Midc Form
Midc Form
Midc Form
Applicant Name: VIJAYMALA KADAM Plot Number: 9 Industrial Area: Pune Infotech Park (Hinjewadi Phase -I,II,III)
Plot Details
2. Name of the firm / company : Asmita International & Infrastructure Pvt Ltd
a. Postal Address : PLOT NO 13, BHARTI NAGAR, PAUD ROAD, KOTHRUDH
b. Telephone Number : 25281809
c. E-Mail(ID) : [email protected]
d. Cell Number :
3. Plot No. : 9
Area of Plot : 4820.00
Please indicate the nature of Licensee/s or
4. :
Lessee/s project/activity
5. Bulit up area as per BCC : sq. mtr.
Whether Licensee/s OR lessee/s is willing to : sq. mtr.
6. run to his/her/their/ its activity ? If yes, How
much build up area required, for own activity?
7.* Name of Sub-lettee : LUPIN LIMITED
https://services.midcindia.org/Services/App_Pages/AddForm.aspx?AMId=3zADMAMwAzADMALQA0ADEAA%3d%3d 1/3
2/8/2018 Single Window Clearance
We further state that the particulars given above are true and correct to our knowledge and belief and that no material facts have been
concealed or withheld. We also state further that all nacessary statutary permissions / clearance / licences shall be obtained to carry out
the activity of sublettee.
Palce : Signature of the Licensee/s OR Lessee/s
Status of applicant(s) as an Individual /
Date : Partner of a firm or director / Promoter of a company.
Signature of the
Status of applicant(s) as an Individual /
Partner of a firm or director / Promoter of a company.
Documents Required for Subletting Of the Premises
Sub-letting of the premises is permitted by the Corporation on payment of sub-letting charges, which are calculated on the basis of 3 %
of prevailing premium rate per annum on occupied area for respective use. Sub-letting charges will be payable by allot tee in advance.
Sub-letting is allowed up to 10 years on payment of sub-letting Charges in advance .But after 3 years the difference in sub-letting
charges at prevailing rate are recoverable from the allotee per annum. The sub-letting permission is renewable. If sub-letting
https://services.midcindia.org/Services/App_Pages/AddForm.aspx?AMId=3zADMAMwAzADMALQA0ADEAA%3d%3d 2/3
2/8/2018 Single Window Clearance
charges/fees/compensation is not paid by the allot tee or allot tee refused to pay the sub-letting charges will be recovered from the
Occupier.
Documents Required:-
a) Request from the original allot tee for subletting of premises.
b) Request from the sub-lettee/s and with their constitution of the firm.
c) Copy of Building Completion Certificate, (BCC) if applicable.
d) Total built-up area on the plot.
i) Individual sub-letted area/area proposed to be sub-let.
ii) Date of occupation of each of sub-lettee/s.
iii) Plan showing the area occupied/proposed to be sub-letted by each of the sub-lettee/s.
iv) If any open space is sub-letted or to be sub-letted or if any area occupied/proposed to be Occupied.
e) NOC from Financial Institutions, if the mortgage permission is granted.
f) Payment of Annual Lease Rent (up-to-dated)
g) Details of the sub-let tees project-
i) Power requirement.
ii) Water requirement
iii) Any pollution is expected from the process.
Activity which he/she/it/they undertake like:-
a) Industrial b) Commercial c) Residential
Note: -R.O./ A.M. will confirm from E.E./D.E. regarding Latest Water bill Paid.
This site is best viewed with Internet Explorer 8.0 or higher at a minimum screen resolution of 1024x768
https://services.midcindia.org/Services/App_Pages/AddForm.aspx?AMId=3zADMAMwAzADMALQA0ADEAA%3d%3d 3/3