Shree Spherotech PVT - LTD.: Control Plan
Shree Spherotech PVT - LTD.: Control Plan
CONTROL PLAN
Prototype Pre-launch ✘ Production `
Control plan No: SSPL/CP/ CI /10 Key Contact Person/Phone: Mr. Virendra Patil - 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SS Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. PROCESS MACHINE,
SP. SAMPLE
NAME / DEVICE, JIG, PRODUCT /
CHAR. EVALUATION REACTION PLAN
OPERATION TOOLS FOR PROCESS Error CONTROL
NO. DESCRIPTION MFG. NO. PRODUCT PROCESS CLASS. SPECIFICATION / MEASUREMENT METHOD RECORD RESP.
Proofing
TOLERANCE TECHNIQUE SIZE FREQ.
C --
0.5% Max
Si 0.5% Max --
Collect
P 0.15 % Max piece of --
Spectrometer same
S 0.15% Max type --
from lot Per lot
Incoming If Found not ok, Reject
& grind (As per --
Mn 0.2% Min Incoming Raw Asst. Lab material & Inform to
M. S. Scrap for Incomin
Inspection material Incharge, Purchase dept. &
Cr. 0.2% Max spectro g quality --
sample. Register Supplier,
Plan)
Plate Fish/Angle
--
Type Cutting
size 2cm X 2cm Min. --
Visual
Free From Oil,
Rust, Tor Steel, 1 --
Nature Moisture
C 3.5 to 4.3 % --
Si 2.0 to 2.5 % --
Supplier T
If Found not ok, Reject
-- C& Store I/C,
Test Cetificate with Every Incoming material & Inform to
CI Pig Iron Mn 0.4 to 1.0 % 1 Incoming Asst. Lab
every supply. Supply Inspection Purchase dept. &
Inspection Incharge
Supplier,
Register
Supplier T
If Found not ok, Reject
C& Store I/C,
Test Cetificate with Every Incoming material & Inform to
CI Pig Iron 1 Incoming Asst. Lab
every supply. Supply Inspection Purchase dept. &
Inspection Incharge
-- Supplier,
P 0.15 % Max Register
--
S 0.10 % Max
Visual Insp.for If Found not ok, Reject
Every Incoming Asst. Lab material & Inform to
CI Boring Scrap rust, oil free & Visual Insp 1 -- No record
Supply Inspection Incharge Purchase dept. &
sutable size
Supplier,
C 3.00-4.00 % --
Si 1.70-2.30 % Inhouse --
Inspection melt -- Supplier T
Mn 0.40 % max Incoming If Found not ok, Reject
100-200Kg of C& Store I/C,
Pipe Scrap Every Inspection material & Inform to
S 0.01 % max Pipe scrap in 1 -- Incoming Asst. Lab
( DI Scrap ) Supply Purchase dept. &
furnace, take Inspection Incharge
P 0.07 % max -- Supplier,
spectro of same & Register
check. --
Cr 0.05 % max
Ti 0.06 % max --
VM 2% Max --
--
Moisture 12 % Max Supplier T
Supplier Test If Found not ok, Reject
C&
Maxicarb Cetificate with Every Incoming Asst. Lab material & Inform to
every supply &
1 -- Incoming
(Amcol) VM 15-40 Supply Inspection Incharge Purchase dept. &
inhouse inspection Inspection
Supplier,
--
Register
LOI 30-55
Swelling Value 28-45 --
50 sec to 80 sec.
Gelling Time Supplier Test --
Max
Cetificate with Random
ly
pH Value 8 to 11 every supply & collect --
Supplier T
inhouse small If Found not ok, Reject
Moisture % 8 % Max. -- C&
inspection Qty. Every Incoming Asst. Lab material & Inform to
Bentonite from 4- Supply Incoming
370-500 ml/ gm Inspection Incharge Purchase dept. &
M.B.Value 5 bags -- Inspection
Min Supplier,
mix Register
throughl
y. --
Free from lumps &
Nature contamination. Visual --
Powder form
--
Random
Volatile Matter % 60 ±10% ly --
collect
5 Max Test Cetificate with small -- Supplier T C
If Found not ok, Reject
Coal Dust/ / Ash Content % Qty. Every Incoming & Incoming Asst. Lab
every supply & from 4- Supply Inspection Inspection Incharge
material & Inform to
Pitch Powder inhouse inspection 5 bags Purchase dept. & Supplier,
Register
By Difference mix --
Random
throughl
Fixed C.% ly
y.
