MSC - HRM - Martha Danny Maganga - 2014 PDF
MSC - HRM - Martha Danny Maganga - 2014 PDF
MSC - HRM - Martha Danny Maganga - 2014 PDF
By
Martha Danny Maganga
i
CERTIFICATION
We the undersigned, certify that we have read and there by recommend for
acceptance by the Mzumbe University, a dissertation titled “Assessment of Time
Management in Improving Organisational Performance In Bank Industry: A Case
of Tanzania Postal Bank, Dar es Salaam” fulfillment of the requirements for award
of the Degree of Master of Science in Human Resource Management (MSc-HRM) of
Mzumbe University.
___________________________
Major Supervisor
___________________________
Internal Examiner
_______________________________________________________
CHAIRPERSON, FACULTY/DIRECTORATE BOARD
i
DECLARATION
AND
COPYRIGHT
I Martha Danny Maganga, hereby declare that this thesis is my own work and has
not been submitted for a degree award at any other University or Higher learning
Institution and it will not be presented elsewhere.
Signature ___________________________
Date _______________________________
©2014
This thesis is a copyright material protected under the Berne Convention, the
Copyright Act 1999 and other international and national enactment, in that behalf, on
intellectual property. It may not be reproduced by any means in full or in part, except
for short extracts in fair dealings, for research or private study, critical scholarly
review or discourse with an acknowledgment, without the written permission of
Mzumbe University, on behalf of the author.
ii
ACKNOWLEDGEMENTS
My gratitude first goes to GOD who has given me strength and courage to undertake
this research. My special gratitude is extended to my beloved parents, Mr and Mrs
Danny Maganga who fortified the pillar of this product by their consistent and
ceaselessly encouragement on which I built and retained my confidence for success.
I would like also to thank management and all staffs of Tanzania Postal Bank for the
support and great cooperation given to me on the success of this research report.
Finally, I thank my brother Jacob, Sister Mary and my friends Michael Mahiza and
Newton Ntinika, Who must have wondered what I was doing, while this work was
being written. I appreciate the constructive comments, helpful feedback and personal
support provided by them. My God bless all of them.
iii
DEDICATION
iv
LIST OF ABBREVIATIONS
HR - Human Resources
HRD - Human Resource Department
HRO - Human Resources Officers
HRP - Human Resources Planning
TM - Time management
TPB - Tanzania Postal Bank
v
ABSTRACT
The study recommends every individual must see time as a company concern and not
a personal issue; it has increasingly become an organizational issue whose root
causes are deeply embedded in corporate performance and cultures
vi
TABLE OF CONTENTS
Pages
CERTIFICATION ...................................................................................................... i
DECLARATION AND COPYRIGHT ....................................................................ii
ACKNOWLEDGEMENTS......................................................................................iii
DEDICATION........................................................................................................... iv
LIST OF ABBREVIATIONS ................................................................................... v
ABSTRACT ............................................................................................................... vi
TABLE OF CONTENTS.........................................................................................vii
LIST OF TABLES ..................................................................................................... x
LIST OF FIGURES .................................................................................................. xi
CHAPTER FOUR.................................................................................................... 46
PRESENTATION OF THE FINDINGS................................................................ 46
1.1 Introduction .............................................................................................. 46
4.2 Demographic Variables............................................................................ 46
4.2.1 Respondent’s Age .................................................................................... 46
4.2.2 Respondents Gender................................................................................. 47
4.2.3 Respondents Education Level .................................................................. 47
4.2.4 Employee Working Experience ............................................................... 48
4.3 Awareness of Employees on Effective Time Management. .................... 48
4.4 Time Taken in Accomplishing Assigned Duties ..................................... 50
4.5 Effectiveness of Time Management in Service Delivery ........................ 50
viii
4.6 Manager’s Involvement in Implementation of Time Management ......... 51
4.7 Relationship between Time Management and Performance.................... 52
4.8 The Findings on the Challenges of Time Management ........................... 53
CHAPTER FIVE...................................................................................................... 56
DISCUSSION OF THE FINDINGS....................................................................... 56
5.1 Introduction .............................................................................................. 56
5.2 Awareness of Employees and Managers about Time Management ........ 56
5.3 The Effectiveness of Time Management in Service Delivery ................. 56
5.4 Effective Time Management in Ensure Timely Completion of Assigned
Duties ....................................................................................................... 57
5.4 Manager Involvement in the Implementation of Time Management ...... 58
5.5 Relationship between Time Management and Performance.................... 59
5.6 Challenges of Time Management in Implementation of Time
Management............................................................................................. 60
5.7 Ways to Improve Implementation of Time Management ........................ 61
REFERENCES......................................................................................................... 64
APPENDICES .......................................................................................................... 67
Appendix A: Questionnaire for Tanzania Postal Bank Employees ................... 67
Appendix B: Interview Guide for Tanzania Postal Bank Managers ................. 71
ix
LIST OF TABLES
Pages
Table 4.1: Age Distribution of the Respondents................................................... 47
Table 4.2: Gender Distribution of the Respondents ............................................. 47
Table 4.3: Education Level of the Respondents ................................................... 48
Table 4.4: Employees Working Experience ......................................................... 48
Table 4.5: Time Taken in Accomplishing Assigned Duties. ................................ 50
x
LIST OF FIGURES
Pages
Figure 2.1: Maslow’s hierarchy of needs Model .................................................. 34
Figure 2.2: The Proposed Model of Study............................................................ 42
Figure 4.1: Awareness of Effective Time Management ....................................... 49
Figure 4.2: Effectiveness of Time Management in Service Delivery .................. 51
Figure 4.3: Managers Involvement in Implementation of Time Management..... 52
Figure 4.4: Relationship of Time Management and Performance........................ 53
Figure 4.5: Challenges of Time Management ...................................................... 55
xi
CHAPTER ONE
1.1 Introduction
Time is the period during which actions or processes take place. (Healthier, 2005)
defines time as a scarce resources which must be properly managed otherwise
nothing can be managed. .
Time management consists of tools and activities that help and individual effectively
manage and strategize his time. This is very important concept for everyone to
attempt, learn and master over the course f his career. Through effective time
management one can increase individual or group productivity and experience large
profit that will lead to a more satisfying over all work and life experience.
Setting goals, delegation, decision making and delegation are key elements to
perfecting time management. Time management employ exactly what is sound like –
effective organization of time, planning for the future, scheduling activities, writing
to do list and avoid time waster activities
Many of today’s time management books still emphasize efficiency and increasing
productivity with little emphasize on effectiveness and life balance. Although time
management had its starts over a hundred years ago, the needs for time management
is greater than ever, as the pace of life increasing the perception of time changes. Due
to increasing level of specialization people concentrate on a single task at a time or a
few simple task, this is because they attend more on rumors than work and become
bored sometimes. Due to the greater concentration of single task compare to previous
1
generation where it shows there was a freedom of working rather than today’s most
of the sector or organizations are privatized. Generation of rumors is the specific
proposition for belief, passed from person to person usually by word of mouth, (L.M.
