Offsites Engineering Works For The Erbil Refinery 40,000 B/D Expansion Project

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Company: Project: Engineering Contractor:

OFFSITES ENGINEERING WORKS


FOR THE ERBIL REFINERY
40,000 B/D EXPANSION PROJECT

Contract no.: 10J01762-01


Company doc. no.: Job no.: 10J01762 Engineering doc. no.:
N/A Sheet 1 of 5 10J01762-MAC-DS-000-003

OFFSITES ENGINEERING WORKS FOR THE


ERBIL REFINERY 40,000 B/D EXPANSION PROJECT

DIESEL FUEL TRANSFER PUMPS - DATA SHEET

D0 20/05/2011 Approved for Design G.Bonci G.Bonci F.Cilia


C0 29/04/2011 Issued for Company approval L.Ricci G.Bonci F.Cilia
REV. DATE REVISION TITLE PREPARED CHECKED APPROVED
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
DIESEL FUEL TRANSFER PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 2 to 5 10J01762-MAC-DS-000-003
CENTRIFUGAL PUMP PROCESS DATA SHEET (SI UNITS) - API 610 (10th edit.)
1 APPLICABLE TO: l PROPOSALS  PURCHASE  AS BUILT DOCUMENT NUMBER / INQUIRY NO.
2 ITEM NO.(S) P-2314 A/B Q.TY 2
3
4 SITE ERBIL REFINERY EXPANSION PROJECT - IRAQ SERVICE DIESEL FUEL TRANSFER

- electric
5 NOTES: INFORMATION motor
BELOW driver,75
TO BE kW
COMPLETED: and
above, shall be provided
BY PURCHASER with space heaterand
BY MANUFACTURER one PTC for phase
BY MANUFACTURER OR PURCHASER

6  DATA SHEETS REVISIONS

7 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED NO. DATE BY

8 PUMP P-2314 A/B l   1 29/04/11


9 MOTOR    2 20/05/11
10 GEAR    3
11 TURBINE    4
12 APPLICABLE OVERLAY STANDARD(S): 5
13  OPERATING CONDITIONS (5.1.3)  LIQUID (5.1.3)
14 FLOW, NORMAL (m3/h) RATED 120 (m3/h) LIQUID TYPE OR NAME

15
16 OTHER  HAZARDOUS l FLAMMABLE  (5.1.5)

17 SUCTION PRESSURE MAX./RATED 0,7 / 0 (barg) MIN. NORMAL MAX.


18 DISCHARGE PRESSURE 4,79 / 5,49 (barg) PUMPING TEMP (°C) 38 50
19 DIFFERENTIAL PRESSURE 4,79 (bar) VAPOUR PRESS. (bar) 0,1
20 DIFF. HEAD 60 (m) NPSHA 10 (m) DENSITY (kg/m3) 814
21 PROCESS VARIATIONS (5.1.4) VISCOSITY (mPa.s) 2,2
22 STARTING CONDITIONS (5.1.4) SPECIFIC HEAT, Cp (kJ/kg.K)
23 SERVICE:  CONT. l INTERMITTENT (STARTS/DAY)  CHLORIDE CONCENTRATION (6.5.2.4) (mg/kg)
24  PARALLEL OPERATION REQ'D (5.1.13)  H2S CONCENTRATION (mol fraction) WET (5.12.1.12c)

25
26  SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT (5.12.1.9)

27 LOCATION: (5.1.30) MATERIALS (5.12.1.1)

28  INDOOR  HEATED l OUTDOOR  UNHEATED l ANNEX H CLASS (5.12.1.1) S1


29  ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) l MIN DESIGN METAL TEMP (5.12.4.1) 0 (°C)
30 CL 1 GR DIV 2  REDUCED HARDNESS MATERIALS REQ'D. (5.12.1.12)
31  WINTERIZATION REQ'D l TROPICALIZATION REQ'D. BARREL/CASE C.S. IMPELLER C.I.
32 SITE DATA (5.1.30) CASE/IMPELLER WEAR RINGS
33  ALTITUDE 330 (m) BAROMETER (bar) SHAFT
34  RANGE OF AMBIENT TEMPS: MIN/MAX. 0 / 50 (°C) DIFFUSERS
35  RELATIVE HUMIDITY: MIN / MAX 20 / 65 (%)