collect
AFS No. 45-65 sand --
from
Moisture % 7 % Max Test Cetificate with
differnt -- Supplier T C
If Found not ok, Reject
Silica Sand every supply &
location Every Incoming & Incoming Asst. Lab
material & Inform to
(Washed) Clay Content 2.0 % Max from Supply -- Inspection Inspection Incharge
inhouse inspection Purchase dept. & Supplier,
received Register
lot &
Sand Distribution Single Pick mix --
throughl
Test Cetificate with y& --
Si = every supply, also on Check
2%max actual use. --
Ca = (If possible check Supplier T C
recovery from If Found not ok, Reject
1.50 - 2.50 % Every Incoming & Incoming Asst. Lab
Innoculant spectro). 100% -- material & Inform to
Al. = Max Supply Inspection Inspection Incharge
Purchase dept. & Supplier,
Register
Ba = 2.5 %max --
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
MARVELOUS VIMERCATI FOUNDRY PVT.LTD.
CONTROL PLAN
Prototype Pre-launch Production ✘ `
Control plan No: MVF/CP/SG / 40 Key Contact Person/Phone: Mr. S.S.Kumbhar 9689899362
Part No./Latest Change Level: All SG Iron Items Core Team VIP, PDJ, SSK
Part Description All SG Iron Items Other Approval / Date (If required ) --
Supplier plant : --- Date (Original) 01.10.10
Supplier code --- Date (Revised) 28.02.11
Prepared by SSK Customer Engg. Approval date if reqd. --
Approved by PDJ Customer Quality Approval date if reqd. Other Approval / Date (If required )
CHARACTERISTICS METHODS
SR. MACHINE,
PROCESS NAME SP.
DEVICE, JIG, PRODUCT / SAMPLE CONTROL METHOD
/ OPERATION CHAR. EVALUATION
TOOLS FOR PROCESS
DESCRIPTION NO. PRODUCT PROCESS CLASS. MEASUREMENT
NO. MFG. SPECIFICATION
TECHNIQUE SIZE FREQ. RECORD RESP.
/ TOLERANCE
38 TO 50 mm Measurment of
4 Compactibiity Compactibiity of
sand by scale
MARVELOUS VIMERCATI FOUNDRY PVT.LTD.
CONTROL PLAN
Prototype Pre-launch Production ✘ `
Control plan No: MVF/CP/SG / 40 Key Contact Person/Phone: Mr. S.S.Kumbhar 9689899362
Part No./Latest Change Level: All SG Iron Items Core Team VIP, PDJ, SSK
Part Description All SG Iron Items Other Approval / Date (If required ) --
Supplier plant : --- Date (Original) 01.10.10
Supplier code --- Date (Revised) 28.02.11
Prepared by SSK Customer Engg. Approval date if reqd. --
Approved by PDJ Customer Quality Approval date if reqd. Other Approval / Date (If required )
CHARACTERISTICS METHODS
SR. MACHINE,
PROCESS NAME SP.
DEVICE, JIG, PRODUCT / SAMPLE CONTROL METHOD
/ OPERATION CHAR. EVALUATION
TOOLS FOR PROCESS
DESCRIPTION NO. PRODUCT PROCESS CLASS. MEASUREMENT
NO. MFG. SPECIFICATION
TECHNIQUE SIZE FREQ. RECORD RESP.
/ TOLERANCE
Revision Record:
Date Rev. No Existing Changed to Reason of change
28.02.2011 1 Nil Tolerances for Mulling time defined Suggestion during Internal Audit
REACTION PLAN
CHARACTERISTICS METHODS
SR. MACHINE,
PROCESS NAME SP.
DEVICE, JIG, PRODUCT / SAMPLE
/ OPERATION CHAR. EVALUATION REACTION PLAN
TOOLS FOR PROCESS Error CONTROL
DESCRIPTION NO. PRODUCT PROCESS CLASS. MEASUREMENT RECORD RESP.
NO. MFG. SPECIFICATION / Proofing METHOD
TOLERANCE TECHNIQUE SIZE FREQ.
