0% found this document useful (0 votes)
36 views3 pages

Simulation of Delay Time": Assignment On

The document is a group assignment submitted to their professor at the University of Dhaka analyzing the simulation of delay time for a factory construction model in Bangladesh. The problem asks the group to build 100 factories within 1 year but then the number increases to 150 factories, so they must determine the expected delay. They provide the formula and solution to calculate the delay time based on factors like the number of factories under construction, completion time, starting and completion rates as more factories are added to the project.

Uploaded by

kamalhossen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views3 pages

Simulation of Delay Time": Assignment On

The document is a group assignment submitted to their professor at the University of Dhaka analyzing the simulation of delay time for a factory construction model in Bangladesh. The problem asks the group to build 100 factories within 1 year but then the number increases to 150 factories, so they must determine the expected delay. They provide the formula and solution to calculate the delay time based on factors like the number of factories under construction, completion time, starting and completion rates as more factories are added to the project.

Uploaded by

kamalhossen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Assignment

On
“Simulation of Delay time”
Submitted To:

Dr. Md. Abdul Hannan Mia

Professor,
Department of MIS
University of Dhaka

Submitted By: Group- “Dynamics”

Kamal Hossen (ID: 09-096)


Md. Zahidul Islam (ID: 09-030)
Md. Ashikul Islam (ID: 09-072)
Mohammad Rofiqul Islam (ID: 09-126)
Batch-9th, Section B

MBA Program

Department of MIS

University of Dhaka

Date of Submission: 3rd February, 2019


Problem: Factory construction model (Bangladeshi perspectives)

The problem suggests that we have to build 100 factories within the time of 1 year. So, the desired
number of factories are 100 and completion time is one year or 12 months. At first, the company
did not expect delays but then they were assigned to build 150 factories. So, they are expecting
delays in the process. We have to find out the response of the factory model as the number of
factories increase.

Formula and Solution:

Factories under Construction = T

Delay Time = DT

Completion Time (CT) = 1year (12 months)

Initial factories under construction = INT = 0

Factories under Construction (T) = Factories under Construction (T - DT) + (Starting Rate -
Completion Rate) * DT

Inflows:

Starting Rate = Difference/Starting time


Outflows:

Completion rate = factories under construction/completion time (CT)

Total number of factories = total number of factories (T – DT) + completion rate * DT

Initial total number of factories = 100

After 50 extra factories are assigned to construct

Inflows:

Completion rate = Factories under construction/Completion time

Completion time = 4

Desired factories = 100+50 units

Difference = desired number of factories - Total number of factories

Outcome = the difference between desired number of factories and total number of factories after
the completion time is the expected delay time.