100% found this document useful (1 vote)
935 views1 page

Electrical Works Productivity

This document outlines productivity norms for various electrical and ELV activities including conduit installation, wiring, cable tray installation, trunking installation, DB installation, DB termination, final fix accessories installation, and light point installation. It provides the quantity of each activity that can be completed per man per day or per square meter per man per day.

Uploaded by

anoopvvv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
935 views1 page

Electrical Works Productivity

This document outlines productivity norms for various electrical and ELV activities including conduit installation, wiring, cable tray installation, trunking installation, DB installation, DB termination, final fix accessories installation, and light point installation. It provides the quantity of each activity that can be completed per man per day or per square meter per man per day.

Uploaded by

anoopvvv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Productivity norms

S.N0 Activity
Qty Units
ELECTRICAL/ELV
1 Conduit 16 Rm/man/day
2 Wiring 30-40 Rm/man/day
3 Cable tray 5-6 Rm/man/day
4 Trunking 8-10 sq.m/man/day
5 DB Installation 1 Nos/man/day
6 DB Termination 1 Nos/man/day
7 Final Fix Accessories 8 Nos/man/day
8 Light points 8 Nos/man/day