SIF Corporate-Presentatie 2017
SIF Corporate-Presentatie 2017
SIF Corporate-Presentatie 2017
2
Our history
3
1984: pressure and process vessels
Special projects
1980: 1999:
First tubulars Tubulars
for the locks of the London Eye
Oosterschelde
Storm Surge barrier
and
bridge piles for
workdock Neeltje
Jans
2015:
Tubulars for
Brighton Tower
5
First and recently completed wind projects
2002: Horns Rev - MT Hojgaard - 80 MP’s 2017: Galloper – Geosea / Deme – 56 MP’s + TP’s 6
First and recently completed
oil & gas projects
11
Production facility Roermond
Production facility Rotterdam, Maasvlakte 2
Key data
14
Production layout in Roermond and Maasvlakte 2
Production layout in Roermond and Maasvlakte 2
Pile production line 1 (oil & gas and wind) Monopile production line 1 & 2 (wind)
• Max. 3.5 mtr diameter pile production • Max. 11 mtr diameter pile production
• Suitable for piles for oil & gas and wind • Suitable for monopiles and transition pieces
• (Sub)assemblies max. 27 mtr (dependent on mass) • (Sub)assemblies max. 100 mtr
• Max. Lg = 120 mtr • Max. Lg = 120 mtr
• Plate bevelling
• Rolling
• Longitudinal welding and milling
• Circumferential welding and milling
• Shipment of sections, cans and cones to Maasvlakte 2
• Assembly of cans, cones and sections
• Coating
• Storage and trans-shipment at Maasvlakte 2
• Load-out onto installation vessel
17
Plate bevelling
Rolling
• We have 9 rolling machines
• > Capacity limits:
• Diameters up to 11.000 mm
• Maximum width 4.200 mm
• Maximum thickness 255 mm
• Maximum can weight 70 tons
Longitudinal welding & milling
Circumferential welding & milling
21
Cans, cones and sections to Maasvlakte 2
22
Assembly and coating
23
Storage
24
Load-out onto installation vessel
31
Monopile
32
Jacket wind
33
Jacket oil & gas
34
Transition pieces
1.500+ Wind turbine foundations by Sif
Powerful players in the market
Where do we go from here?
• Sif will stay the front runner in manufacturing large diameter monopiles
• Increased weight range up to 2000 ton per piece and 11mtr diameter
• Automatic assembly line for conical sections
• High capacity lean manufacturing of pin-piles for wind jackets
• Frontrunner in new designs such as flanged connections and TP-less
• Integration of TP functionality in MP and/or bottom section of the tower
• Tubulars for floating foundations
Quality management system
Thank you
for your attention