Page 1 of 2
1004(2)a Finishing Hardware (Locksets) set 16.00 4,331.34 69,301.44 - 16.00 - - 69,301.44
1004(2)g Finishing Hardware (Hinges) set 12.00 3,377.54 40,530.48 - 12.00 - - 40,530.48
1003(9) Carpentry & Joinery Works (Chalk Board) l.s. 1.00 88,937.10 88,937.10 - 1.00 - - 88,937.10
1021(1)c Cement Floor Finish (With Floor) sq.m. 584.99 297.17 173,841.48 584.99 584.99 - 173,841.48 173,841.48 -
1027(1) Cement Plaster Finish sq.m. 2,313.80 172.00 397,973.60 1,619.66 1,619.66 694.14 278,581.52 278,581.52 119,392.08
1051(1) Railing m. 74.10 368.40 27,298.44 - 74.10 - - 27,298.44
1038(1) Reflective Insulation sq.m. 316.61 628.81 199,087.53 - 316.61 - - 199,087.53
1018(1) Glazed Tiles & Trims sq.m. 71.55 1,155.91 82,705.36 - 71.55 - - 82,705.36
1018(2) Unglazed Tiles sq.m. 251.60 466.26 117,311.02 - 251.60 - - 117,311.02
1018(3) Granite Tiles sq.m. 378.00 413.29 156,223.62 - 378.00 - - 156,223.62
1003(1)a1 Ceiling sq.m. 325.88 494.38 161,108.55 - 325.88 - - 161,108.55
1032(1)a Painting Works (Masonry/Concrete) sq.m. 2,553.90 116.65 297,912.44 - 2,553.90 - - 297,912.44
1032(1)b Painting Works (Wood) sq.m. 133.27 303.13 40,398.14 - 133.27 - - 40,398.14
1032(1)c Painting Works (Steel) sq.m. 62.73 2,310.04 144,908.81 - 62.73 - - 144,908.81
1014(1)b1 Prepainted Metal Sheets, 0.5mm, Long Span sq.m. 316.61 479.08 151,681.52 316.61 316.61 - 151,681.52 151,681.52 -
1047(8) Structural Steel (Roof Framing) kgs. 9,442.70 109.11 1,030,293.00 9,442.70 9,442.70 - 1,030,293.00 1,030,293.00 -
1047(1) Metal Structure, Fire Scape l.s. 1.00 116,626.10 116,626.10 - 1.00 - - 116,626.10
1001(8) Sewer Line Works l.s. 1.00 74,690.41 74,690.41 - 1.00 - - 74,690.41
1001(9) Storm Drainage/Down Spout l.s. 1.00 92,925.50 92,925.50 - 1.00 - - 92,925.50
1002(28) Cold Water Lines l.s. 1.00 54,657.24 54,657.24 0.30 0.30 0.70 16,397.17 16,397.17 38,260.07
1001(6) Catch Basin, CHB/Septik Tank each 14.00 2,968.93 41,565.02 - 14.00 - - 41,565.02
1002(8) Plumbing Fixtures l.s. 1.00 120,057.90 120,057.90 - 1.00 - - 120,057.90
Part D Electrical - - - - - -
1100(30) Conduit, Boxes & Fittings l.s. 1.00 164,666.50 164,666.50 0.50 0.50 0.50 82,333.25 82,333.25 82,333.25
1101(42) Wires and Wiring Devices l.s. 1.00 22,299.35 22,299.35 0.50 0.50 0.50 11,149.68 11,149.68 11,149.68
1102(27) Power Load Center, Switch Gear & Panel Board l.s. 1.00 70,772.63 70,772.63 - 1.00 - - 70,772.63
1103(1) Lighting Fixtures l.s. 1.00 147,961.17 147,961.17 - 1.00 - - 147,961.17
1208 Fire Alarm System l.s. 1.00 27,047.41 27,047.41 - 1.00 - - 27,047.41
1003(17) Carpentry and Joinery, Furniture l.s. 1.00 74,298.99 74,298.99 - 1.00 - - 74,298.99
13,506,764.08 TOTAL: 4,203,886.28 7,362,540.12 6,144,223.98