Oil and Gas Regulatory Authority: Notification

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

OIL AND GAS REGULATORY AUTHORITY

************
Islamabad, the 1st March, 2012

NOTIFICATION

S.R.O. (I)/2012.- In exercise of powers conferred by sub-section (3) of section 8 of Oil and Gas
Regulatory Authority Ordinance, 2002 (XVII of 2002) and in super-session of Oil and Gas Regulatory
Authority's Notification No. S.R.O.982(I)/2011, dated the 19th October, 2011, the Authority is pleased to notify
the following Prescribed Prices for the purposes of the said Ordinance, in respect of Sui Northern Gas
Pipelines Limited:
W.e.f W.e.f W.e.f
01.07.2011 07.08.2011 01.01.2012
Rupees per MMBTU
(i) Domestic Sector
a) Standalone meters
(i) upto 100 M3 per month 95.00 107.87 122.95
(ii) Over 100 – upto 300 M 3 per month 190.00 215.74 245.89
(iii) Over 300 – upto 500 M 3 per month 800.00 908.39 1,035.34
(iv) All over 500 M3 per month 1,006.40 1,142.75 1,302.46
b) Mosques, churches, temples, madrassas, other Religious Places and Hostels attached thereto; Government
and Semi-Government Offices and Hospitals, Government Guest Houses, Armed Forces Messes, Langars,
Universities, Colleges, Schools and Private Educational Institutions, Orphanages and other Charitable
Institutions along-with Hostels and Residential Colonies to whom gas is supplied through bulk meters.

(a) Upto 300 M 3 per month


(i) Upto 100 M3 per month 95.00 107.87 122.95
(ii) Over 100 – upto 300 M 3 per month 190.00 215.74 245.89
(b) Over 300 M 3 per month
All off-takes at flate rate of 383.42 397.62 496.21

(ii) Commercial :
All establishments registered as commercial units with local authorities or dealing in consumer items for direct commercial
sale like cafes, bakries, milk shops, tea stalls, canteens, barber shops, laundries, places of entertainment like cinemas, clubs,
theaters and private offices, clinics, maternity homes, etc.

All off-takes at flat rate of 463.76 480.39 600.19

(iii) Special Commercial (Roti Tandoors):

(a) Upto 300 M 3 per month


(i) Upto 100 M3 per month 95.00 107.87 122.95
(ii) Over 100 – upto 300 M 3 per month 190.00 215.74 245.89
(b) Over 300 M 3 per month
All off-takes at flate rate of 463.76 480.39 600.19

(iv) Ice Factories:


All off-takes at flat rate of 463.76 480.39 600.19

(v) Industrial Consumers:


All consumers engaged in the processing of industrial raw material into value added finished products irrespective of the
volume of gas consumed including hotel industry but excluding such industries for which a separate rate has been
prescribed.

All off-takes at flate rate of 382.37 396.53 494.86


(vi) Compressed Natural Gas (CNG) Stations:
All off-takes at flate rate of 503.64 522.29 651.80

(vii) Cement Factories:


All off-takes at flate rate of 536.42 556.28 694.22

(viii) Fertilizer Factories:

(1) Pak American Fertilizer Company Limited, Daudkhel.

(a) For gas used as feed stock for fertilizer

All off-takes at flat rate of 102.01 102.01 116.27

(b) For gas used as fuel for generation of electricity, steam and for usage of housing colonies.

All off-takes at flate rate of 382.37 396.53 494.86

(2) Pak Arab Fertilizer Limited, Multan.

(a) For gas used as feed stock for fertilizer

All off-takes at flat rate of 102.01 102.01 116.27

(b) For gas used as fuel for generation of electricity, steam and for usage of housing colonies.

All off-takes at flate rate of 382.37 396.53 494.86

(3) Dawood Hercules Chemicals Limited, Chichoki Malian, Sheikhupura District.

(a) For gas used as feed stock for fertilizer.

All off-takes at flate rate of 102.01 102.01 116.27

(b) For gas used as fuel for generation of electricity, steam and for usage of housing colonies.

All off-takes at flate rate of 382.37 396.53 494.86

(4) Pak-China Fertilizer Limited/Hazara Phosphate Plant Limited, Haripur.

(a) For gas used as feed stock for fertilizer.

All off-takes at flate rate of 102.01 102.01 116.27

(b) For gas used as fuel for generation of electricity, steam and for usage of housing colonies.

All off-takes at flate rate of 382.37 396.53 494.86

(5) ENGRO Fertilizer Company Limited

(a) For gas used as feed stock for fertilizer

All off-takes at provisional flate rate of 59.29 59.59 60.67

(b) For gas used as fuel for generation of electricity, steam and for usage of housing colonies.

All off-takes at flate rate of 382.37 396.53 494.86


(ix) Power Stations:

(a) WAPDA's Power Stations and other electricity utility companies excluding WAPDA's Natural Gas
Turbine Power Station, Nishatabad, Faisalabad.
All off-takes at flate rate of 393.79 408.37 480.86

(b) WAPDA's Natural Gas Turbine Power Station, Nishatabad, Faisalabad.

Commodity Charge
All off-takes at flate rate of 393.79 408.37 480.86
Fixed charge (Rupees per month). 390,000 390,000 390,000

(x) Liberty Power Limited’s Gas Turbine Power Plant (Phase1) at Daharki:
All off-takes at flate rate of 990.97 1,260.34 1,267.35

(xi) Captive Power :


All off-takes at flate rate of 382.37 396.53 494.86

(xii) Independent Power Producers:


All off-takes at flate rate of 332.36 344.67 437.86

[ File No.10-3(7)/2012]

(Syed Jawad Naseem)


Senior Executive Director (Finance)

You might also like