Configuring LAG Using MINI-LINK Craft Configuration and Operations Tasks
Configuring LAG Using MINI-LINK Craft Configuration and Operations Tasks
Configuring LAG Using MINI-LINK Craft Configuration and Operations Tasks
Note:
How to access the node using MINI-LINK Craft, see Accessing a Network
Element.
How to navigate in MINI-LINK Craft, see MINI-LINK Craft User Guide.
For a detailed description of the parameters on each MINI-LINK Craft page,
see MINI-LINK Craft User Interface Descriptions.
Figure 2 shows the workflow for configuring LAG using MINI-LINK Craft.
Figure 2 Workflow for Configuring LAG
Note:
Make sure to check the switch ports before adding a LAG, see Section 2.4.
Before go to LAG configuration page, first create the RL-IME and assign switch port
to WAN’s.