Prasad, 2007).
More than a decade ago the description of concept was defined as the annual,
cyclical process in which supervisors and staffs participate together in setting
expectations, coaching and feedback, reviewing outcomes and rewarding the
effectiveness. Managers should put their main emphasize on employees and their
comprehension of performance management. This would help in preventing work
problems even before their occurrence and strengthening the success rate of every
process in the organization.
The integration between the individual units and the whole enterprise led to another
evolution of the above mentioned concept. The joint creation of plans, goal
implementation and strategy achievement was the main source for the creation of
shared vision of company’s success. People started to be measured in areas, which
were the most essential for future evaluation. (Benson, J. and Brown, M, 2007)
explained that, despite the terms’ evolution and various types of definitions and
meanings, performance management can always be described in three points;
(i.) Effective, which provides human resources with required knowledge and
skills to achieve certain level of results.
2
(ii.)Strategic, which refers to long-term strategic decisions and essential
objectives.
(iii.) Integrated, which connects and combines strategic, operational and
financial information and factors.
Therefore, time management needs to be taken into account that, the implementation
of organizational performance needs to be aligned with time management that needs
to be adapted and linked to company’s specific branch operational and strategic
goals, current and future financial situation. There is no agreement on the definition
of time management in past studies, as long as above mentioned system is not
capable of making a significant change, there is no point in implementing it.
Armstrong, M. 2006 suggested that, based on the literature we suggest a definition of
time management as behaviors that aim at achieving an effective use of time while
performing certain goal-directed activities. This definition highlights that the use of
time is not an aim in itself and cannot be pursued in isolation. The focus is on some
goal-directed activity to performance, such as performing a work task or an
important task which is carried out in a way that implies an effective use of time.
There are many barriers which could suppress the expected influence of the whole
process. It is recommended to collect and analyze data and information linked with
the implementation stages, because unsuitable system or a misuse of it can lead to
negative consequences, such as employee’s de-motivation or even whole
organization financial and functioning problems.
So, the basic objective of studying this was to gains knowledge about how to manage
organization following the time management so as to optimize the organization
achievement.
3
1.3 Statement of the Problem
In an organization there are number of resources which must be utilized such as
people, money and material which are all important. But there is one resource we all
have in common which is time. Time has to be managed so as improve performance.
Performance in an organization revolves around efficiency (doing things right) and
effectiveness (doing the right thing). As a manager, both the resources and
employees must be well managed. Time management strategies are associated with
the recommendation to set personal goals; these goals are recorded, broken down
into action plan or a simple task, implemented and being assessed.
4
(iii.) To know if time management can ensure timely completion of
assigned duties in bank industry
(iv.) To describe challenges facing bank industry in implementing time
management.
The researchers will be benefited by identifying variable areas for further Research,
and will be used as an additional reference to researchers on time management.
It will also add knowledge to the academic community and stimulate further research
in the field Time management.
5
1.7 Limitation of the Study
This study was self-financed and it was conducted during the working days. It was
therefore faced by both financial and time constraints. Financial constrains for
accommodation purpose and field research studies. For the case of time, the study
was conducted from morning where the Tanzania Postal Bank employees and
management have a lot of things to do hence have short time deal with my study.
Due to those two constraints the study was done in a single public organization; it
may therefore not yield comprehensive results for generalization of findings to other
public organizations
6
CHAPTER TWO
LITERATURE REVIEW
2.1 Introduction
This involves the activities like identifying, reading, evaluating, describing,
summarizing, discussing, citing and synthesizing various documents with
information related to the research problem under investigation with an intention of
incorporating them in the study. (Kamuzora at el.2008)
This chapter is a foundation on which the research is built. The purpose of the study
was to assess time management in improving organizational performance in bank
industry. The researcher conducted a conceptual overview of the study, theoretical
framework, and empirical studies in order to generate research ideas focused on
research objective and questions.
This chapter involved reviewing various studies and literatures relevant to the
problem being investigated or being exploited and within the frame work of the
theory structure. The general orientation of this literature review is then critically to
review and contribute the previous work in a relevant area which in turn serves as the
study guidelines for the researcher
7
both at work, at home and even in our personal life. In essence, you are the one in
control of your life.
(Barling, Cheung, & Kelloway 1996) add that, effective time management is clearly
a factor in job performance and thus can contribute to an organization’s profitability.
Engaging in time management, particularly planning behaviors, can also contribute
positively to group performance. Furthermore, poor time management has been
associated with high stress and strain (Jex & Elacqua, 1999), emotional exhaustion
(Peeters & Rutte, 2005), and health issues (Bond & Feather, 1988).
8
Also time management describes the employee’s behavior which is about being able
to produce supportable use of the employee’s time at intervals to perform certain
activities. It is defined as a combination of sensitivity for time, the setting of goals,
prioritizing tasks, and observation outcomes. This definition illustrates time
management as an associate example of self-regulation enabling workers to enhance
their performance, intelligence and reach career success (De Vos & Soens, 2008). As
an example, time management leads to success through reducing stress, maintaining
balance, increasing productivity and setting and creating an endeavor to realize one’s
goals.
According to (Orlikowski & Yates 2002), the temporal dimension of work has
become more important because of expanding global competition and increased
demands for immediate availability of products and services. Time management as a
behavior aims to achieve the economical use of time and should be related to certain
purposeful activities. This definition highlights that the use of time is not an aim in
9
itself, and cannot be pursued as a sole factor. Most targets are on some purposeful
activity, like performing a small task or a tutorial duty that is assigned in way which
means an economical use of time (Claessens & Eerde, 2007). (Claessens, 2004)
defined time management as behaviors that aim at achieving a cost-effective and
effective use of time, and he added that these behaviors have three major
components.
Second component is directions or tools that move toward preparing to use time
expeditiously (setting goals, coming up with tasks, prioritizing, making disruption
lists, grouping tasks) according to (Britton &Tesser, 1991) named this component as
coming up with behaviors.
Third component is providing a structure for managing time and self-monitoring, that
allows for an efficient performing of tasks and limiting the interruptions by others
such as (Fox & Dwyer 1995) and (Krediet, 1999). (Claessens, 2004) titled this
component as observation of behaviors.
10
focus of time management publications and training courses has shifted from
managers as the major target group to a broad audience of working people. The term
“time management” is actually misleading. Strictly speaking, time cannot be
managed, because it is an inaccessible factor. Only the way a person deals with time
can be influenced (Claessens & Eerde, 2007). Time management can be viewed as a
way of monitoring and controlling time (Eilam & Aharon, 2003). In this regard, it
would be more appropriate to speak about self-management with regard to the
performance of multiple tasks within a certain time period. But in the literature, the
term self-management has a different meaning. It refers to monitoring and regulating
oneself, but without any specific reference to techniques for monitoring time use.
