Midc Form

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

2/8/2018 Single Window Clearance

[email protected] Log Out

Home | Manage Profile

Applicant Name: VIJAYMALA KADAM    Plot Number: 9   Industrial Area: Pune Infotech Park (Hinjewadi Phase -I,II,III)

Plot Details

  Application for sub-letting of Plot  


MIDC
MAHARASHTRA INDUSTRIAL DEVELOPEMENT CORPORATION
  (A Govermrnt of Maharashtra Undertaking)  

PROFORMA OF APPLICATION OF SUB-LETTING


    
   
    
I / We hereby apply for registering our request of  transfer for Industrial / Commercial purpose in MIDC  Pune Infotech Park
   
(Hinjewadi Phase -I,II,III)   Industrial Area.
    
  We hereby finish the naccessory information in respact of our industry, as under  
    
  1. Name(s) and address of the Licensee/s OR : VIJAYMALA KADAMPLOT NO.13, BHARATI  
Lessee/s in Block Letter.Surname first (State NAGAR,PPAUD ROAD, KOTHRUD, PUNE 411038
whether Shri/Smt/Kum)

2. Name of the firm / company : Asmita International & Infrastructure Pvt Ltd
a. Postal Address : PLOT NO 13, BHARTI NAGAR, PAUD ROAD, KOTHRUDH
b. Telephone Number : 25281809
c. E-Mail(ID) : [email protected]
d. Cell Number :
3. Plot No. : 9
  Area of Plot : 4820.00
Please indicate the nature of Licensee/s or
4. :
Lessee/s project/activity
5. Bulit up area as per BCC : sq. mtr.
Whether Licensee/s OR lessee/s is willing to : sq. mtr.
6. run to his/her/their/ its activity ? If yes, How
much build up area required, for own activity?
7.* Name of Sub-lettee : LUPIN LIMITED

a.* Postal Address : Kalpataru Inspire, 3rd Floor, Off


Western Express Highway, Santacruz
(East) MUMBAI Mumbai City MH 400055

b.* Telephone Number :


c. Cell No. :
d. E-Mail(ID) :

https://services.midcindia.org/Services/App_Pages/AddForm.aspx?AMId=3zADMAMwAzADMALQA0ADEAA%3d%3d 1/3
2/8/2018 Single Window Clearance

8  Constitution Type of Company : Proprietorship


9. Type of Activity Proposed  i.e Industrial OR :
Comercial (attach project report)

10. Proposed total persons to be employed    


  1)Supervisory :
  2) Skilled :
  3)Semi-Skilled :
11. Proposed Electric Load    
  1)Connected KW : kw
  2)Max demand KW : kw

12. Proposed water consumption (ltr./ per/day) : ltr/day

13. Are there any effluents in the process :


If Yes mention the treatment and disposal
plan?

14 Whether ancillary industry? : No


15 If Export Orianted Annual Turnover (in Lacs) :
16 Required built up area    
  Office : sq. mtr.
  Production : sq. mtr.
17* Period of sub-letting : 5 Years
18 Date of occupation : 01/03/2018
Whether open area required for any other : sq. mtr.
19 purpose,
If so, how much area?
      Save Draft   Save draft & Next

    
    
We further state that the particulars given above are true and correct to our knowledge and belief and that no material facts have been
  concealed  or withheld. We also state further that all nacessary statutary permissions / clearance / licences shall be obtained to carry out  
the activity of sublettee.
    
    
Palce : Signature of  the  Licensee/s OR Lessee/s
Status of applicant(s) as an Individual /
Date : Partner of a firm or director / Promoter of a company.
   
       
   
Signature of  the 
  Status of applicant(s) as an Individual /
Partner of a firm or director / Promoter of a company.
    
  Documents Required for Subletting Of the Premises  
  Sub-letting of the premises is permitted by the Corporation on payment of sub-letting charges, which are calculated on the basis of 3 %  
of prevailing premium rate per annum on occupied area for respective use. Sub-letting charges will be payable by allot tee in advance.
Sub-letting is allowed up to 10 years on payment of sub-letting Charges in advance .But after 3 years the difference in sub-letting
charges at prevailing rate are recoverable from the allotee per annum. The sub-letting permission is renewable. If sub-letting

https://services.midcindia.org/Services/App_Pages/AddForm.aspx?AMId=3zADMAMwAzADMALQA0ADEAA%3d%3d 2/3
2/8/2018 Single Window Clearance

charges/fees/compensation is not paid by the allot tee or allot tee refused to pay the sub-letting charges will be recovered from the
Occupier.
    
  Documents Required:-  
    
  a) Request from the original allot tee for subletting of premises.  
  b) Request from the sub-lettee/s and with their constitution of the firm.  
  c) Copy of Building Completion Certificate, (BCC) if applicable.  
  d) Total built-up area on the plot.  
      i) Individual sub-letted area/area proposed to be sub-let.  
    ii) Date of occupation of each of sub-lettee/s.   
     iii) Plan showing the area occupied/proposed to be sub-letted by each of the sub-lettee/s.  
    iv) If any open space is sub-letted or to be sub-letted or if any area occupied/proposed to be Occupied.    
  e) NOC from Financial Institutions, if the mortgage permission is granted.  
  f) Payment of Annual Lease Rent (up-to-dated)  
  g) Details of the sub-let tees project-  
     i) Power requirement.    
     ii) Water requirement  
     iii) Any pollution is expected from the process.  
  Activity which he/she/it/they undertake like:-  
  a) Industrial b) Commercial c) Residential  
    
  Note: -R.O./ A.M. will confirm from E.E./D.E. regarding Latest Water bill Paid.  
    

This site is best viewed with Internet Explorer 8.0 or higher at a minimum screen resolution of 1024x768

https://services.midcindia.org/Services/App_Pages/AddForm.aspx?AMId=3zADMAMwAzADMALQA0ADEAA%3d%3d 3/3

You might also like