8 0.00%
43 760.0 74.00 77.8 0.00%
44 780.0 70.00 77.8 0.00%
45 800.0 68.00 77.8 0.00%
46 820.0 71.43 77.8 0.00%
47 840.0 74.13 77.8 0.00%
48 860.0 74.96 77.8 0.00%
49 880.0 76.00 77.8 0.00%
50 900.0 77.60 77.8 0.00%
51 920.0 78.00 77.8 0.00%
52 940.0 78.00 77.8 0.00%
53 948.5 79.50 77.8 0.00% TS 2
54 960.0 80.63 77.8 0.00%
55 970.0 80.25 77.8 0.00%
56 980.0 80.60 77.8 0.00%
57 990.0 81.50 77.8 0.00%
58 1000.0 82.38 77.8 0.00%
59 1010.0 82.59 77.8 0.00%
60 1021.5 82.17 77.8 0.00% SC 2
61 1030.0 82.00 77.8 0.00%
62 1040.0 82.00 77.8 0.00%
63 1050.0 82.00 77.8 0.00%
64 1060.0 82.00 77.8 0.00%
65 1077.6 82.00 77.8 0.00% CS 2
66 1080.0 82.00 77.8 0.00%
67 1090.0 82.00 77.8 0.00%
68 1100.0 82.00 77.8 0.00%
69 1110.0 82.00 77.8 0.00%
70 1120.0 82.44 77.8 0.00%
71 1130.0 82.82 77.8 0.00%
72 1140.0 83.18 77.8 0.00%
73 1150.6 84.00 77.8 0.00% ST 2
74 1160.0 82.29 77.8 0.00%
75 1180.0 81.80 77.8 0.00%
76 1190.3 78.10 77.8 0.00% TS 3
77 1200.0 78.40 77.8 0.00%
78 1210.0 78.67 77.8 0.00%
79 1220.0 78.83 77.8 0.00%
80 1230.0 79.00 77.8 0.00%
81 1240.0 78.85 77.8 0.00%
82 1250.0 80.00 77.8 0.00%
83 1263.3 80.50 77.8 0.00% SC 3
84 1280.0 81.00 77.8 0.00%
85 1290.0 81.43 77.8 0.00%
86 1300.0 82.00 77.8 0.00%
87 1310.0 82.00 77.8 0.00%
88 1320.0 83.00 77.8 0.00%
89 1330.0 83.40 77.8 0.00%
90 1345.5 82.82 77.8 0.00% CS 3
91 1360.0 83.25 77.8 0.00%
92 1370.0 83.00 77.8 0.00%
93 1380.0 82.67 77.8 0.00%
94 1390.0 83.00 77.8 0.00%
95 1400.0 82.56 77.8 0.00%
96 1418.5 83.50 77.8 0.00% ST 3
97 1440.0 82.89 77.8 0.00%
98 1460.0 84.00 77.8 0.00%
99 1480.0 84.67 77.8 0.00%
100 1500.0 85.50 77.8 0.00%
101 1520.0 86.00 77.8 0.00%
102 1540.0 86.44 77.8 0.00%
103 1560.0 86.50 77.8 3.00% 4
104 1580.0 86.20 78.4 3.00%
105 1600.0 84.44 79.0 3.00%
106 1620.0 85.60 79.6 3.00%
107 1640.0 84.00 80.2 3.00%
108 1660.0 83.54 80.8 3.00%
109 1680.0 82.46 81.4 3.00%
110 1700.0 83.43 82.0 3.00%
111 1720.0 85.56 82.6 3.00%
112 1735.3 88.00 83.1 3.00%
Alienmen Verti kal
Ta nah Jal an Ti kunga n Ke-1 Ti kungan Ke-2 Ti kungan Ke-3 La ngi
Jembata n Kol 1 Jembatan Kol 2 Exi sting Rel El evas i Rel El eva s

0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0 700.0 750.0 800.0 850.0 900.0 950.0 1000.0 1050.0 1100.0 1150.0 1200.
Sel ang

Langit Terowongan Jembatan Kol 1 Jembatan Kol 1


87.000 740 40.000 860 40.000
87.000 740 77.800 860 77.800
Rel Kereta
86.000
86.000
Elevasi Existing
82.000
82.000
Ti kungan Ke-3 La ngi t Terowonga n
El evas i Rel El eva s i Exi sting

00.0 1050.0 1100.0 1150.0 1200.0 1250.0 1300.0 1350.0 1400.0 1450.0 1500.0 1550.0 1600.0 1650.0 1700.0
Alienmen Vertikal 1
Kemiringan Sebelum (G1) -3.75 T1 3.68
Kemiringan Sesudah (G2) 0 T2 9.44
Stasioning PPV 30 + 160 a 2.268
Elevasi PPV 82 m 12
Kec. Rencana (VR ) 60
Waktu Tanggap (T) 2.5
Koef. Ges. Memanjang (fp) 0.4 D1 53.37519
±l -1 D2 157.4592
Jenis Lengkung Cekung D3 30
g 9.8 D4 104.9728

Cekung
Perbedaan Kem. (A) 3.750
Jarak Pandang Henti (Jh) 18.078
Lv(1) 6.687 No
Lv(2) -12.717 Yes