The macro level refers to the choice and prioritization of goals, mid-level tasks
involving the creation of goals and sub-targets and the small level that consists of
design and implementation. (Macan's 1994) model of time management consists of
four components, that are seen to regulate the setting of time goals, priorities,
mechanisms of time management and organization preference. (Huang & Zhang's
2001) model of time management consists of three dimensions of mental structure
and multiple levels; which include the three dimensions of behavior, time
management, and the sense of the value of time, which incorporates two levels: the
social value of time- orientation and time-oriented individual value.
11
On the other hand, within the second dimension, the sense of managing over time
which consists of setting goals, Planning, prioritization, and allocation of time and
feedback. The dimension, within the sense effectiveness of time contains two levels:
the effectiveness of your time management and effective time management
behaviors. It is an essential resource every manager needs to achieve the goals and
objectives of an organization. It is so delicate that it cannot be saved but can only be
spent and once misused it can never be regained. (Autumn, 2012) In other hand, a
manager must have time management skills, means he must stand as a model for his
employee.
(Bowen, 2004) also argue that, over the years the focus of time management
publications and training courses has shifted from managers as the major target
group to a broad audience of working people. The term “time management” is
actually misleading. Strictly speaking, time cannot be managed, because it is an
inaccessible factor. Only the way a person deals with time can be influenced. Time
management can be viewed as a way of monitoring and controlling time.
Furthermore, Individual cannot eliminate the time wasters but steps can be taken to
minimize the impact, in other case time wasters can be totally eliminated because if
time is effectively managed and used as planed will be much more of enough
utilization of resources in the organization. For minimizing the influence of time
12
wasters or to eliminate it completely, (Prasad, 2005) proposed the following steps to
be taken;
First, right and orderly methods of working should be adopted in which there should
be a place for everything on its place.
Thirdly, work schedule should be prepared for each day showing starting and ending
time for each activity, and this should strictly be followed.
Fifth, as far as possible time should be fixed for meeting visitors and inform them
accordingly, still if some visitors comes who are likely to more time it is better to
discuss with them briefly and advise them to visit some other time with appointment
to discuss and serve them.
In general, Managers who managed and use their time effectively know what activity
they want to accomplish, the best order in which to take the activities and when they
want to complete those activities.
Set Priorities
Managing your time effectively requires a distinction between what is important and
what is urgent. (Kaufman, Lane & Lindquist, 1991) categorize our activities into four
quadrants in their time management matrix: urgent, not urgent, important and not
13
important. While activities that are both urgent and important must be done, he
suggests that we spend less time on activities that are not important (regardless of
their urgency) in order to gain time to focus on activities that are not urgent but
important. Focusing on these important activities allows you to gain greater control
over your time and possibly reduce the number of important tasks that do become
urgent.
Delegate
Delegation means assigning responsibility for a task to someone else, freeing up
some of your time for tasks that require your expertise. Delegation begins by
identifying tasks that others can do and then selecting the appropriate person(s) to do
them.
Stop Procrastinating
You may be putting off tasks for a variety of reasons. Perhaps the task seems
overwhelming or unpleasant. Try breaking down the task into smaller segments that
require less time commitment and result in specific, realistic deadlines. If you’re
14
having trouble getting started, you may need to do some prep work such as collecting
materials or organizing your notes. Also, try building in a reward system as you
complete each small task.
Avoid Multi-Tasking
Recent psychological studies have shown that multi-tasking does not actually save
time. In fact, the opposite is often true. You lose time when switching from one task
to another, resulting in a loss of productivity. Routine multi-tasking may lead to
difficulty in concentrating and maintaining focus when needed.
This implies that, proper management of time gives an individual more free time.
This acts as a motivation to effective time management, however this is the most
difficult part in time management especially the motivation to follow schedule plan.
Stay Healthy
The care and attention you give yourself is an important investment of time.
Scheduling time to relax or do nothing can help you rejuvenate both physically and
mentally, enabling you to accomplish tasks more quickly and easily. Poor time
management can result in fatigue, moodiness, and more frequent illness.
15
(Mc Cay, 1959) developed a concept for a time-management training program,
which is still being used. Critical elements are: giving insight into time-consuming
activities, changing time expenditure, and increasing workday efficiency by teaching
people how to make a daily planning, how to prioritize tasks, and how to handle
unexpected tasks. Many books and articles were written to convey these and similar
ideas to managers, promising them a greater effectiveness while using less time
(Blanchard & Johnson, 1983). Over the years the focus of time management
publications and training courses has shifted from managers as the major target
group to a broad audience of working people.
Time Planning
The Initial issue is planning, and as a result it seems to embrace a range of items that
are related to planning in the short term (either at intervals of the day or within the
week) and within the long term (Alay &Koçak, 2002). As (Barling et al. 1996)
opinioned that, time planning is linked to job performance under the conditions of
high motivation.
16
Time Attitudes
The second issue is time attitudes, this is very attitudinal in nature (Alay & Koçak,
2002).Time attitudes in agreement with connected within the assessment of tasks that
are being performed. Time attitude reflects basic options of individual personality.
Time Wasters
(Alay & Koçak 2002) mentioned that time is wasted as a result of poor time
utilization habits and an inefficient use of private time. For example, sales personnel
are acutely aware that some customers are not real customers. In addition,
developing ways that helps them get rid of 'time-wasters' to improve themselves in
their work (Clark, 1983).
According to (Chioma & Ekpete 2011) time wasters associated with attitudes,
behaviors, and habits exhibited by educators, researchers, directors, and students.
17
and managing performance within an agreed framework of planned goals, standards
& competence requirements (Armstrong, 2007).
However, there are also data suggesting that time management behaviors may have
little effect on objectively measured job performance (Macan,1994). One explanation
for these inconsistent findings is the focus on the main predictive effects of time
management behaviors.
18
In contrast, we suggest that factors of time management may interact with job
performance (Britton & Glynn, 1989). This hypothesis is consistent with the notion
that job performance is a multiplicative function of both skill level and motivation
(Pinder, 1984). Engaging in time management behaviors may be viewed as an
individual difference in skills and is unlikely to be reflected in a direct increase in
performance for all individuals. Rather, increasing time management behaviors is
likely to enhance the effectiveness of motivated employees and have little
consequence for employees who are not motivated to perform.
Our hypothesis is also consistent with (Macan, 1994) suggestion that engaging in
time management behaviors may be beneficial to the job performance of certain
types of people. (Schriber & Gutek 1987) found a serious relationship between
overall job performance and time management. They declared that management of
time is important to social control performance. The current study is designed to test
this hypothesized interaction of time management and job performance.
Time has been shown to be a new source of success for many companies. More and
more companies have concentrated on employing time-based strategies to increase
product development and launch speeds, or improve manufacturing, delivery, and/or
compress customer response time (Droge, 2004)
Flexible work options traditionally have been introduced largely to meet employer
needs for flexibility or to keep costs down, although they may also have met
employee needs and demands (Krausz et al., 2000). Most importantly, there is
virtually no research finding that employees working on flextime have lower
productivity than those on traditional fixed work schedules (Yang & Zheng, 2011).
