Rab Pagar Kawat 2018
Rab Pagar Kawat 2018
Rab Pagar Kawat 2018
Jumlah Rp 48,537,077.00
PPn 10% Rp 4,853,707.70
Jumlah Total Rp 53,390,784.70
Dibulatkan Rp 53,390,000.00
Terbilang : Lima Puluh Tiga Juta Tiga Ratus Sembilan Puluh Ribu Rupiah.
Mengetahui : Padang, April 2017
PEJABAT PEMBUAT KOMITMEN Dibuat oleh :
BALAI PENGKAJIAN TEKNOLOGI PERTANIAN CV. INTIKARYA TIGAMITRA (INKATIM)
1 ### ls ###
2 ### m' Rp 637,800.00
3 ### ls ###
4 ### m2 ###
5 ### ls ###
6 ### m2 Rp 9,500.00
7 ### m' Rp 62,000.00
6 Pek. Galian Tanah m3 Rp 70,100.00
7 Pek. Urugan Kembali m3 Rp 23,300.00
8 Pek. Urugan Pasir m3 Rp 162,800.00
9 Pek. Urugan Tanah m3 Rp 160,600.00
10 Pas. Batu Kosong / Anstampang m3 Rp 383,400.00
11 Pas. Batu Kali Ad. 1 : 4 m3 Rp 572,100.00
12 Pas. Bekisting Kolom m2 Rp 241,400.00
13 Pas. Bekisting Balok m2 Rp 245,400.00
14 Pas. Bekisting Plat Lantai m2 Rp 354,600.00
15 Pas. Beton K - 100 m3 Rp 744,700.00
16 Pas. Beton Ready mix K 250 m3 ###
17 Pas. Besi Beton kg Rp 14,600.00
18 Pas. Sloof SP uk 15 x 20 cm m3 ###
19 Pas. Kolom KP uk 13 x 13 cm m3 ###
20 Pas. Balok BL uk 13 x 20 cm m3 ###
21 Pas. Balok RB uk 13 x20 cm m3 #REF!
22 Pas. Batu Bata Ad. 1 : 2 m2 Rp 139,900.00
23 Pas. Batu Bata Ad. 1 : 4 m2 Rp 131,000.00
24 Pas. Kuda - Kuda Baja Ringan m2 Rp 35,400.00
25 Pas. Atap Genteng Metal Tanpa Pasir T : 25 m2 Rp 62,200.00
26 Pas. Parabung Atap Genteng Metal m' Rp 75,000.00
27 Pas. Lisplank Fiber Cement m' Rp 83,300.00
28 Pas. Waterproofing Membran m2 Rp 94,600.00
29 Pek. Plesteran ad 1 : 2 m2 Rp 57,000.00
30 Pek. Plesteran ad 1 : 4 m2 Rp 52,500.00
31 Pek. Acian m2 Rp 32,800.00
32 Pek. Listprofil Beton m' Rp 50,000.00
33 Pas. Dinding Keramik uk 20 x 25 cm m2 Rp 201,000.00
34 Pek. Rangka Plafon Hollow m2 Rp 107,700.00
35 Pas. Plafon Gypsum T : 9 mm m2 Rp 66,300.00
36 Pas. Plafon GRC T : 4 mm m2 Rp 46,200.00
37 Pas. List Profile Gypsum uk 7 x 10 cm m' Rp 35,300.00
38 Pas. List Profile Gypsum uk 5 x 5 cm m' Rp 30,900.00
39 Pas. Keramik uk 40x40 Polised (Setara KIA) m2 Rp 287,300.00
40 Pas. Keramik uk 40x40 Unpolised (Setara KIA m2 Rp 319,900.00
41 Pas. Keramik uk 20 x 20 Unpolised m2 Rp 209,400.00
42 Pas. Lantai Batu Alam uk 10 x 10 cm m2 Rp 328,100.00
43 Pas. Step Nosing Tangga m' ###
Pekerjaan : LANJUTAN PEMBANGUNAN PAGAR KELILING KAWAT
Lokasi : SUKARAMI KAB. SOLOK
1 Pek. Bongkaran Bagian Gedung Lama Ls 1.00 Kolom Praktis 13x13 1.00 Ls
II Pekerjaan Pondasi
Pondasi Bata
410.58 M3
Pondasi Bata
1 Pas. Poor Beton 30x80 K-225 M3 7.68 40.00 x 0.30 x 0.80 x 0.80 = 7.68 M3
2.00 M3
7 Pas. Kolom Praktis 13x13 M3 3.13 31.00 x 5.97 x 0.13 x 0.13 = 3.13 M3
8 Pas. Balok Late topi-topi 13x20 diatas kozen M3 1.09 42.00 x 0.13 x 0.20 = 1.09 M3
1.09 M3
14 Pas. Dinding Bata 1:4 M2 676.15 Luas Kotor = 186.00 x 4.57 = 850.02
173.87
101.12 M2
16 Membuat Nama dan Logo Gedung Bahan Stainless steel Timbul Unit 1.00 = 1.00 Unit
IV Pekerjaan Plesteran
8.54 M2
