Problem # (16) : Solved Problems in Foundation Engineering
Problem # (16) : Solved Problems in Foundation Engineering
Problem # (16)
A rectangular footing is acted by a vertical load of 8060 kN and two horizontal forces of
1500 kN in both the long and the short directions with a distance of 0.6 m from the ground surface.
Determine:
1. The base pressure at the four corners if the footing was on soil.
2. Pile loads at the four corners if the footing was on piles whose pattern as shown.
Solution:
8060 KN
soil 20 kN / m
3
0.5 m
2*2 m pedestal
conc 24 kN / m
3
Hp = 1500 KN
1.4 m 1 m
7m
0.5 m
B A
1m 1m 1m 1m
Hp = 1500 KN
5m
0.5 m D 1m 1m 1m 1m 1m 1m C 0.5 m
0.5 m
Hs = 1500 KN
68
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
q max
Q 1 6eL
6eB
min A L B
1500 3
eL eB 0 . 45 m
10 , 000
10 , 000 6 0 . 45 6 0 . 45
q max 1
min 57 7 5
Q max 285 . 7 111 . 4 154 . 3
min
Q
Q
M yx
M xy
n Iy Ix
e L e B 0 . 45 m
e Q M L M B
4500 KN / m
69
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
Problem # (17)
For the group of friction piles shown; determine the settlement of the clay layers.
T o ta l Q = 3 6 0 0 K N
4 .0 m
1 .2
F r ic tio n p ile s
I n c o m r e s s ib le
2 .8 m
2 /3 D f = 8 .0 m
1 .2
0 .4
m v = 0 .0 0 0 1 K N
1 .2 1 .2 1 .2
1 2 p ile s g r o u p
17 m SO FT C LAY
Q 1 = 3 6 0 0 /( 4 * 2 .8 ) = 3 2 1 .4 K N /m 2
1 /3 D f = 4 .0 m
1 .5
Q 2 = 1 3 8 .5 K N /m 2 A1
30
1 .5
Q 3 = 7 7 .0 K N /m 2 A2
I n c o m p r e s s ib le
I n c o m r e s s ib le
A d d e d v e r tic a l s tr e s s w h ic h c u a s e s e ttle m e n t
3 .0
Q 3 = 3 3 .9 K N /m 2 A3
5 .0 m
A4
3 .0
Q 3 = 1 9 .0 K N /m 2
Solution:
S P H mv AL mv
A = Pressure area
S is the settlement of the clay layer
A1 = 0.5× (321.4 + 138.5) × 1.5 = 345 kN/m.
A2 = 0.5× (138.5 + 77.0) × 1.5 = 162 kN/m.
A3 = 0.5× (77.0 + 33.9) × 3.0 = 166 kN/m.
A4 = 0.5× (33.9 + 19) × 3.0 = 79 kN/m.
S1 = 345×0.0001 = 0.0345 m
S2 = 162×0.0001 = 0.0162 m
S3 = 166×0.0001 = 0.0166 m
S4 = 79×0.0001 = 0.0079 m
Total Settlement = 0.0752 m = 75.2 mm
Note that almost the half of the settlement of the pile group is due to compression of the upper 1.50
thick layer.
6:
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
Problem # (18)
Determine the settlement of the group of point bearing piles shown.
T o ta l Q = 3 6 0 0 K N
E n d B e a r in g P ile s
SO FT C LAY
4 .0 m
D f = 8 .0 m
0 .4 m
m v = 0 .0 0 0 1 K N
1 .2
2 .8 m
1 .2
1 .2 1 .2 1 .2
1 2 p ile s g r o u p
0
3 .0
30 Q 1 = 7 7 .0 k N /m 2
3 .0
Q 2 = 3 3 .9 k N /m 2
6 .0
CLAY
3 .0
Q 3 = 1 9 .0 K N /m 2
Solution:
S P H mv AL mv
A = Pressure area
S is the settlement of the clay layer
Note; Q is used instead of P in the following equations
3600
Q1 77 . 0 kN / m
2
( 4 2 3 tan 30 ) ( 2 . 8 2 3 tan 30 )
3600
Q2 33 . 9 kN / m
2
( 4 2 6 tan 30 ) ( 2 . 8 2 6 tan 30 )
3600
Q3 19 kN / m
2
( 4 2 9 tan 30 ) ( 2 . 8 2 9 tan 30 )
1
S1 ( 77 . 0 33 . 9 ) 3 . 0 0 . 0001 0 . 0166 m
2
1
S2 ( 33 . 9 19 . 0 ) 3 . 0 0 . 0001 0 . 0079 m
2
Total Settlement S = 0.0166 + 0.0079 = 0.0245 m = 24.5 mm
6;
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
Problem # (19)
A reinforced concrete circular pile is driven to the soil as shown below. Calculate the
negative skin friction force acting on the pile.