Cembung
Perbedaan Kem. (A) -
Jarak Pandang Henti (Jh) -
Jarak Mendahului (Jd) -
Lv(1) Jh - No
Lv(2) Jh - No
Lv(3) Jd - No
Lv(4) Jd - No

Lv Maksimal 0.000
Lv Maks Bulat 10.000 25
Ev 0.319

Stasioning PLV 1 30 126 30 +126


Stasioning PPV 1 30 160 30 +160
Stasioning PTV 1 30 194 30 +194
Alienmen Vertikal 1
Elevasi PLV 83.275
Elevasi PPV 82
Elevasi PTV 82

Tabel Kontrol Cekung


L 67.5
Grafik
L 55
Kenyamanan 40-80
68
Ev 0.31875
El. PPV 136 13.07602
El. Tengah 135.681
Y PLV 1.275

-0.06412
ST 81.936
Alienmen Vertikal 2
Kemiringan Sebelum (G1) 0 T1 3.68
Kemiringan Sesudah (G2) -3 T2 9.44
Stasioning PPV 30 + 560 a 2.268
Elevasi PPV 82 m 12
Kec. Rencana (VR ) 60
Waktu Tanggap (T) 2.5
Koef. Ges. Memanjang (fp) 0.4 D1 53.37519
±l 1 D2 157.4592
Jenis Lengkung Cembung D3 30
g 9.8 D4 104.9728

Cekung
Perbedaan Kem. (A) -
Jarak Pandang Henti (Jh) -
Lv(1) - Yes
Lv(2) - No

Cembung
Perbedaan Kem. (A) 3.000
Jarak Pandang Henti (Jh) 51.824
Jarak Mendahului (Jd) 345.807
Lv(1) Jh 20.193 No
Lv(2) Jh -29.353 Yes
Lv(3) Jd 427.081 No
Lv(4) Jd 411.614 Yes

Lv Maksimal 0.000
Lv Maks Bulat 10.000 20
Ev 0.150

Stasioning PLV 1 30 540 30 +540


Stasioning PPV 1 30 560 30 +560
Stasioning PTV 1 30 580 30 +580
Alienmen Vertikal 2
Elevasi PLV 82
Elevasi PPV 82
Elevasi PTV 81.4

Tabel Kontrol Cembung


L 33
Grafik
L 37
Kenyamanan 40-80
40
Ev -0.15
El. PPV 82
El. Tengah 82.15
Alienmen Vertikal 3
Kemiringan Sebelum (G1) -3 T1 3.68
Kemiringan Sesudah (G2) 0 T2 9.44
Stasioning PPV 30 + 700 a 2.268
Elevasi PPV 77.8 m 12
Kec. Rencana (VR ) 60
Waktu Tanggap (T) 2.5
Koef. Ges. Memanjang (fp) 0.4 D1 53.37519
±l -1 D2 157.4592
Jenis Lengkung Cekung D3 30
g 9.8 D4 104.9728

Cekung
Perbedaan Kem. (A) 3.000
Jarak Pandang Henti (Jh) 18.078
Lv(1) 5.350 No
Lv(2) -24.935 Yes

Cembung
Perbedaan Kem. (A) -
Jarak Pandang Henti (Jh) -
Jarak Mendahului (Jd) -
Lv(1) Jh - No
Lv(2) Jh - No
Lv(3) Jd - No
Lv(4) Jd - No

Lv Maksimal 0.000
Lv Maks Bulat 10.000 20
Ev 0.203

Stasioning PLV 1 30 673 30 +673


Stasioning PPV 1 30 700 30 +700
Stasioning PTV 1 30 727 30 +727
Alienmen Vertikal 3
Elevasi PLV 78.61
Elevasi PPV 77.8
Elevasi PTV 77.8

Tabel Kontrol Cekung


L 54
Grafik
L 35
Kenyamanan 40-80
54
Ev 0.2025
El. PPV 77.8
El. Tengah 77.598
Alienmen Vertikal 4
Kemiringan Sebelum (G1) 0 T1 3.68
Kemiringan Sesudah (G2) 3 T2 9.44
Stasioning PPV 31 + 560 a 2.268
Elevasi PPV 77.8 m 12
Kec. Rencana (VR ) 60
Waktu Tanggap (T) 2.5
Koef. Ges. Memanjang (fp) 0.4 D1 53.37519
±l 1 D2 157.4592
Jenis Lengkung Cekung D3 30
g 9.8 D4 104.9728

Cekung
Perbedaan Kem. (A) 3.000
Jarak Pandang Henti (Jh) 51.824
Lv(1) 26.734 Yes
Lv(2) 3.186 No

Cembung
Perbedaan Kem. (A) -
Jarak Pandang Henti (Jh) -
Jarak Mendahului (Jd) -
Lv(1) Jh - No
Lv(2) Jh - No
Lv(3) Jd - No
Lv(4) Jd - No

Lv Maksimal 26.734
Lv Maks Bulat 30.000 20
Ev 0.203

Stasioning PLV 1 30 1533 31 +533


Stasioning PPV 1 30 1560 31 +560
Stasioning PTV 1 30 1587 31 +587
Alienmen Vertikal 4
Elevasi PLV 77.8
Elevasi PPV 77.8
Elevasi PTV 78.61

Tabel Kontrol Cekung


L 54
Grafik
L 35
Kenyamanan 40-80
54
Ev 0.2025
El. PPV 77.8
El. Tengah 77.598