Lokasi : SUKARAMI KAB. SOLOK
V Pekerjaan Plafond
1,014.05 M2
VI Pekerjaan Lantai
249.63 M2
1 Pas. Rangka Atap Baja Ringan M2 1,125.35 ( Luas x cos 30 (z)) = 974.55 : 0.866 = 1,125.35 M2
1 Pas. Pintu Kaca Allum. Kualitas setara Alexindo + Kaca & Acc
- P2 M2 0.45 = 0.45 M2
3 Pas Kozen Pintu Allumunium Kualitas setara Alexindo M1 122.40 24.00 x 5.10 = 122.40 M1
4 Pas. Pintu Rangka Kayu Fin. HPL Unit 24.00 = 24.00 Unit
5 Pas. Pintu Besi Rangka Hollow dicat dan terpasang Unit 1.00 = 1.00 Unit
7 Pas. Partisi GRC 9mm Double Rangka Metal Studs M2 378.00 Luas Kotor = = 189.00
378.00 M2
IX Pekerjaan Pengecatan
1 Pek. Cat Dinding Exterior Water Shield M2 1,042.34 Luas Kotor = 212.67 x 5.57 = 1,184.57 M2
173.87
5.54 M3
2.98 M3
Lokasi : SUKARAMI KAB. SOLOK
Lokasi : SUKARAMI KAB. SOLOK
- Pek Acian M2 9.94 49.70 x 0.20 = 9.94 M2
#REF! ###
750.00 M2
456.84 M1
359.04 Cm
253.09 M2
0.29 M3
- Pas. Kolom Praktis 13x13 M3 0.14 4.00 x 1.20 x 0.13 x 0.13 = 0.08
0.14 M3
9.16 M2
11.90 M2
- Membuat Nama dan Logo Gedung Bahan Stainless steel Timbul Unit 1.00 = 1.00 Unit
ANALISA HARGA SATUAN
Kegiatan : PEMBANGUNAN TAMAN SAINS PERTANIAN (TSP) SUKARAMI
Pekerjaan : LANJUTAN PEMBANGUNAN PAGAR KELILING KAWAT
Lokasi : SUKARAMI KAB. SOLOK
59,122.50
2,956.13
62,078.63
62,000.00
9,112.50
455.63
9,568.13
9,500.00
66,812.50
3,340.63
70,153.13
70,100.00
22,270.83
1,113.54
23,384.38
23,300.00
Jumlah
( Rp )
155,125.00
7,756.25
162,881.25
162,800.00
152,965.00
7,648.25
160,613.25
160,600.00
365,146.50
18,257.33
383,403.83
383,400.00
544,947.50
27,247.38
572,194.88
Jumlah
( Rp )
572,100.00
Jumlah
( Rp )
709,256.43
35,462.82
744,719.25
744,700.00
798,626.27
39,931.31
838,557.58
838,500.00
229,970.00
11,498.50
241,468.50
241,400.00
Jumlah
( Rp )
13,922.50
696.13
14,618.63
14,600.00
838,500.00
3,713,846.15
1,606,000.00
6,158,346.15
6,158,300.00
31,310.00
1,565.50
32,875.50
32,800.00
23,480.75
1,174.04
24,654.79
24,600.00
Jumlah
( Rp )
39,392.75
1,969.64
41,362.39
41,300.00
DAFTAR UKURAN PANJANG PORTAL
Posisi Sloof 15 X 20 Sloof 20 X 30 dinding t= 8.22 dinding t= 2.08 dinding t= 9.73 Balok Late 15 X 20
jml pjg total jml pjg total jml pjg total jml pjg total jml pjg total jml
3.00 42.20 126.60 3.00 14.00 42.00 2.00 16.00 32.00 1.00 11.35 11.35 4.00 14.00 56.00 3.00
2.00 10.53 21.06 4.00 6.30 25.20 2.00 1.40 2.80 2.00 1.92 3.84 2.00 42.20 84.40 2.00
2.00 16.00 32.00 - 3.00 6.80 20.40 2.00 10.30 20.60 2.00
2.00 1.40 2.80 - 1.00 3.50 3.50 1.00
3.00 14.00 42.00 - 2.00 3.00 6.00 2.00
3.00 6.80 20.40 - 1.00 3.50 3.50 1.00
1.00 3.50 3.50 - 4.00 1.60 6.40 4.00
2.00 3.00 6.00 - 1.00 1.85 1.85 1.00
1.00 3.50 3.50 - 2.00 1.00 2.00 2.00
4.00 1.60 6.40 - 1.00 48.50 48.50 1.00
1.00 1.85 1.85 - 2.00 4.92 9.84 2.00
2.00 1.00 2.00 - 1.00 3.00 3.00 1.00
1.00 48.50 48.50 - 2.00 2.80 5.60 2.00
2.00 4.92 9.84 - 1.00 2.00 2.00 1.00
1.00 3.00 3.00 - 4.00 3.92 15.68 4.00
2.00 2.80 5.60 - 8.00 0.25 2.00 8.00