19
typically considered to be the ability of workers to make choices influencing when,
where, and for how long they engage in work-related tasks (Hill et al., 2008). There
are various potential definitions of working time flexibility, emphasizing either the
company side or employee-centered flexibility. The latter refers to the ability of
workers to adjust their daily or weekly working hours in a way that best fits their
preferences and constraints. Such flexibility may range from varying workday start
and end times to complete autonomy as to when work is performed (Golden et al.,
2011).
Job performance
Individual performance is of high relevance for organizations and individuals alike.
Showing high performance when accomplishing tasks results in satisfaction, feelings
of self-efficacy and mastery (Sonnentag, Volmer, & Spychala, 2008). Moreover,
high performing individuals get promoted, awarded and honored. Career
opportunities for individuals who perform well are much better than those of
moderate or low performing individuals (Van Scotter, Motowidlo, & Cross, 2000).
Van Scotter, Motowidlo and (Cross, 2000) point out that job performance must be
20
distinguished from effectiveness and from productivity or efficiency. Effectiveness
refers to the evaluations of the results of performance (i.e., financial value of sales).
In comparison, productivity is the ratio of effectiveness to the cost of attaining the
outcome. For example, the ratio of hours of work (input) in relation to products
assembled (outcome) describes productivity. A great deal of attention has been paid
to the distinction between task and contextual performance.
There are three basic differences between task and contextual performance
(Motowildo, Borman, & Schmit, 1997) contextual performance activities are
comparable for almost all jobs, whereas task performance is job specific; 2) task
performance is predicted mainly by ability, whereas contextual performance is
mainly predicted by motivation and personality; 3) task performance is in role
behavior and part of the formal job description, whereas contextual performance is
extra role behavior and discretionary (not enforceable), and often not rewarded by
formal reward systems or directly or indirectly considered by the management. Like
task and contextual performance, adaptive performance also appears to be a
multidimensional construct, through handling emergencies or crisis situations,
handling work stress, solving problems creatively and etc. (Pulakos, Schmitt, &
Dorsey, 2002).
These performance types differ with respect to their antecedents and consequences
and can be conceptually and empirically separated. A variety of measures of job
performance has been used over the past decades. For example, rating scales, tests of
job knowledge, hands-on job samples, and archival records have been used to assess
job performance. From these measurement options, performance ratings (e.g. peer
ratings and supervisor ratings) are the most frequent way of measuring job
performance (Viswesvaran, Ones, & Schmidt, 1996). Measurement of performance
is central as important organizational decisions are based on individual performance.
21
realized in practice (Barling et al., 1996). Empirical findings suggest that positive
time management practices are associated with self-evaluations of academic
performance (Macan et al., 1990), objective grade point average (Britton & Tesser,
1991), job satisfaction (Landy, Rastegary, Thayer, & Colvin, 1991), and self-
perceived organizational performance (Lim & Seers, 1993). However, there are also
data suggesting that time management behaviors may have little effect on objectively
measured job performance (Macan, 1994). One explanation for these inconsistent
findings is the focus on the main predictive effects of time management behaviors.
Previous investigations have consistently assessed the direct or indirect effects of
time management on job performance (Macan, 1994). In contrast, we suggest that
factors of time management may interact with job performance (Britton & Glynn,
1989). This hypothesis is consistent with the notion that job performance is a
multiplicative function of both skill level and motivation (Pinder, 1984). Engaging in
time management behaviors may be viewed as an individual difference in skills and
is unlikely to be reflected in a direct increase in performance for all individuals.
Rather, increasing time management behaviors is likely to enhance the effectiveness
of motivated employees and have little consequence for employees who are not
motivated to perform.
Our hypothesis is also consistent with (Macan, 1994) suggestion that engaging in
time management behaviors may be beneficial to the job performance of certain
types of people. (Gutek, 1987) found a serious relationship between overall job
performance and time management. They declared that management of time is
important to social control performance. The current study was designed to test this
hypothesized interaction of time management and job performance.
Time has been shown to be a new source of success for many companies. More and
more companies have concentrated on employing time-based strategies to increase
product development and launch speeds, or improve manufacturing, delivery, and/or
compress customer response time (Droge,2004) Several researchers in the
innovation and organizational theory literature argue that initiating and implementing
radical change to improve competitive capabilities can be facilitated or hindered by
22
the firm’s structure design(Ay Nahm at el, 2003) Since organizational structure is a
key to managers’ implementation of strategy, it has long been considered an
important mechanism for operational strategy (Droge, 1987). One of the challenges
facing firms is the need to reform their organization structure associating with time-
based strategies to improve both financial and time-based performance (e.g. time to
market, time to product, customer responsiveness). The literature suggests that as
firms operate in time-based environment, they need a structure that has: few layers in
hierarchy, (Pine1993) a high level of horizontal. (Damanpour, 1991). And a
decentralized decision-making, (Droge, 1999).However, little empirical studies have
examined the relationship between organizational structure and firm’s time-based
performance. It has yet to be empirically tested.
A common problem identified in all the existing research literature is that there is no
coherent theory of exactly how, through which pathways, various working time
arrangements influence employee productivity, directly or indirectly (Kelly et al.,
2008). Prior meta-analyses were driven by a set of hypotheses derived from a wide
range of theoretical models. For example, they are typically rooted in some area
within the occupational and organizational health psychology fields, applying models
such as “job demands” (work stress), “work adjustment”, “job characteristics” and
“person-job fit”. The industrial-organizational psychology approach, together with
the human resource approach, form the “business case” line of research. The labour-
industrial relations literature frames the institutional and workplace structural forces
that give rise to either cooperation or conflict in the determination of working time
and flexibility practices (e.g. Brewster et al., 1996).
23
The labour-industrial relations and human resources approaches combine to observe
whether, or establish that, it is in the long-term interest of companies to adopt
employee-centered flexibility of their own volition, abstracting from national policies
or standards various human resource practices that improve the health not just of
workers, but also of the firm or organization. Thus, most of the relevant research,
particularly regarding the consequences of flexible working time arrangements, has
been conducted at the level of the company.
What is the evidence on the relationship between working time arrangements and
some of the key outcomes for employers, either directly or indirectly, intended or
unintended? Is there a sound basis for taking the “optimistic view” that one goal need
not be sacrificed to obtain the other? Much evidence has been generated in the
decade since the highly useful meta-analyses of (Baltes et al.1999) and Martens et al.
(1999), and the comprehensive literature review of (Ozekia, 1999). The former
included several dozen studies of flexi time and compressed workweeks, narrowed to
those studies with pre- and post-intervention test measures or normative
experimental comparisons, and found that results varied according to the policy and
outcomes assessed as well. Definitive generalizations are difficult to make, given that
most studies were of specific cases, covering particular companies, occupations,
industries or worker demographics. Some forms of flexible work schedules, such as
part-time work, compressed workweeks, annualized hours and flexi time, have a long
history of implementation. For example, the meta-analysis by 9Baltes et al. 1999)
concluded that both flexi time and compressed workweeks had, on balance, positive
effects on productivity, worker self-rated performance, and worker satisfaction with
work schedules, but absenteeism was reduced only by flexi time.
