0% found this document useful (0 votes)
39 views4 pages

Soil Mechanics Lab - Daily Report 07.02.2019

The daily report from the Soil Mechanics Laboratory at V.S.B. College of Engineering summarizes: 1) The lab incharge's activities for the day including invigilating an exam and teaching classes. 2) The status, installation date, and warranty information for various equipment and items in the lab. 3) That the lab and equipment were cleaned during the morning and that no equipment required service or repairs.

Uploaded by

senthil kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
0% found this document useful (0 votes)
39 views4 pages

Soil Mechanics Lab - Daily Report 07.02.2019

The daily report from the Soil Mechanics Laboratory at V.S.B. College of Engineering summarizes: 1) The lab incharge's activities for the day including invigilating an exam and teaching classes. 2) The status, installation date, and warranty information for various equipment and items in the lab. 3) That the lab and equipment were cleaned during the morning and that no equipment required service or repairs.

Uploaded by

senthil kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
You are on page 1/ 4

V.S.B.

COLLEGE OF ENGINEERING TECHNICAL CAMPUS


COIMBATORE – 642 109

Lab Incharge Daily Report on 07.02.2019

Name of the Lab: Soil Mechanics Laboratory (Civil – L1) Name of the Lab Incharge :Mr. Shankar L
Name of the Lab Technicians :Mr.Santhosh Gowtham

Specific Activities:
 Was working as Exam Invigilator for Hall no A 206 during first period.
 Was handling Principles of Management for IV year during fifth and ninth period.
 Was updating Course files and ISO files.

Date of Date of next


Status
Name of Equipment / Date of Warranty service / service /
(working /
Item Installation validity repair / repair /
not working)
calibration calibration
Direct shear apparatus(1
Working 21.07.2014 - - -
No)
Three gang consolidation
Working 21.07.2014 - - -
test device(1 No)
Liquid limit device with
Working 12.08.2014 - - -
counter(2 Nos)
Plastic limit apparatus(2
Working 12.08.2014 - - -
Nos)
Shrinkage limit
Working 12.08.2014 - - -
apparatus(3 Nos)

1
Test sieves 20 cm diameter.
Brass frame (size : 75µ) (1 Working 12.08.2014 - - -
No)
Test sieves 20 cm diameter.
Working 12.08.2014 - - -
(Lid & Pan) (2 Nos)
Test sieves 20 cm diameter.
Brass frame (size : 150µ) Working 12.08.2014 - - -
(2 Nos)
Test sieves 20 cm diameter.
Brass frame (size : 300µ) Working 12.08.2014 - - -
(2 Nos)
Test sieves 20 cm diameter.
Brass frame (size : 425µ) Working 12.08.2014 - - -
(1 No)
Test sieves 20 cm diameter.
Brass frame (size : 1.18 Working 12.08.2014 - - -
mm) (1 No)
Soil Hydrometer(2 Nos) Working 12.08.2014 - - -

Thermometer(1 No) Working 12.08.2014 - - -


Field density apparatus
(Sand pouring cylinder- Working 12.08.2014 - - -
small) (2 Nos)
Soil density apparatus
(Core cutter method) (2 Working 12.08.2014 - - -
Nos)
Triaxial shear test
Working 03.09.2014 - - -
apparatus(1 No)
Test sieves 20 cm diameter
Working 16.09.2014 - - -
brass frame(11 Nos)
Sieve shaker (Motorized)
Working 16.09.2014 - - -
(1 No)
Proctor compaction mould
Working 16.09.2014 - - -
(light) (2 Nos)
2
1. Laboratory Handling Status:

Period Name of the Name of the Name of the faculty Name of the Experiment
Laboratory Year-Department- member
Semester

I
II
- - - -
III
IV
V
VI - - - -
VII
VIII
- - - -
IX

2. Students Attendance Details :

Year-Department- No. of Students No. of Students


S.No. Total Strength
Semester Present Absent
- - - - -
3. Absentees List:
Year-
S.No. Department- Register No. Name of the Student
Semester
- - - -

4. Equipments Cleaning Status:


Time Remarks

3
Cleaned
10.00 AM – 10.15 AM

5. Sweeping Status:
Sweeper’s Name Time Remarks

Gowrama 10.45 AM – 11.00 AM Cleaned


6. Breakage Components Status:

Students
Breakage Components Individual/Common Year Department Semester
S. No. Register No. & Name
Nil - - - - -

7. Equipments Service Status:

S. No. Equipment Name Supplier Name Dispatched Date Return Date Status Remarks

Nil - - - - -

Mr.Shankar.L
Assistant Professor,
Lab Incharge,
Department of Civil Engineering.

You might also like