1.00 2.00 2.00 - 4.00 1.00 4.00 4.00
4.00 3.92 15.68 - 4.00 1.55 6.20 4.00
8.00 0.25 2.00 -
4.00 1.00 4.00 -
4.00 1.55 6.20 -
I. Satuan Upah
1 Mandor Oh Rp 122,500.00
2 Kepala Tukang Oh Rp 130,000.00
3 Tukang Kayu Oh Rp 122,500.00
4 Tukang Batu Oh Rp 122,500.00
5 Tukang Besi Oh Rp 122,500.00
6 Tukang Cat Oh Rp 122,500.00
7 Pekerja Oh Rp 85,000.00
II. Satuan Bahan
1 Kerikil Beton m3 Rp 160,000.00
2 Kerikil Beton kg Rp 118.52
3 Pasir Beton / Pasang m3 Rp 156,000.00
4 Pasir Beton / Pasang kg Rp 111.43
5 Pasir Urug m3 Rp 107,000.00
6 Tanah Urug m3 Rp 105,200.00
7 Batu Bata Standar Bh Rp 900.00
8 Batu Kali Bulat Utuh m3 Rp 162,500.00
9 Portland Cement kg Rp 1,240.00
12 Besi Beton Kg Rp 11,500.00
13 Besi Beton dia.10mm M1 Rp 7,130.00
14 Kawat Beton Kg Rp 17,000.00
15 Besi Siku 30.30.3 Kg Rp 10,100.00
18 Paku Kg Rp 18,000.00
20 Kayu Bekisting Klas II - Papan m3 Rp 3,000,000.00
21 Kayu Bekisting Klas II - Balok m3 Rp 3,000,000.00
32 Atap Seng Warna Lbr Rp 57,000.00
56 Cat Tembok setara Catylac Kg Rp 23,800.00
57 Cat Tembok setara Dulux WeatherShield Kg Rp 85,000.00
58 Plamur Tembok Setara Dulux Wallfiller Kg Rp 22,500.00
59 Cat Dasar setra Dulux Alkali Primer Kg Rp 45,000.00
Ket
0.62kg/m1
Time Schedule
KEGIATAN : PEMBANGUNAN TAMAN SAINS PERTANIAN (TSP) SUKARAMI
PEKERJAAN : LANJUTAN PEMBANGUNAN PAGAR KELILING KAWAT
TARGET : SUKARAMI KAB. SOLOK
Jumlah 100.000
Bobot Rencana 8.392 16.122 7.730 8.469 8.469 8.469 8.469 8.469 8.469 8.469 8.469
Bobot Komulatif - 8.392 24.514 32.244 40.714 49.183 57.653 66.122 74.592 83.061 91.531 100.000
Realisasi
100
50
Daftar Perhitungan Besi
Jrk
Panjang
Tul Banyak Pjg 1 Stek
b=lebar h=tinggi Luas Banyak Pjg Total Berat/m Begel Berat/m Berat Besi Cetakan Stutwerk
Nama Struktur Utama Rata Begel Begel Gempa
/m3
-2
(M) (M) (M2) (M) (BH) (M) ( Dia ) Kg/M ( Dia ) Kg/M (M) (BH) (BH) (Kg) (Kg) (M2) (M3)
Sloof (S.2) 15 x20 0.15 0.20 0.03 33.33 4.00 133.25 12.00 0.888 8.00 0.395 0.15 113.00 0.53 142.016 13.333
Kolom Praktis 13 x 13 0.13 0.13 0.02 59.17 4.00 236.61 10.00 0.617 6.00 0.222 0.20 149.00 0.34 - 157.244 15.385
Balok (BL) 13 x 20 0.13 0.20 0.03 38.46 4.00 153.77 10.00 0.617 6.00 0.222 0.15 258.00 0.48 - 122.511 15.385
Daftar Perhitungan Besi
Jrk
Panjang Berat Berat Panjang Berat
b=leba h=ting Tul Pjg Besi Berat Besi Banyak Pjg 1
Luas Banyak Pjg Total Besi Tul. Begel Besi Total Begol/M3
Nama Struktur r gi Utama Terpakai Tul. Utama Begel Begel
/m3 Utama Rata - Begol Begol Beton
2
(M) (M) (M2) (M) (BH) (M) ( Dia ) (lonjor) (Kg) (Kg) ( Dia ) (M) (BH) (BH) (Kg) (M) (Kg)
rhitungan Besi
Berat
Total
(Kg)
**Our Values and Paths** **Set Our Values and Paths**
Sheet1
Eskalasi BPD Pariaman1.xls
C:\Documents and Settings\RGC\Application Data\Microsoft\Excel\XLSTART\Book1.
#N/A
Jumlah #REF!
Bobot Rencana #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Bobot Komulatif - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Realisasi
100
50