Flexible work options traditionally have been introduced largely to meet employer
needs for flexibility or to keep costs down, although they may also have met
employee needs and demands (Krausz et al., 2000). Most importantly, there is
virtually no research finding that employees working on flexi time have lower
productivity than those on traditional fixed work schedules (Yang & Zheng, 2011).
Similarly, prior comprehensive reviews of the literature on occupational health and
24
safety, which affect worker and organizational productivity in a more indirect way,
include the role of both duration of hours and worker discretion or choice regarding
how much and when to work (Danna & Griffin, 1999) (Spurgeon et al., 1997).
Working time flexibility is an important subset of “workplace flexibility”. The latter
is typically considered to be the ability of workers to make choices influencing when,
where, and for how long they engage in work-related tasks (Hill et al., 2008).
There are various potential definitions of working time flexibility, emphasizing either
the company side or employee-centered flexibility; (Possenriede &Plantegna, 2011).
The latter refers to the ability of workers to adjust their daily or weekly working
hours in a way that best fits their preferences and constraints. Such flexibility may
range from varying workday start and end times (e.g. flexi time) to complete
autonomy as to when work is performed (Golden et al., 2011). It implies having both
access to and use without jeopardy of flexible scheduling practices
Every employee must know, or at least learn to know, time management skill to
manage their valuable time resource. Evaluating time management skill of an
employee means evaluating how well an employee can deal with deadlines,
estimation, project schedule or balance between private life and work. Only when the
employee has mastered this skill, he or she can give the best performance.
If your employees have differing levels of productivity and timeliness, you'll need to
know how to phrase your employee appraisals. (Bowen, 2003) argued that, In order
for the written feedback on your evaluations to have a long-lasting impact, you need
25
to focus on the individual performance factors that determine the quality and quantity
of your employees’ work. The best strategy is to include targeted phrases that
energize an employee to keep up the good work in key areas, while also encouraging
employees to focus more carefully on the quality and quantity of their work where
needed.
26
a worker is expected to correct deficiencies will protect the worker and the employer
and avoid any confusion about expectations. The purpose of a Performance
Improvement Plan is to help an employee address and correct any issues in their
work that may be affecting the business. Develop a Performance Improvement Plan
before taking other disciplinary actions in order to include the employee in the
strategizing of his or her performance improvement as indicated under;
Managers should consider the level of authority that they expect the employee to
possess when completing specific goals or tasks. To do this, managers should
consider the following: How far can they go? How much can they spend? Who can
they talk to and/or involve? What resources do they have access to?
27
2.10.3 Develop an Action Plan that Includes Goals and Objectives
Assign specific tasks to both the supervisor and the employee to make the
improvements outlined in the expectations. Ask the employee for input as to whether
the action items are reasonable and fair. Make sure the employee has the tools he or
she needs to improve performance, including support from other staff or supervisors.
28
are job-related helps ensure fairness of the process and reduces discrepancy.
Armstrong, M. 2006 argued that, although sometimes difficult to hear, objective
feedback supported with regular documentation is difficult to dispute.
Managing the performance of another individual is not an easy task and requires
many skills. Training may be required to ensure managers feel adequately prepared
to effectively complete all the tasks related to performance management. This is
especially the case for newly promoted supervisors. Managers need to understand
human behavior, how to motivate, how to develop, provide coaching and deal with
conflict to a great extent, managers must be observers and able to assess a situation,
provide motivation and identify problems that interfere with performance. In
addition, managers must understand that individuals at different levels of comfort,
ability and experience with their jobs will require different levels of input, support
and supervision. A manager who feels adequately prepared to provide and receive
feedback, deliver a performance evaluation and conduct a performance evaluation
meeting will be a major contributor to a successfully functioning process.
29
Managers must be observers and able to assess a situation, provide motivation and
identify problems that interfere with performance. In addition, managers must
understand that individuals at different levels of comfort, ability and experience with
their jobs will require different levels of input, support and supervision. A manager
who feels adequately prepared to provide and receive feedback, deliver a
performance evaluation and conduct a performance evaluation meeting will be a
major contributor to a successfully functioning process to employees.
30
caused by lack of logical information processing system, at results wastage of time in
searching for them.
Stress
The common challenge is feeling stressed by all the things that employee needs to do
and all the demands in his/ her time and attention. Normally employees feel stressed
when having too many things going on or when facing a large new project or task
and does not have clarity about what needs to be done.
Over whelmed
This feeling this mainly caused by one of two things, first is that people think they
have to everything, assuming that more is better. The best way to solve this problem
is to focus on achieving few things. Second reason people feel overwhelmed by
thinking that everything must be finished now.
Lack of Scheduling
This is the lack of planning for work performance. People get confused about what
and when activities to be performed. Once you have set goals to something, you need
to begin properly managing your time in order to work towards these goals. After
you have created a to-do list, next you need to create schedules which allow you to
complete all the important tasks within a given period of time. No matter who you
are, you only have a certain amount of time do get something done. Setting up a
31
schedule allows you to develop a systematic time frame which allows you to
complete the on time.
Generally, a schedule should be produced at the start of each week or month. The
time that you choose should be on your tasks and the deadlines you have for
completing them. To set aside a time, you first want to decide when you want to
begin working on a project. Saleemi, 1987 agreed that, once you have decided which
times you want to work on the task, next need to decide which tasks are the most
important. Typically, these are being the things you are judged on. This requires you
to compare your schedule with your to-do list. Often find that your schedule and to-
do list work together and it is difficult to have one without the other.
Unnecessary Gossip
People who engage themselves in unnecessary gossip with their friends and
colleagues waste a lot of their precious time that might be used in productive
measures. While it is unrealistic to think that gossip totally eradicated from the
workplace, employers can take charge of the situation. Employee communications
can include written and verbal expectations and reminders of acceptable conduct in
the workplace. By setting an example and providing additional training, hopefully
employers can prevent seriously damaging gossip from taking root, as the result of
golden root to effective use of time direct to positive organizational performance. As
the golden rule says, treat others as you want to be treated, which seem to be a
timeless approach.
32
Unplanned Meetings
This is the basic characteristics of many organizations. Many of these meetings are
part of routines and do not contribute any meaningful things except time wastages.
Most meetings expects agree on at least two things; one, there are too many meetings
in the workplace, and two; most of those meetings are waste of time. The
organization and participants (employee’s) gain little or no values when meetings
seems to be time wasters and with no positive performance or don’t go well and
when the meetings go well often produce many valuable results. For instance, as a
result of sharing expertise and perspective in meetings, complex organization issues
can be addressed and resolved.