No.damage,
Damage, Crack, crack , Loose, Pattern
loose Getting , thick or excess 1stl y Verification
Pattern Maker, If Found Damage,
Riser, Runner, used wear plate, When Inprocess Record
1 Visual Inspection 1 -- Molding Rework, refit the
wear plate, Parting adquate Parting Molding Inspection Register
Supervisor Pattern
Line, Vent, core Line, Provision of Started -SSPL-PS-
print vents, proper R-01
core prints
Match Plate
2 Ø25mmX5" Snap guage --
PATTERN & -Round Pin
CORE BOX
Match Plate -Flat
20 EQUIPMENT 3 Ø21mmX5" Snap guage --
Pin
VERIFICATION /
INSPECTION Match Plate- Ø25mmXØ32mmX
4 25mm
Snap guage -- Pattern
Round Pin
1stly Verification Pattern Maker, If Found damage or
Closing -Round When Inprocess Record
5 Ø25mmX13" Snap guage 1 -- Molding wareout, replace the
Pin Molding Inspection Register
Supervisor bush & pins.
Started SSPL-PS-R-
6 Closing -Flat Pin Ø21mmX13" Snap guage -- 01
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /30 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. MACHINE,
PROCESS NAME SP.
DEVICE, JIG, SAMPLE
/ OPERATION CHAR. PRODUCT / EVALUATION REACTION PLAN
TOOLS FOR PROCESS Error CONTROL
DESCRIPTION NO. PRODUCT PROCESS CLASS. MEASUREMENT RECORD RESP.
NO. MFG. SPECIFICATION / Proofing METHOD
TOLERANCE TECHNIQUE SIZE FREQ.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /30 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
30A SAND TESTING sand testing
CHARACTERISTICS METHODS
Equipment
SR. MACHINE, 1 sample Green Molding If not within the Range,
PROCESS NAME SP. per Sand Supervisor, Reject the sand & Refer
DEVICE, JIG, SAMPLE
/ OPERATION CHAR. PRODUCT / EVALUATION Hour Testing REACTION
Annexure PLAN
A
TOOLS FOR PROCESS Error CONTROL
DESCRIPTION NO. PRODUCT PROCESS CLASS. MEASUREMENT RECORD
Record RESP.
NO. MFG. SPECIFICATION / Proofing Inprocess
METHOD
TOLERANCE TECHNIQUE SIZE FREQ. Inspction Sheet -
SSPL-
Compactibiity PROD-F-
4 Compactibiity 35 TO 45 mm -- 03
scale
Clay Washer & 1 sample Sand Lab Inspector, If not within the Range
5 Total Clay 10-14% --
Weighing Scale per Day Testing QA Refer Annexure A &
7-10 % MB Test Work sheet Incharge,Found Adjest the Bentonite ,
6 Active Clay -- - ry manager water, coal compound
instrument.
SSPL/QA/ and fresh sand
3-7 % Subtraction of F/26
7 Dead Clay Ative Clay from -- Inprocess
Total clay Inspction
8 VM 3-6 % Muffle furnace --
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SSPL/CP/CI/30
SHREE SPHEROTECH REV.00
PVT.LTD. DATE:21.05.2015
Annexure A
Property Limit Observation Action Plan
1.50-75 AFS caI Fresh Sand sa^ND Addition
10 % poxaa vaaZivaNao
kmaI 2. Coal Compound Addition 300 gms p`maaNao
Total Clay 10-14 % vaaZIvaNao Fine Tuning krNao.
Blowing caalau krNao. sa^ND caa ipk
14 % poxaa baGauna jyaa AFS vartI Peak Value kamaI
jaast Aaho %yaa AFS caI sa^ND Addition caalua
k$na Fine Tuning krNao.
1.Bentonite Addition 500 gm nao vaaZvauna prt
Report caok krNao, ,yaaogya nasalyaasa prt
7.0 % poxaa 500gm Bentonite Addition krNao.
kmaI 2. Fresh Sand Addition kmaI krNao,(Permiability
Active Clay 7.0 -10.0 % yaaogya yaot Asaola tr)
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SSPL/CP/CI/30
SHREE SPHEROTECH REV.00
PVT.LTD. DATE:21.05.2015
Annexure A
Property Limit Observation Action Plan
1.Fresh Sand addition (50-55 AFS)caI 5Kg/ Mixer
k$na Permeability caok kravaI va prt fine
130 poxaa tunning kravao.
kmaI 2.Coal Compound Addition 300 gm kmaI k$na
Permeability caok kravaI va prt fine tunning
Permeability 130-230 kravao.
