D.L of Superstructure: Input Only in Blue Cells
D.L of Superstructure: Input Only in Blue Cells
D.L of Superstructure: Input Only in Blue Cells
L of superstructure
Total Length of Girder = 26 m Input only in Blue cells
Total width = 11 m
Total depth of girder = 1.65 m
Depth of deck slab = 0.225 m
No of girders = 3
Width of girder = 0.9 m
Width of diaphraghm = 1.8 m
Length of diaphragm = 7.5 m
Depth of diaphraghm = 1.65 m
Density of concrete = 25 kN/m3
D.L of slab = 1608.750 kN 2.475 Abutment
D.L of girder = 2500.875 kN 3.8475 A 9.24
D.L of diaphragm = 556.875 kN 2.97 45.6533
Total D.L of superstructure = 4666.500 kN 9.2925
SIDL of superstructure
Density of w.c = 22 kN/m3
Thickness of w.c = 0.065 m
SIDL of w.c = 408.98 kN
Weight of crash barrier = 7.5 kN/m
SIDL of w.c = 195 kN
Weight of handrails = 3.5 kN/m
SIDL of handrails 91 kN
D.L of substructure
Total Height of pier pedestal = 0.385 m
Depth of pier cap/diaphragm = 0 m 0.5153
Height of pier (excluding cap) = 0.385 m 2.54469
Width of pier cap = 1.8 m
Straight length of pier cap = 7.5 m
Diameter of pier = 1.8 m
D.L of pier and pier cap = 129.938 kN
Width = 4 m
Depth = 1.8 m
Length = 6.5 m
D.L = 1170 kN
D.L of Pile
Pmax=
P/N+ML *(x/IL)
+MT*(y/IT) = 1272.072 kN/m2
P = 7197.566 kN (kN/M2)
Pmin=
P/N-ML *(x/IL)-
MT*(y/IT)
(kN/M2) = 1127.117 kN/m2
P/A -ML/ZL-
MT/ZT
(kN/M2)
ML = 4622.333 kNm
MT = 1005.51 kNm
Txx 6.25
IYY 37.5