36 UNUSUAL CONDITIONS: (5.1.30)  DUST  FUMES  PERFORMANCE:

37  OTHER PROPOSAL CURVE NO. r/min


38 IMPELLER DIA. RATED MAX. MIN. (mm)
39 IMPELLER TYPE
40  DRIVER TYPE RATED POWER (kW) EFFICIENCY (%)
41 l INDUCTION MOTOR  STEAM TURBINE  GEAR MINIMUM CONTINUOUS FLOW:
42  OTHER THERMAL (m3/h) STABLE (m3/h)
43 PREFERRED OPER. REGION TO (m3/h)
44  MOTOR DRIVER (6.1.1 / 6.1.4) ALLOWABLE OPER. REGION TO (m3/h)
45  MANUFACTURER MAX HEAD @ RATED IMPELLER (m)
46 37 (kW) 1500 (r/min) MAX POWER @ RATED IMPELLER (kW)
47 FRAME l ENCLOSURE IP54 (minimum) NPSHR AT RATED FLOW (m) (5.1.10)

48  HORIZONTAL  VERTICAL l SERVICE FACTOR 1 l MAX. SUCTION SPECIFIC SPEED: ACCOR. API (5.1.11)

49 l VOLTS/PHASE/HERTZ 400 / 3PH / 50 l MAX. SOUND PRESS. LEVEL REQ'D 85 @ 1m (dBA) (5.1.16)

50  TYPE  EST MAX SOUND PRESS. LEVEL (dBA) (5.1.16)

51  MINIMUM STARTING VOLTAGE (6.1.5) -20%  EST MAX SOUND POWER LEVEL (dBA) (5.1.16)

52 l INSULATION F l TEMP. RISE B  UTILITY CONDITIONS (5.1.3)

53  FULL LOAD AMPS ELECTRICITY VOLTAGE PHASE HERTZ


54 l LOCKED ROTOR AMPS 6 TIME RATED CURRENT DRIVERS
55 l STARTING METHOD DOL HEATING 230 1PH 50
56
57  LUBE LIFE LUBRICATED (PREFERRED) SYSTEM VOLTAGE DIP  80%  OTHER (6.1.5)

58 BEARINGS (TYPE/NUMBER): STEAM MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.
59 RADIAL / DRIVERS
60 THRUST / HEATING
61 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE
62 UP (N) DOWN (N) SUPPLY TEMP. (°C) MAX. RETURN TEMP. (°C)
63 NORM. PRESS. (bar) DESIGN PRESS. (bar)
64 MIN. RET. PRESS. (bar) MAX. ALLOW. D.P. (bar)
65 CHLORIDE CONCENTRATION: (mg/kg)
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
DIESEL FUEL TRANSFER PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 3 to 5 10J01762-MAC-DS-000-003
NOTES
1
2
3
4 Each unit supply shall include, but not be limited to the following:
5 - pump
6 - sealing system according to API std. 682
7 - electric motor driver,75 kW and above, shall be provided with space heater and one PTC for phase
8 - steel diaphragm flexible type coupling with spacer and no sparking type coupling guard
9 - fabricated steel base plate common to pump, driver and all mechanical seal auxiliaries (DRAIN RIM)
10 - lubrication system
11 - casing drains connections provided with valves and flanges, extended to terminate at the base plate edge
12 - casing vents provided with valves and flanges
13 - locally mounted instruments and safety devices, if any
14 - interconnecting auxiliary piping inside the unit assembly shall be 316L S.S. made and
15 flanged (3/4” min.) at base plate edge
16 - set of special tools necessary for the installation, commissioning and maintenance
17 - spare parts for commissioning
18 - spare parts for two years operation (separate quotation)
19 - all necessary equipment to ensure the respect of the noise levels limits
20 - painting
21 - shop tests and inspections
22 - Sub-Manufacturers coordination
23 - Engineering services (all necessary design drawings and documents, certified control
24 inspection and testing, operation and four copies of maintenance manuals, etc.)
25 - Power rating, speed are indiative only. To be verified/confirmed by Manufacturer
26 - The electric motor shall be installed in Zone 2 (Minimum),
27 The degree of protection shall be adeguate : Ex d/e IIB T3
28 - SEALING SYSTEM INSTRUMENTATION CHARACTERISTICS:
29 Instrument symbols and identification shall be in accordance with ISA S.5.1 (please, refers to project
30 document 10J01762-PRO-DW-000-001_3 - Symbol and legend for P&IDs (Instrumentation)).
31 All instruments shall be identified by tag numbers using stainless steel tag attached to the instrument.
32 Electrical field instruments shall be certified flameproof enclosures type (Ex-d IIB T3 min, to be
33 confirmed later). Mechanical protection shall be IP-65 (min) as per IEC 60529 for electronic instruments
34 and IP-55 (min) for mechanical instruments. Instrument electrical connections shall have isometric thread
35 ISO M20. Switches shall be provided with hermetically sealed voltage free contacts, single pole,
36 double throw (SPDT), rating 2A@24VDC. Technical bulletins, material certificates, mechanical/electrical
37 protection certificates, calibration certificates for instrumentation shall be as per purchaser requisition
38 documents.
39 - NPSHA is preliminary and will be confirmed when detail engineering of pump station will be completed
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
DIESEL FUEL TRANSFER PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 4 to 5 10J01762-MAC-DS-000-003