1.Fresh Sand addition (50-55 AFS)caI 5Kg/ Mixer
kmaI k$na Permeability caok kravaI va prt fine
230% poxaa tunning kravao.
jaast 2.Coal Compound Addition 300 gm vaaZvauna
Permeability caok kravaI va prt fine tunning
2.8% poxaa kravao.
1 laITr paNaI vaaZvaavao.
Moisture 2.8-4.0 % kmaI
4.0% poxaa
1 laITr paNaI kmaI kravao.
jaast
1.Bentonite Addition 500 gm nao vaaZvaNao.
1000% poxaa 2.Mixing Time 20 Sec. nao vaaZvaNao.
Green kmaI
3.Fresh Sand addition Permeability iktI yaoto to
Compression 1000-1400 %
baGauna kmaI krNao.
Strength
1400% poxaa 1.Bentonite Addition 500 gm nao vaaZvaNao.
jaast 2.Mixing Time 20 Sec. nao kmaI krNao.
1.Moisture % caok k$na 3.2% pya-Mt Adjust
35% poxaa kravao
2.Fresh Sand addition Permeability iktI yaoto to
kmaI
Compatibility 35- 50 % baGauna kmaI krNao.
50% poxaa 1. Fresh Sand addition Permeability iktI yaoto to
jaast baGauna 5 Kg / Mixer vaaZvaNao.
1. Pnumatic Rammer vaaprNao.
80 poxaa
2.Squeeze time 1 sec. nao vaaZvaNao.
kmaI
3. Jolt time 1 sec. nao vaaZvaNao.
Mold Hardness 80-95
1. Pnumatic Rammer vaap$ nayao.
95 poxaa
jaast 2.Squeeze time 1 sec. nao kmaI krNao.
3. Jolt time 1 sec. nao kmaI krNao.
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /40 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
PROCESS SP.
SR. MACHINE,
NAME / CHA PRODUCT / SAMPLE
DEVICE, JIG, EVALUATION REACTION
OPERATION R. PROCESS Error
TOOLS FOR NO. PRODUCT PROCESS MEASUREMENT
CONTROL
RECORD RESP. PLAN
DESCRIPTIO CLAS SPEC'N/ Proofing METHOD
NO. MFG. TECHNIQUE
N S. TOLERANCE SIZE FREQ.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /50 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /60 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,M Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SP.
SR. PROCESS MACHINE,
CHAR PRODUCT / SAMPLE
NAME / DEVICE, JIG, EVALUATION
. PROCESS Error CONTROL REACTION PLAN
OPERATION TOOLS FOR
NO. PRODUCT PROCESS CLAS MEASUREMENT RECORD RESP.
NO. DESCRIPTION MFG. SPEC'N/ Proofing METHOD
S. TECHNIQUE SIZE FREQ.
TOLERANCE
As per process
1 Core Setting Visual 1 1 -- Verfication
card
Inprocess Molding If Found no proper Setting &
60 Core Setting Manually
inspection Supervisor sand fall Reject the mold.
Venting
2 As on pattern Visual 1 1 -- No Record
Location
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /70 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,M Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SP.
SR. PROCESS MACHINE,
CHAR PRODUCT / SAMPLE
NAME / DEVICE, JIG, EVALUATION Error
. PROCESS REACTION PLAN
OPERATION TOOLS FOR NO. PRODUCT PROCESS CLAS MEASUREMENT Proofin
CONTROL
RECORD RESP.
NO. DESCRIPTION MFG. SPEC'N/ METHOD
S. TECHNIQUE SIZE FREQ. g
TOLERANCE
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /80 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SS Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. PROCESS MACHINE,
SP.
NAME / DEVICE, JIG, PRODUCT / CONT REACTION
CHAR. EVALUATION SAMPLE Error
OPERATION TOOLS FOR PROCESS ROL PLAN
NO. PRODUCT PROCESS CLASS. MEASUREMEN Proofi RECORD RESP.
NO. DESCRIPTION MFG. SPECIFICATION / METH
T TECHNIQUE SIZE FREQ ng OD
TOLERANCE .
