Work Breakdown Structure
Work Breakdown Structure
• Geography
• Major deliverables
• Life cycle phases
• Subprojects
The WBS should have a method of identifying the hierarchy, such as a numeric structure. The WBS can be
shown as a hierarchical chart or as an outline. The approved WBS, its corresponding WBS Dictionary, and the
Project Scope Statement comprise the scope baseline for the project.
Use the information from your project to tailor the WBS to best meet your needs.
It is related to:
• WBS Dictionary
• Scope Baseline
• Activity List
• Activity Cost Estimates
• Project Budget
• Risk Register
• Accepted Deliverables
The Work Breakdown Structure is an output from the process 5.4 Create WBS in the PMBOK® Guide—Fifth
Edition.
You can use the element descriptions in Table 2.9 to assist you in developing a Work Breakdown Structure.