External Factors
This factor is mainly caused by external environment such as Family matters, traffic
jam, whether and natural calamities, these factors can distract an employee to use
time effectively.
33
The theory doesn't specify the time period required to attain them, but it focuses on
understanding your needs, differentiating them, and setting time limits on getting
each done so that you do not encroach on other essential areas of your life. This
theory has been illustrated in figure 2.1
The pickle jar represents human life. The major responsibilities of life or goals are
represented by the rocks that occupy most of the space. This infers that, people
should dedicate more time to such goals. The chipped stones or the pebbles
34
symbolize person hobbies, which require comparatively lesser time than the
important goals. Lastly, the daily chores of a person life are the sand particles that get
placed perfectly between his/her goals and hobbies. The distractive force in human
life that takes away the attention from the path of success is the water. Apart from
teaching us the right way to manage time, this theory also makes us aware of the fact
that distractions that lead to mismanagement should be avoided completely in order
to follow the right track.
He argues that in theory X, management has the responsibility to ensure that the
productive elements of the enterprise are organized such as money, materials, and
people with the purpose of meeting economic ends. People have an inborn dislike of
work and tend to avoid it whenever an opportunity arises which we call time
wastage, they are inborn selfish, indifferent to the needs of the organization, peoples
efforts need to be directed through motivation, controlling their actions and
35
modification of their behavior so as to fit organizational needs, they always need to
be directed to take responsibility and have little or no ambition but above all
everything they seek security.
Due to the lazy inherent nature of human beings they are not able to perform well in
their own initiative. In order to make people to achieve the organizational objectives
they need to be persuaded, rewarded, coerced, controlled, directed or threatened with
punishment. The role of management is to coerce and control employees. If
management does not have an active intervention, people tend to remain passive and
resistant to the needs of the organization.
On the other hand theory Y stipulates that management is charged with the
responsibility to organize the elements of productive enterprise such as money,
materials, equipment and people with the aim of meeting economic ends. To people
work is a natural thing; they are not passive or resistant to organizational needs and
are always ready to express self direction when committed to the objectives because
people are naturally not lazy. Unlike theory X people accept and seek responsibility
at all times. However the only way management can ensure that people are
committed is to provide them with the right conditions and operation methods to
enable them achieve their goals through the direction of their efforts to meet
objectives of the organization on time.
36
2.13.5 Critics of McGregor Theory X and Theory Y
While his theory has done well to point out and explain some of the key
characteristics of managerial principles on workers behavior, his theory has fallen
short in a few areas.Social Scientists have directed their criticism towards the whole
set ofbeliefs about man and human behavior as well as about the task carried by
management on time (Vroom and Deci, 1970: 309).This evidence may not be that
conclusive but it is suggestive and has been drawn from a variety of sources namely:
the classroom, the clinic, the laboratory, the home and to a small extent the industry
(Vroom and Deci, 1970:309).
Yet management fears group hostility in attaining its desired objectives, tries to
make an attempt to control and direct human efforts in a way that goes against the
natural groupings of human beings. In addition the conventional theory states that
when mans social needs and maybe his safety needs are threatened he portrays a
behavior which defeats the objectives of the organization, by becoming resistant,
antagonistic, less cooperative but management forgets that this behavior is a
consequence not a cause.
37
Theory X also relies so heavily on external control of human behavior while theory
Y is more inclined to the aspects of self control and self direction. This creates an
element of two opposing positions, the difference between treating people as children
and that of treating them as adults. After bringing people through the former way a
shift to the latter cannot be achieved by a twinkle of an eye. The conditions placed by
theory X tend to tie people to limited jobs which also fail them from fully using their
capabilities, it has discouraged people from accepting responsibility, encouraging
people to remain passive and completely distorted the meaning of work. His theory
seems so mechanical, and ignores the fact that human nature is complex and people
are not locomotives to be manipulated.
38
organized in respect of the use of time does not necessary means a fixed state of
quality. It can be acquired through learning and developing through consistent
practicing and experience. Time will only work if the person is committed fully to it
thereby removing doubts.
The most important and crucial ingredient is confidence; this is split into two aspects.
Firstly, one needs to believe and have the full confidence that learning is possible and
also the development of the skills is possible as well. Secondly, the time management
strategies must be trusted because if not, there is no way it can work. If the two
aspects can be achieved, then the level of effectiveness will be immense.
39
(ii.) Organization Performance
Under this study organization performance is dependent variable, which is being
affected by independent variable.
2. 17 Hypothesis
In this study will have null hypothesis (Ho) which states the negative form and
alternative hypothesis (Ha) that indicate actual expectation.
a) Hypothesis one
Ho: Time management has no relationship with organizational performance
Ha: Time management has the relationship with organizational performance.
b) Hypothesis two
Ho: Time planning, time attitude and time waster does not stands between time
management and organization performance.
Ha: Time planning, time attitude and time waster stands between time management
and organizational performance.
c) Hypothesis three
Ho: Employees performance does not depend on time planning, time attitude and
time waster.
Ha: Employees performance depends on time planning, time attitude and time
waster.
40
2.18 Conceptual Framework
A conceptual framework is an analytical tool with many variations and contexts. It is
used to make conceptual distinctions and organize ideas. Strong conceptual
frameworks capture something real and do this in a way that is easy to remember and
apply.
Time attitude is very attitudinal and personal in nature where by an employee may
have a behavior that encourage time management means he/she is so confident and
courageous to eliminate the time waster and concentrate on assigned duties.
41
Figure 2.2: The Proposed Model of Study attitude
Time planning
Goal Provision of
Setting incentives
Time waster
42
CHAPTER THREE
RESEARCH METHODOLOGY
3.1 Introduction
This chapter explains the way in which the research was carried out. It is organized
under the following sub sections area; research design, study area, the population,
sampling techniques, research instruments, and data collection procedures and data
analysis.
43
3.6.1 Purposive Sampling
This sampling method used to get both managers and employees by choosing only
people that researcher believe they have relevant information about the subject
matter. By including few people with relevant information researcher’s time was
saved.
3.8.1 Interview
The researcher conducted personal interview method with the selected respondents
from the bank for the purpose of seeking the views from words of mouth on how
time is being managed, it was unstructured to enable widely and unlimited
information. This method was useful for managers because the researcher believes
44
they don’t have much time. This method enhanced clarification of the matter when
needed. The researcher attached sample of interview questions for managers are
attached as appendix I.
3.8.2 Questionnaire
A structured questionnaire with both open and close ended questions administered
directly to employees for them to fill in data. The open ended questionnaires were
used in the area where there was a need for detailed information, while close ended
questionnaire was employed in the area where there was a need for selection among
given answers. The researcher attached samples of questionnaire in are attached as
appendix II.
3.8.3 Observation
Observation carried out by visiting Tanzania postal bank main office, Tegeta branch
and Ubungo branch so as to verify the information gathered. The researcher used non
participatory observation so as to observe how time is being managed in banks.