80 CHARGE Induction 1 Pig Iron As per Annex B weighing scale 1 Per -- Inproc Productio Melting CRCA,
PREPARATION Furnace (% of Charge Mix Heat ess n log Supervisor, Shellcoke or
2 M.S Scrap 10-20% of Pig Iron, MS inspe sheet graphite,Fesi
Scrap. & R.R. is ction SSPL/PR , FeMn.,
Returns / on Avalability of D/F-01 Copper will
3 10-30%
Boring Certain be adjust
Material)Refer until you get
4 R.R Balance annexure B requd.
Chemistry on
5 DI Scrap 20-30% ferrolab/
Spectro.
As Per Process
6 C.P.C ( Carbon)
Requirment
As Per Process
7 Ferro Silicon
Requirment
Ferro As Per Process
8
Manganese Requirment
As Per Process
9 Copper
Requirment
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SSPL/CP/CI/ 80
DATE: 21.05.2015
Annexure B
Contingency Plan for Charge Mix
Sr. No. Situation Our Action
If Pig Iron(CI & SG) not available in 1.Add more amount of MS steel for cast iron & CRCA
1
totally or some amount scrap for Sg Iron to adjest the charge in kg.
2.Add more amount of CPC for Cast Iron % shell coke for
SG Iron to adjest the C%
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /90 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. PROCESS
MACHINE, SP.
NAME / EVALUATION SAMPLE Error CONTRO REACTION
DEVICE, JIG, CHAR. PRODUCT / PROCESS
OPERATION NO. PRODUCT PROCESS MEASUREMENT
L
Proofin METHO RECORD RESP. PLAN
TOOLS FOR MFG. CLASS. SPECIFICATION /
NO. DESCRIPTION TOLERANCE TECHNIQUE SIZE FREQ. g D
90 Melting Induction
Molten Metal Bath Composition Production
Furnace Inprocess
Per log sheet Melting
1 Inspectio
1 Carbon 3.20 To 3.30 % Heat n SSPL/PRD Supervisor ( To reduce C
Ferro lab machine -- /F-01 %,Si %, Mn%
2 Silicon 1.70 To 1.80 % add CRCA ) or
( To increase C
1 Carbon 3.20 To 3.30 % % , Si % , Mn
2 Silicon 1.70 To 1.80 % add
Recarboriser
3 Manganese 0.60 To 90 % Inproce Graphite &
Per ss Spectro Melting FeSi & FeMn )
4 Sulphur 0.2% Max Spectrometer 1 --
Heat Inspecti Report Supervisor The qty should
on not exceed
5 Phosporous 0.2% Max specified %)
6 Copper 0.2% Max
7 Cromium 0.10 To 0.20 %
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /100 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.S Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR.
PROCESS MACHINE,
SP.
NAME / DEVICE, JIG, PRODUCT / EVALUATION SAMPLE
CHAR. Error REACTION PLAN
OPERATION TOOLS FOR NO. PRODUCT PROCESS
PROCESS
MEASUREMENT CONTROL
RECORD RESP.
CLASS. SPECIFICATION / Proofing METHOD
DESCRIPTION MFG. TECHNIQUE
NO. TOLERANCE SIZE FREQ.
Production
1 st box Log sheet & If temp. is high then ,
Measurment of Metal
2 pooring 1420°C 1 Per Heat -- Process correct the temp. &
Temp. by Pyrometer Melting then start the pouring
Temp Sheet for
Supervisor
molding
Inprocess SSPL/PRD/
Inspection F-02
Per Laddle
Preparation
of Spectro As per metal Grade As per metal Grade Inprocess Spectro
Spectrometer 1 Chemistry
sample specification specification Inspection report
speciman
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /110 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.S Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. PROCESS
MACHINE,
NAME / SP. SAMPLE
DEVICE, JIG, PRODUCT / CONTR
OPERATION CHAR. EVALUATION Error REACTION PLAN
TOOLS FOR PROCESS OL
DESCRIPTIO NO. PRODUCT PROCESS CLASS. MEASUREMENT Proofin RECORD RESP.
MFG. SPECIFICATIO METHO
NO. N TECHNIQUE SIZE FREQ. g D
N / TOLERANCE
If knock-out cycle is
Sand
Sand free Melting insufficient for sand
3 adhering to Visually 1 1 -- No Record
Casting supervisor loosening , then
Castings
repeat the cycle.
