0% found this document useful (0 votes)
71 views1 page

Takt Time Calculation: Exercise Solution

A bulb manufacturing company works two 480-minute shifts per day, 5 days a week, with a 45-minute lunch break, for a total of 70 shifts over 7 weeks. The customer requested 2900 bulbs over this period. To calculate takt time, the available working time of 1827000 seconds is divided by the customer request of 2900 bulbs, resulting in a takt time of 630 seconds or 10.5 minutes per bulb.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views1 page

Takt Time Calculation: Exercise Solution

A bulb manufacturing company works two 480-minute shifts per day, 5 days a week, with a 45-minute lunch break, for a total of 70 shifts over 7 weeks. The customer requested 2900 bulbs over this period. To calculate takt time, the available working time of 1827000 seconds is divided by the customer request of 2900 bulbs, resulting in a takt time of 630 seconds or 10.5 minutes per bulb.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Takt Time Calculation

A company of bulbs works 5 days a week with 2 shifts a day. Every shift is of 480 minutes.
The break for lunch is 45 minutes. In the period of 7 weeks the customer's request is 2900 bulbs.
Calculate the Takt Time in the period.

Exercise Solution

Net Time per shift: 435 minutes

Shifts / Day * 5 * Weeks: 70 shifts

Available Time: 30450 minutes = 1827000 seconds

Customer Request: 2900 bulbs

Takt Time: 10,5 minutes = 630 seconds