45
CHAPTER FOUR
1.1 Introduction
This chapter presents the study findings and their implications regarding the
assessment of time management in improving organizational performance. The
analysis of the study findings was directed to the specific objectives and some of
research questions of the study. The specific objectives were:
(i.) To find out the awareness of effective time management among employees.
(ii.) To examine the effectiveness of time management in service delivery in bank
industry
(iii.) To investigate if time management can ensure timely completion of assigned
duties
(iv.) To describe challenges facing bank industry in implementing time
management.
46
can limit a person to manage time. Age alone contributes little to the understanding
of time management.
47
wanted to know if there is a difference in awareness and implementation between
more educated employees and less educated in managing time.
48
time management among employees. The response is as illustrated in the Figure 4.1
below:
No. of
respondents
33%
Percentage
67%
The data revealed that12 (24%) 46 (92%) respondents agree that they are more
conscious about time management, 04(08%) respondents dis agree on them being
aware of time management. This data was collected through questionnaire and
interview whereby a researcher visit three branches to find out if employees
understand the importance of time management at work place. This finding attributed
that Tanzania postal bank employees are more conscious about time management
because they were able to explain what time management means in their day to day
operations.
49
4.4 Time Taken in Accomplishing Assigned Duties
This area planned to find out how effective time management ensures timely
completion of assigned duties and how long a customer will be served. In this case,
different department were given questionnaire to fill about this question. The
researcher asked 5 departments to provide service provided and time taken. Human
resource department (recruitment) 2 months for external recruitment, operation
department (opening an account) 2 hours per day, Information technology
department (update a system) 30 minutes, insurance department (assessing loss) three
weeks. But all of these depend on system effectiveness and number of customer
transaction. This response is illustrated in the table 4.5 below.
50
Figure 4.2: Effectiveness of Time Management in Service Delivery
Indifferent
16%
Agree
46%
dis agree
38%
The response in table 4.2 shows that 23 (46%) respondents agree that effective time
management enhance service delivery, 19 (38%) respondents dis agree that time
management does not encourage service delivery and the last group was indifferent
08(16%) where by this group were not sure if time management enhance service
delivery.
51
Figure 4.3: Managers Involvement in Implementation of Time Management
Indifferent
4%
Agree
58%
dis agree
38%
The graph illustrate that 29 (58%) respondents agree that managers involve in
implementation of time management. 19 (38%) respondents disagree that managers
in Tanzania postal Bank They does not much participate in much in time
management. Then 2 (4%) respondents
52
Figure 4.4: Relationship of Time Management and Performance.
90
80
70
60
50 No. of respondents
Percentage
40
30
20
10
0
Agree Dis agree
The response was that 43 (86%) respondents agree that there is a relationship
between time management and performance, and only 07 (14%) respondents dis
agree on it, this is a smaller percentage compared to .the one who agree, therefore
time management enhance performance
53
customers roaming around the office talking irrelevant matter to other staff who are
busy at the moment, this interrupt the one who has concentrate in his duty that leads
loss of time in trying to capture back the concentration.
Infrastructure problem is during the peak time at stand bus whereby in time there is
crowd of people this creates discomfort for user. Respondents add that the cities
location is having high level of concentration of economic and social activities that
leads to traffic congestion.
The other challenge mentioned is failure to priotise 2 (4%) respondents said that
failure to priotise happens when one fail to choose important duty from less
important or important duty from an emergence duty. This will make an employee to
priotise in less wanted duty without his knowledge that will take a lot of time so that
he can submit the important one.
Inter dependent work 2 (4%) respondents explained that a work assigned for two
people one is lazy and the other one is active, will bring the burden to the active one
because he will have to finish up the job by himself. And this will take a lot of time
because the work that was supposed to be done by two people now only one person
has done it.
Attitude had 2 (4%) respondents, some people see time as a normal thing they don’t
take it as valuable thing that when lost it cannot be regained. Respondents add that
some employees came late at work without see any effect with the production
54
Lack of close and continuous 8 (16%) respondents said that there is poor
communication between management and staff, management does not know why
employees fail to manage time. This caused the problems remained un saved.
Poor working tools 12 (24%) respondents said that the bank does not have enough
tools which enhance effective performance; they said that there is a shortage of
computers, printers, stand by generator and software’s.
25
20
15
10
No. of respondents
Percentage
5
55
CHAPTER FIVE
5.1 Introduction
This chapter presents the discussion of the findings and developing recommendations
based on the analyses and data collected on the study.
Employees are more aware about time management because they understand the
value of time, most of the respondents were able to talk about how time management
increase performance. And not only having knowledge of time management but also
work on it.
Managers as well are more conscious about time management, they talked about the
knowledge of time management and how they make sure that employees work
through it.
56
amount does not give them work morale (Heskett, 2007) suggest that good pay
motivates and give morale to employees to better their past performance. Also they
give another reason that recognition can make an employee produce better as now
they know that they are part of the organization hence more production. They add
that one can never perform well if the organization does not recognize his presence.
The researcher argue that, performance is a wide thing, a lot of factors contributes to
it, an employee has to manage his time so as to finish up before deadline so that
management can recognize his ability to perform and that is where the recognition
and monetary motivation will be given to him.
Also it helps in timely completing task without stress and focus on the most
productive time of the day for instance; morning time is more productive
In this objective it was learnt that human resource department takes a lot of time in
recruiting new staff, there is a lot of bureaucracy means a panel meeting has to
consult a number of people for the candidates to be validated. Also after the
57
interview has finished they does not come up with selection at once. A lot of time is
spent there that leads a recruitment to take three months.
When an employee is absent from duty without reasonable course for a period of
exceeding four days, he shall be charged with disciplinary offense of being absent
without reasonable course and that breach shall constitute to a gross misconduct.
For those who will always come early at work are rewarded at the end of the year,
hence generates motivation to employees and when an employee is being motivated
his rate of production will increase that’s leads to increase of organizational
performance as well. In this case manager keeps the register sheet in staff file as
reference.
Also, line managers make sure that they give deadline to employees on every job
assigned this help the employee to finish the work on time. When needed line
managers use management by working around (MBO) so as to make sure that
employees concentrate on their assigned duties?
58
It was found that; managers provide working tools for employees so that they cannot
get stuck with the job. But the tools were not much enough in all departments for
instance; IT department lack some software in conducting their duties. In Human
resource department there was no printer machine they have to print to the secretary
office, whereby sometimes they have to wait for the secretaries to finish up with the
machine, so that they can also use it. This makes delay of accomplishing work on
time and some of the printed documents are more confidential.
19 (38) respondents dis agree that managers does not full involved in time
management because they only give deadline without provide working tools. For
example; a new system may be introduced without asking if the employees have
understood it well. Also they does not follow Employee relation Act in the part of
paternity leave, every father is supposed to get 3 days leave when his wife deliver a
child. But in Tanzania Postal bank a father is given only one day to fulfill his
paternity obligation. And 02 (04%) respondents do not have any idea that managers
involve in time management.