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /120 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. PROCESS MACHINE, SAMPLE
SP. PRODUCT /
NAME / DEVICE, JIG, EVALUATION Error CONT
CHAR. PROCESS REACTION PLAN
OPERATION TOOLS FOR NO. PRODUCT PROCESS MEASUREMENT Proofi ROL
NO. DESCRIPTION MFG.
CLASS. SPECIFICATION / FREQ METH RECORD RESP.
TECHNIQUE SIZE ng OD
TOLERANCE .
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /130 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SS Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR.
PROCESS MACHINE, PRODUCT /
SP. SAMPLE
NAME / DEVICE, JIG, PROCESS EVALUATION Error CONTRO
CHAR. REACTION PLAN
OPERATION TOOLS FOR NO. PRODUCT PROCESS L
CLASS. SPECIFICATIO MEASUREMENT Proofin METHO RECORD RESP.
DESCRIPTION MFG. N/ TECHNIQUE g
NO. SIZE FREQ. D
TOLERANCE
130 Fettling Grinders, No extra metal /
Cutters 1 Extra Metal Visually 1 1 -- Rework the casting
fins
Excess Visual
No Excess Inproce
2 Felling / Visually 1 1 -- Inspection Reject
Felling / Grinding ss
Grinding cum QA Inspecter
Inspecti
Free from Rejection
on
foundry defects Report
Foundry
3 like sand drop , Visually 1 1 -- Reject
Defects
cold shut , shift ,
crack etc.
PREPARED BY: Mr. Sachin Kumbhar REVIEWED BY : Mr. Ameya Patil APPROVED BY : Mr. Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /140 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SS Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. MACHINE, SAMPLE
PROCESS NAME / SP. PRODUCT /
DEVICE, EVALUATION
OPERATION CHAR. PROCESS Error REACTION PLAN
JIG, TOOLS NO. PRODUCT PROCESS
CONTROL
DESCRIPTION CLASS. SPECIFICATION / MEASUREMENT Proofing METHOD RECORD RESP.
NO. FOR MFG. TECHNIQUE SIZE FREQ.
TOLERANCE
Casting
If hardness found low or high then check
Brinel Hardness Inprocess Hardness
Hardness 13 Hardness Hardness Testing 217 to 257 BHN 1 per Heat -- Job Inspector the tensile & also Check 100 % Hardness
Testing Inspection Testing of that Heat. Sort & send or Reject.
Report
In every 4
Week If this If tensile found low of 1st test bar
Tensile 241 Mpa UTM Machine grade Inprocess Outside lab
Tensile Strength 14 1 poured in
--
Inspection Lab Assit. then check 2nd test bar,if both test
Strength (External Lab) reports
these found foulty then reject
weeks.
Verify the castings
for free from foundry
defects like sand Visual
drop , cold shut , Inspection
Visual Foundry Free from Inprocess
17 Visual Inspection shift , crack, Visual 1 1 -- cum Job Inspector Reject the Casting.
Defects Defects Inspection
Shrinkage, Blow Rejection
Holes etc. Report
Visual
Inspection if Found Defected Castings Rework
Well Dressed & Inprocess
18 Fettling Visual Inspection Visual 1 1 --- cum Job Inspector (For under fettling only) or Reject the
Fettled Inspection
Rejection Casting.
Report
Free from Colour coading for Inprocess Visual If found Defected Castings mixing,
19 Visual Inspection Visual 1 1 --- Job Inspector
Mixing casting Inspection Inspection sagrigate & make colour coading.
Total Cast
30 Vernier Calper 5 per Lot --- Job Inspector Reject or Rework the Batch,
Height
Cast Dist 3 Vernier Calper 5 per Lot --- Casting Job Inspector Reject or Rework the Batch,
Dimensional
Cast Profile R 19 Radius fillet 5 per Lot --- Job Inspector Reject or Rework the Batch,
Inprocess Inspection
Dimensions 20 Pad Profile R 12.0 Radius fillet 5 per Lot --- Report Job Inspector Reject or Rework the Batch,
Inspection
Dim. 88.0 +-0.8 Vernier Calper 5 per Lot --- Job Inspector Reject or Rework the Batch,
Dim. 91.5 +-0.8 Vernier Calper 5 per Lot --- Job Inspector Reject or Rework the Batch,
Eaton Logo Visual Inspection Visual 1 1 ---
200000
Third
Non Distructive Casting Lay Measuring Nos Lay out If Found Defected cummunicate to