SINGLE STAGE OVERHUNG (TYPE OH)


1 CONSTRUCTION SURFACE PREPARATION AND PAINT

2 ROTATION: (VIEWED FROM COUPLING END) CW CCW  MANUFACTURER'S STANDARD  OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) l SPECIFICATION NO. BY COMPANY
4 l OH2  OH3  OH6  OTHER PUMP:

5 CASING MOUNTING:  PRIMER


6 l CENTERLINE  IN-LINE OTHER  FINISH COAT
7 BASEPLATE: (6.3.17)
8 CASING TYPE:  PRIMER
9 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER  FINISH COAT
10 CASE PRESSURE RATING:  DETAILS OF LIFTING DEVICES(6.3.20)
11  OH6 PUMP SUCTION REGION DESIGNED FOR MAWP (5.3.6) SHIPMENT: (7.4.1)

12 MAX ALLOWABLE WORKING PRESSURE (bar)  DOMESTIC l EXPORT l EXPORT BOXING REQUIRED
13 @ (°C)  OUTDOOR STORAGE MORE THAN 6 MONTHS
14 HYDROTEST PRESSURE (bar) SPARE ROTOR ASSEMBLY PACKAGED FOR:
15 NOZZLE CONNECTIONS: (5.4.2)  HORIZONTAL STORAGE  VERTICAL STORAGE
16 SIZE FLANGE FAC'G POSITION  TYPE OF SHIPPING PREPARATION
17 RATING

18 SUCTION HEATING AND COOLING

19 DISCHARGE  HEATING JACKET REQ'D. (5.8.9)


20  COOLING REQ'D.
21 PRESSURE CASING AUX. CONNECTIONS: (5.4.3)  COOLING WATER PIPING PLAN (6.5.3.1)
22 NO. SIZE (DN) TYPE C.W. PIPING:
23 l DRAIN 1 3/4" 150 RF  PIPE  TUBING; FITTINGS

24 l VENT 1 3/4" 150 RF C.W. PIPING MATERIALS:

25  WARM-UP  S. STEEL  C. STEEL  GALVANIZED


26 COOLING WATER REQUIREMENTS:
27  MACHINED AND STUDDED CONNECTIONS (5.4.3.8) BEARING HOUSING (m3/h)

28  CYLINDRICAL THREADS REQUIRED (5.4.3.3) HEAT EXCHANGER (m3/h)


29 ROTOR: TOTAL COOLING WATER (m3/h)

30  COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) HEAT MEDIUM:  STEAM  OTHER
31 COUPLINGS:(6.2.2) HEATING PIPING:  TUBING  PIPE
32 l MANUFACTURER META or EQU.  MODEL BEARINGS AND LUBRICATION
33 RATING (kW per 100 r/min) BEARING (TYPE/NUMBER) (5.10.1):

34  SPACER LENGTH (mm)  SERVICE FACT. RADIAL /


35  COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) THRUST /
36  COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.11) LUBRICATION (5.11.3, 5.11.4):
37  COUPLING PER ISO 14691 (6.2.4)  GREASE l OIL
38  COUPLING PER ISO 10441 (6.2.4)  PURGE OIL MIST  PURE OIL MIST
39  COUPLING PER API 671 (6.2.4)  ASME B15.1  CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):
40  NON SPARK COUPLING GUARD (6.2.14c) l OIL VISC. ISO GRADE 32
41  COUPLING GUARD STANDARD PER (6.2.14a) INSTRUMENTATION

