100% found this document useful (1 vote)
219 views2 pages

Progress Report Template Rev01

This document outlines the required sections and information for a progress report submitted to the Bureau of Agricultural Research (BAR) for projects funded through the Quick Response Fund System (QRF). The progress report must include basic information about the project such as title, proponents, location, funding, objectives addressed. It also requires a technical description of the rationale, objectives, methodology, results and management details. All information must follow BAR's standardized format to ensure consistent and complete reporting across funded projects.

Uploaded by

DA CVRC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
219 views2 pages

Progress Report Template Rev01

This document outlines the required sections and information for a progress report submitted to the Bureau of Agricultural Research (BAR) for projects funded through the Quick Response Fund System (QRF). The progress report must include basic information about the project such as title, proponents, location, funding, objectives addressed. It also requires a technical description of the rationale, objectives, methodology, results and management details. All information must follow BAR's standardized format to ensure consistent and complete reporting across funded projects.

Uploaded by

DA CVRC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Department of Agriculture

Bureau of Agricultural Research


RDMIC Bldg., Elliptical Rd. Cor. Visayas Ave., Diliman, Q.C. 1104
Phone Nos.: (632) 928-8624 & 928-8505  Fax: (632) 927-5691
Email: [email protected]  Website: http//www.bar.gov.ph

PROGRESS REPORT

A. BASIC INFORMATION

1. Project Title
2. Proponent (s)
3. Implementing Agency
3.1. Lead Agency
Head of Agency
Name of Proponent(s)
Contact Details
3.2. Collaborating Agency
4. Project Duration
4.1 Approved Duration (Y/M)
4.2 Actual Duration (Y/M)
4.3 Start Date of Implementation
5. Project Site(s)
5.1 Province
5.2 City/Municipality
5.3 Barangay
5.4 Geocode
6. Project Funding
6.1. Total Approved Budget
6.2. Total Amount Released
6.3. Agency Counterpart
6.4. Actual Expenses
6.5. Unliquidated Balance
7. RDE Agenda Addressed
8. Expected Technology or Information
9. Description of Technology/Information
10. Target Beneficiaries/Users
11. Tags/Keywords

B. TECHNICAL DESCRIPTION

1. Rationale
1.1. Problem Statement
1.2. PESTLE or SWOT
2. Narrative Summary
2.1. Potential Impact or Goal
2.2. Outcome or General Objective/Purpose
2.3. Expected Output or Specific Objectives
2.4. Scope and Limitations/Constraints
3. Review of Related Literature
3.1. Body Text
3.2. References
DOCUMENT NO.: BAR/QSF-B.01.05 REVISION DATE: 24 May 2016
REVISION NO.: 01 EFFECTIVITY DATE: 13 September 2005
4. Methodology per Objective
5. Results and Discussion per Objective
6. Summary of Findings
7. Appendices

C. PROJECT MANAGEMENT

1. Updated Work Plan Schedule


2. Monitoring and Evaluation Report
3. Recent Evaluation from BAR
4. Financial Status Report (BAR/QSF-B.01.05a)

DOCUMENT NO.: BAR/QSF-B.01.05 REVISION DATE: 24 May 2016


REVISION NO.: 01 EFFECTIVITY DATE: 13 September 2005

You might also like