23 As per Drawings As per Drawings 1 --- Party Assit.QA Inch.
testing out Instruments Produced report customer
Inspection
/ Cavity
PREPARED BY: Sachin Kumbhar REVIEWED BY : Ameya Patil APPROVED BY : Virendra Patil
`
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/CP/ CI /150 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 5001460-001 Rev. - L / 09 Feb 09 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description END CAP Casting Other Approval / Date (If required ) --
Material Grade VS 2-1-3-2 (FG 260) Date (Original) 23.03.2018
Supplier plant : --- Rev. No/ date 00 / 23.03.2018
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SS Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. MACHINE, SAMPLE
PROCESS NAME / SP. PRODUCT /
DEVICE, EVALUATION
OPERATION CHAR. PROCESS Error REACTION PLAN
JIG, TOOLS NO. PRODUCT PROCESS
CONTROL
DESCRIPTION CLASS. SPECIFICATION / MEASUREMENT Proofing METHOD RECORD RESP.
NO. FOR MFG. TECHNIQUE SIZE FREQ.
TOLERANCE
Visual
Inspection if Found Defected Castings Rework
Dispatch -- Well Dressed & Inprocess
2 Fettling Visual Inspection Visual 1 1 --- cum Job Inspector (For under fettling only) or Reject the
Fettled Inspection
Rejection Casting.
Report
Free from Colour coading for Inprocess Visual If found Defected Castings mixing,
3 Visual Inspection Visual 1 1 --- Job Inspector
Mixing casting Inspection Inspection sagrigate & make colour coading.
PREPARED BY: Sachin Kumbhar REVIEWED BY : Ameya Patil APPROVED BY : Virendra Patil
SHREE SPHEROTECH PVT.LTD.
CONTROL PLAN
Prototype Pre-launch ✘ Production
Control plan No: SSPL/M-CP/BG-Cover-4301607/10 Key Contact Person/Phone: Mr. Virendra Patil 9970966333
Part No./Latest Change Level: 4301607/ E / 06.09.2006 Core Team Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SSK
Part Description Bearing Cover, C Shaft Other Approval / Date (If required ) --
Material Grade SAE G 3000 Grey Iron (FG 260) Date (Original) 05.07.2017
Supplier plant : --- Rev. No/ date 00 / 05.07.2017
Supplier code --- Customer Engg. Approval date if reqd. --
Prepared by Mr.VSP, Mr.ABP,Mr.Vhanugare,Mr.SS Customer Quality Approval date if reqd. --
Reviewed by Mr.Vhanugare Other Approval / Date (If required ) --
CHARACTERISTICS METHODS
SR. MACHINE, SAMPLE
PROCESS NAME / SP. PRODUCT /
DEVICE, EVALUATION
OPERATION CHAR. PROCESS Error REACTION PLAN
JIG, TOOLS NO. PRODUCT PROCESS
CONTROL
DESCRIPTION CLASS. SPECIFICATION / MEASUREMENT Proofing METHOD RECORD RESP.
NO. FOR MFG. TECHNIQUE SIZE FREQ.
TOLERANCE
INPROCES
VERNIER S IN-PROCESS OPERATOR &
20 FINISH TURNING CNC 1 BORE BORE ∅93.73 1 1 IN 5 -- INSPECTIO INSP RECORD INSPECTOR
CALIPER
N
INPROCES
BORING S IN-PROCESS OPERATOR &
2 DEPTH DEPTH 7.39 / 7.14 DEPTH VERNIER 1 1 IN 5 -- INSPECTIO INSP RECORD INSPECTOR
BAR
N
INPROCES
VERNIER S IN-PROCESS OPERATOR &
3 WIDTH WIDTH 12.70 1 1 IN 5 -- INSPECTIO INSP RECORD INSPECTOR
CALIPER
N
INPROCES
CHAMFER VERNIER S IN-PROCESS OPERATOR &
4 CHAMFER 1 1 IN 15 -- INSPECTIO INSP RECORD INSPECTOR 1. STOP THE PROCESS.
0.8X45° CALIPER
N 2. INFORM TO SUPERVISOR
INPROCES 3. CHECK LAST 5 FOR
FLATNESS < S IN-PROCESS OPERATOR & VARIATION.