42 BASEPLATES:  ACCELEROMETER (6.4.2.1)


43 API BASEPLATE NUMBER (ANNEX D) l PROVISION FOR MOUNTING ONLY (5.10.2.11)
44  NON-GROUT CONSTRUCTION (6.3.13)  FLAT SURFACE REQ'D (5.10.2.12)
45  OTHER  TEMP. GAUGES (WITH THERMOWELLS) (8.1.3.6)
46 MECHANICAL SEAL:(5.8.1)  PRESSURE GAUGE TYPE
47  SEE ATTACHED ISO 21049/API 682 DATA SHEET
48
49 - API FLUSH PLAN 11/61 REMARKS:
50 - SEAL CODE C1A1A
51 - SEAL CONFIGURATION 1CW-FX MASSES
52 - SEAL LEAKAGE DETECTION 65 MASS OF PUMP (kg)
53 - VENDOR SHALL SEND API 682 DATA MASS OF BASEPLATE (kg)
54 SHEET AND CONFIRM THE MASS OF DRIVER (kg)
55 SELECTION TOTAL MASS (kg)
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
DIESEL FUEL TRANSFER PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 5 to 5 10J01762-MAC-DS-000-003

SINGLE STAGE OVERHUNG (TYPE OH)


1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.)

2 l START-UP l NORMAL MAINTENANCE(1) TEST NON-WIT WIT OBSERVE

3 l HYDROSTATIC (7.3.2)  l 
4 OTHER PURCHASER REQUIREMENTS l PERFORMANCE (7.3.3)  l 
5 l COORDINATION MEETING REQUIRED (9.1.3)  RETEST ON SEAL   
6  MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) LEAKAGE (7.3.3.2d)

7  MAX RELATIVE DENSITY l NPSH (7.3.4.2) (2)  l 


8  MAX DIA. IMPELLERS AND/OR NO OF STAGES  TRUE PEAK VELOCITY   
9  OPERATION TO TRIP SPEED DATA (7.3.3.4d)

10  OH3 BEARING HS6 LIFTER (8.1.2.6)  COMPLETE UNIT TEST (7.3.4.3)   


11  CONNECTION DESIGN APPROVAL (5.12.3.4) l SOUND LEVEL TEST (7.3.4.4) (3)   l
12  TORSIONAL ANALYSIS REQUIRED (5.9.2.1) l CLEANLINESS PRIOR TO   l
13  TORSIONAL ANALYSIS REPORT (5.9.2.6) FINAL ASSEMBLY (7.2.2.2)

14  PROGRESS REPORTS (9.3.3)  NOZZLE LOAD TEST (6.3.6)   


15  OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5)  CHECK FOR CO-PLANAR   
16  ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.1.1f)  MOUNTING PAD SURFACES (6.3.3)
17 PIPING AND APPURTENANCES  MECHANICAL RUN UNTIL OIL   
18 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) TEMP. STABLE (7.3.4.7.1)

19  VENT  DRAIN  COOLING WATER  4 HR. MECHANICAL RUN AFTER   


20  MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) OIL TEMP. STABLE (7.3.4.7.3)

21  FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8)  4 HR. MECH. RUN TEST(7.3.4.7.2)   
22  INSTALLATION LIST IN PROPOSAL (9.2.3L)  BRG HSG RESONANCE   
23 CONNECTION BOLTING TEST (7.3.4.6)

24  PTFE COATING l ASTM A153 GALVANIZED  AUXILIARY EQUIPMENT   


25  PAINTED  SS TEST (7.3.4.5)
26 QA INSPECTION AND TESTING  IMPACT TESTING (5.12.4.3)   
27 l SHOP INSPECTION (7.1.4)  PER EN 13445
28  PERFORMANCE CURVE APPROVAL  PER ASME VIII
29 TEST WITH SUBSTITUTE SEAL (7.3.3.2b)    
30 l MATERIAL CERTIFICATION REQUIRED (5.12.1.8)  VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
31 l CASING l IMPELLER l SHAFT l VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
32  OTHER  VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
33  CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)  INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
34  INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) l SUBMIT INSPECTION CHECK LIST (7.1.6)

35  MAG PARTICLE  LIQUID PENETRANT


36  RADIOGRAPHIC  ULTRASONIC
37  INSPECTION REQUIRED FOR CASTINGS (7.2.1.3 / 5.12.1.5)

38  MAG PARTICLE  LIQUID PENETRANT

39  RADIOGRAPHIC  ULTRASONIC
40  HARDNESS TEST REQUIRED: (7.2.2.3)
41  ADDITIONAL SUBSURFACE EXAMINATION FOR 7.2.1.3
42 FOR
43 METHOD
44
45 REMARKS
46 (1) SEPARATE QUOTATION FOR TWO YEARS OPERATION
47 (2) TEST SHALL BE PERFROMED ONLY IF NPSHA-NPSHR<1M
48 (3) ACCORDING TO ISO 3744
49
50
51
52
53
54
55
56

You might also like