Location SHOWROOM SF B-1 SAA 15-Mar-19 3
CONTINUOUS BEAM ANALYSIS & DESIGN to EC2 (DD ENV 1992-1-1 : 1992) Checked Revision Job No
Originated from RCCe41.xls on CD © 1999 BCA for RCC MHM - B-2

SPAN 1 LEFT CENTRE RIGHT


ACTIONS M kNm 453.3 682.0 453.3
d 0.90 1.10 0.90
DESIGN d mm 615.3 640.3 615.3
As mm² 2335 3205 2335
As' mm² 0 4267 0
TOP STEEL Layer 1 5 R 25 7 R 25 5 R 25
Layer 2 0 19 2 R 25 0 19
As prov mm² 2454 As' prov 4418 As prov 2454
BTM STEEL Layer 1 4 R 19 7 R 25 4 R 19
Layer 2 0 19 0 19 0 19
As' prov mm² 1134 As prov 3436 As' prov 1134
DEFLECTION L/d 15.70 Allowed 21.26 ..
SHEAR Vsd kN 473.0 LINK Ø 473.0
VRd1 kN 111.9 10 111.9
VRd2 kN 996.8 NOMINAL 996.8
s req mm 69 235 69
LINKS R10 @ 65 for 3510 R10 @ 225 R10 @ 65 for 3510
legs No 2 2 2

CHECKS % As ok ok ok
Cover ok ok ok
min S ok ok ok
max S ok ok ok
Links ok ok ok
Main bars ok ok ok
max V ok ok
Deflection ok