17 KN / m
3
4 .0 m
N e w s a n d fill ( 1 )
35
o
18 KN / m
3
4 .0 m
C o m p r e s s ib le c la y la y e r ( 2 )
q u 30 KN / m
2
4 .0 m
C o m p r e s s ib le c la y la y e r ( 2 ) R ock
0 .5 m
R ock
0 .5 m
Solution:
K o 1 sin 0 . 43
2
3
tan 0 . 467 R e s u lta n t o f la te r a l
4 .0 m
e a r th p r e s s u r e a t r e s t
qu
Cu 15 KN / m
2
2 1
Po 4 29 . 24 58 . 48 KN / m
2
4 17 0 . 43 29 . 24 KN / m
2
F 1 P o D
F 1 58 . 48 0 . 467 0 . 5 43 KN
F 2 Dh Cu
F 2 0 . 5 4 15 94 . 3 KN
75
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
Problem # (20)
A pile supported foundation is given below. A vertical force of 1200 kN (including all the
loads on foundation) is acting downward at point K.
Determine the loads carried by piles A, B and C.
A x is o f S y m m e tr y
B
3 .4 6 4 m
2 .0 7 m
K
X X
c .g
0 .6 9 m
1 .5 m
A
C
Ө Ө
2 .4 m
0 .4 6 m
4 .0 m
P ile C a p
Solution:
3 . 464
tan 60
o
2
x
tan 30 x 0 . 46 m .
0
tan
2 0 .8
Eccentrici ty :
e 1 . 5 ( 0 . 69 0 . 46 ) 0 . 35 m
Moment :
M 1200 0 . 35 420 KN . m
75
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
Problem # (21)
One of the exterior columns of a steel frame structure is acted by a vertical force of 10,000
kN, a horizontal force of 2000 kN and a moment of 5000 kN.m. Due to a poor foundation soil; it was
decided to support that column by a pile foundation consisting of a twelve pile group. Piles are
concrete filled steel pipe piles. Allowable axial compressive load on each pile is 2000 kN. It is also
predicted that each pile can also resist a horizontal force of 60 kN. Passive resistance of soil will not
be considered.
Is the selected pile group satisfactory?
5 0 0 0 K N .m
2000 K N
10000 K N
1 .5 * 1 .5 m p e d e s ta l
5 .5 * 7 .5 m P ile c a p
3 3
1 1
V e r tic a l P ile s
0 .7 5
2
5 .5 m
2
0 .7 5
0 .7 5 2 2 2 0 .7 5
7 .5 m
Solution:
Column load = 10,000 kN
Weight of pedestal = 1.5 ×1.5 ×2 ×24 = 108 kN
Weight of pile cap = 5.5 ×7.5 ×2 ×24 = 1,980 kN
Weight of soil = (5.5 ×7.5 – 1.5 ×1.5) ×2 ×20 = 1,560 kN
75
PROF. MOHAMMED AWAD
SOLVED PROBLEMS IN FOUNDATION ENGINEERING
I 1 1 2 3 (1 3 ) 60 pile . m
2 2 2
Qn
Q
M
Xn 1
n I1 1
13648 13000
Qn X n 1137 217 X n A B C D
12 60
Then;
QA = 1137 -217×3 = 486 kN/pile
QB = 1137 -217×1 = 920 kN/pile
QC = 1137 +217×1 = 1354 kN/pile
QD = 1137 +217×3 = 1788 kN/pile
2 m 1 m 1 m 2 m
486 1788
Unbalanced horizontal force = 2000 3 3 698 KN
3 3
698
Now; 58 kN / pile 60 O . K .
12
Q 13648 KN
3 Q B 2760
3 Q A 1548
Q 2000
75
PROF. MOHAMMED AWAD