5 FLATNESS FILLER GAUGE 1 1 IN 5 -- INSPECTIO INSP RECORD INSPECTOR
0.051 4. RESET THE PROCESS.
N
5. CHECK THE JOB IF OK,
INPROCES CONTINUE, IF NOT, THEN
PARALLELI PARALLELISM < S IN-PROCESS OPERATOR &
REPEAT 4 & 5
6 CMM 1 1 IN 25 -- INSPECTIO INSP RECORD INSPECTOR
SM 0.051
N
5. CHECK THE JOB IF OK,
CONTINUE, IF NOT, THEN
REPEAT 4 & 5
INPROCES
S IN-PROCESS OPERATOR &
7 POSITION POSITION < 1.02 CMM 1 1 IN 50 -- INSPECTIO INSP RECORD INSPECTOR
N
INPROCES
VMC RECEIVING S IN-PROCESS OPERATOR &
2 POSITION POSITION < 0.2 1 1 IN 5 -- INSPECTIO INSP RECORD INSPECTOR 1. STOP THE PROCESS.
FIXTURE GAUGE
N 2. INFORM TO SUPERVISOR
INPROCES 3. CHECK LAST 5 FOR
DRILL RECEIVING S IN-PROCESS OPERATOR & VARIATION.
3 PCD PCD ∅121.23 1 1 IN 5 --
∅10.00 GAUGE INSPECTIO INSP RECORD INSPECTOR 4. RESET THE PROCESS.
N
5. CHECK THE JOB IF OK,
EDIT CONTINUE, IF NOT, THEN
REAMER 1ST LOCK IN-PROCESS OPERATOR &
REPEAT 4 & 5
4 FEED AS PER PQS VISUAL 1 /SHIFT
∅10.30 PC INSP RECORD INSPECTOR
EDIT
1ST LOCK IN-PROCESS OPERATOR &
5 SPEED AS PER PQS VISUAL 1 /SHIFT INSP RECORD INSPECTOR
PC
INPROCES
S IN-PROCESS OPERATOR &
2 DEPTH DEPTH 7.39 / 7.14 DEPTH VERNIER 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
2. INFORM TO SUPERVISOR
N
INPROCES
VERNIER S IN-PROCESS OPERATOR &
3 WIDTH WIDTH 12.70 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
3. CHECK 100% FOR VARIATION.
CALIPER
N
INPROCES
CHAMFER S IN-PROCESS OPERATOR &
4 CHAMFER DEPTH VERNIER 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
4. SEGREGATE THE LOT.
0.8X45°
N
INPROCES
FLATNESS < S IN-PROCESS OPERATOR &
5 FLATNESS FILLER GAUGE 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
5. DESPATCH OK LOT ONLY.
0.051
N
INPROCES
PARALLELI PARALLELISM < S IN-PROCESS OPERATOR &
6 CMM 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
SM 0.051
N
INPROCES
S IN-PROCESS OPERATOR &
7 POSITION POSITION < 1.02 CMM 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
N
INPROCES
HOLE ∅10.43 / S IN-PROCESS OPERATOR &
8 HOLE PLUG GAUGE 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
10.24
N
INPROCES
RECEIVING S IN-PROCESS OPERATOR &
9 POSITION POSITION < 0.2 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
GAUGE
N
INPROCES
RECEIVING S IN-PROCESS OPERATOR &
10 PCD PCD ∅121.23 5 5 / LOT INSPECTIO INSP RECORD INSPECTOR
GAUGE
N
BRUSH 2
60B PACKING
1. STOP THE PROCESS.
DESPATCH OK INPROCES
2. INFORM TO SUPERVISOR
DESPATCH S OPERATOR &
LOT AS PER COUNTING 100% 100% INSPECTIO
CHALLEN
INSPECTOR
3. CHECK 100% FOR VARIATION.
QUANTITY 4. SEGREGATE THE LOT.
CHALLEN N
5. DESPATCH OK LOT ONLY.
PREPARED BY: Sunil Durge REVIEWED BY : Ameya Patil APPROVED BY : Virendra Patil