59
management and performances have direct relation; they go together, good time
management results into good performance. 07(14%) dis agree that there is no
relationship between time management and performance. This clarification supports
the alternative hypothesis in chapter two that there is a relationship between time
management and performance.
12 (24%) respondents talked about lack of enough working tool, in Tanzania Postal
bank they still use outdated method of tracing absentees that is attendance register
book this one may get loss or being intentionally destroyed and that will make the
loss of reference. Also there are not enough printers in all department, the other
problem was sitting arrangement, the researcher found that in Tegeta branch, seven
employees were accommodated in a small office that make discomfort. Other tools
were printers and software.
Interruption and infrastructure 9 (18%) respondents from different angles said that
interruption disturb ones time plan for instance; assignment of new task, system
failure, family emergence, scarce resource to accomplish the given assignment.
Infrastructure The public transport is the problem for those who use it when coming
to work and go back home; this is because most of the tarmac roads in town are in
low quality which leads to traffic jam. Also interdependent work occurs when there
is interdependent work with the person who doesn’t observe time. Only one person
will make the effort to accomplish the task on time hence burden to one side.
60
Failure to priotise 06 (12%) respondents said that priotization become hard when an
employee is having assigned duty and emergence and each of them has deadline that
make an employee fails to do so. Interdependent work 2 (4%) this is when there is a
work which needs to be done with more than one people and the other person
become lazy leads a burden to one part.
Lack of managers involvement 8 (16%) respondents said that managers only provide
deadline without working tools. 08 (16%) respondents talked about lack of close and
continuous communication between managers and subordinates that limit the
implication of time management.
61
CHAPTER SIX
6.1 Introduction
This study aimed to assess time management in improving organizational
performance in bank industry in Tanzania. This chapter is aimed at providing
summary, conclusion and recommendation as has been found out from this study.
6.2 Summary
The finding revealed that 92% of respondents admitted that they are more conscious
about time management and it is being implemented. Furthermore by reviewing
employees files and see the attendance records, and observing day to day operation,
time management is implemented at Tanzania postal Bank.
Furthermore, poor working tools, interruptions and poor infrastructure at large are
the most obstacles on the implementation of time management. Then respondents
were asked about manager’s involvement in the implementation of time management
whereby 76% of the respondents agreed that managers are involved in managing
time, as they conduct training to build capacity, follow up the attendance of
employees and giving out work deadlines. Respondents were asked if time
management can ensure timely completion of assigned duties Human resource
department use 1 month in recruitment process. Therefore the department should not
invest much time in recruitment.
6.3 Conclusions
The findings show that, Time management is satisfactory in Tanzania Postal bank
and it has direct link to the corporate performance because, majority of the
respondents understand and implement time management although there are some
challenges that limit the implementation.
62
6.4 Recommendations to Management
Managers should invest and buy working tools like enough computers, printers,
required software, standby generator and create conducive working environment by
re- arranging sitting arrangement in a way that employees can sit comfortably, also
management should make sure that they train employees on how to use them
effectively, so that duties can be performed smoothly.
63
REFERENCES
Adam, J. and Kamuzora, F.(2008) Research Methods for Business and Social
Studies. Mzumbe book project
Blanchard, K., & Johnson, S. (1983). The one-minute manager.Cornell Hotel and
Restaurant Administration Quarterly.
Bond, M. J., & Feather, N. T. (1988). Some correlates of structure and purpose in the
use of time. Journal of Personality and Social Psychology.
De Vos, A., &Soens, N. (2008). Protean attitude and career success: The mediating
role of self-management. Journal of Vocational Behavior.
64
George, J. M., & Jones, G. R. (2000).The role of time in theory and theory
building.Journal of Management, 26(4), 657–684.
Kaufman, C. F., Lane, P. M., & Lindquist, J. D. (1991). Time congruity in the
organization: A proposed quality-of-life framework. Journal of
Business and Psychology.
Lakein, Alan (1973). How to Get Control of Your Time and Your Life.. New York:
P.H. Wyden.
Lim, Y. M., & Seers, A. (1993). Time dimensions of work: Relationships with
perceived organizational performance. Journal of Business and
Psychology.
McCay, J. T. (1959). The Management of Time (1st ed.). Englewood Cliffs, NJ:
Prentice Hall.
65
Sparks, K.; Cooper, C.; Fried, Y.; Shirom, A. 1997.“The effects of hours of work on
health: a metaanalytic review”, in Journal of Occupational and
Organizational Psychology, Vol. 70, Issue 4.
Van Scotter, J., Motowidlo, S., & Cross, T. (2000).Effects of task performance and
contextual performance on systemic rewards.Psychology,
Journal of Applied, 85(4)
66
APPENDICES
A. INTRODUCTION
Greetings dear respondent,
I am Martha Danny Maganga a student at Mzumbe University pursuing Master
Science in Human Resources Management (MSc. HRM).I am undertaking research
titled: Assessment of time management for improving organization performance in
bank industry. A case of Tanzania Postal Bank. I am requesting for your assistance to
fill my questionnaire.
Kindly be informed that your response will be accorded with high level of
confidentiality and it is purely for academic purposes.
Thank you so much for your kindness.
B. BASIC INFORMATION.
Please indicate your answer by putting a tick in the appropriate box provided on your
right of each question
1. Gender:
(i.) Male ( )
(ii.) Female ( )
2. Level of education
(a.) Ordinary/Advance secondary school ( )
(b.) Diploma ( )
(c.) First degree ( )
(d.) Masters ( )
(e.) PHD ( )
(f.) Other please specify________________________________________
67
3. What is your work experience in this organization?
(a.) Less than a year ( )
(b.) One to five years ( )
(c.) Six to ten years ( )
(d.) Above ten years ( )
C. DETAILED INFORMATION
Please indicate as appropriate the extent to which you agree or dis agree with each
statement by circling the number that correspondent to or answering the following
key.
3= agree. 2= dis agree. 1= indifferent.
1. Our organization is highly focused on time management 3 2 1
8. Lack of working tools is one among challenge for time management 321
68
9. Serving customer on time is the driving force that propels organization
performance, how long does it takes to serve one customer? (Kindly specify
the service)
______________________________________________________________
______________________________________________________________
10. How does time management helps you in timely completion of assigned
duties?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
12. How does your manager or supervisor involve in the implementation of time
management strategies mentioned above
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
69
14. What challenges are you facing in implementing time management
strategies?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
15. What do you think should be done to overcome the mentioned challenges?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
16. What are your general views on the issue of time management in your
organization?
______________________________________________________________
______________________________________________________________
______________________________________________________________
______________________________________________________________
70
Appendix B: Interview Guide for Tanzania Postal Bank Managers
1. Do you normally conduct seminar, workshop or training concerning time
management strategies in your organization?
3. If no how do you make sure that your employees know the value of time
management in increase of productivity?
71