Offsites Engineering Works For The Erbil Refinery 40,000 B/D Expansion Project
Offsites Engineering Works For The Erbil Refinery 40,000 B/D Expansion Project
Offsites Engineering Works For The Erbil Refinery 40,000 B/D Expansion Project
- electric
5 NOTES: INFORMATION motor
BELOW driver,75
TO BE kW
COMPLETED: and
above, shall be provided
BY PURCHASER with space heaterand
BY MANUFACTURER one PTC for phase
BY MANUFACTURER OR PURCHASER
7 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED NO. DATE BY
15
16 OTHER HAZARDOUS l FLAMMABLE (5.1.5)
25
26 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT (5.12.1.9)
48 HORIZONTAL VERTICAL l SERVICE FACTOR 1 l MAX. SUCTION SPECIFIC SPEED: ACCOR. API (5.1.11)
49 l VOLTS/PHASE/HERTZ 400 / 3PH / 50 l MAX. SOUND PRESS. LEVEL REQ'D 85 @ 1m (dBA) (5.1.16)
51 MINIMUM STARTING VOLTAGE (6.1.5) -20% EST MAX SOUND POWER LEVEL (dBA) (5.1.16)
58 BEARINGS (TYPE/NUMBER): STEAM MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.
59 RADIAL / DRIVERS
60 THRUST / HEATING
61 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE
62 UP (N) DOWN (N) SUPPLY TEMP. (°C) MAX. RETURN TEMP. (°C)
63 NORM. PRESS. (bar) DESIGN PRESS. (bar)
64 MIN. RET. PRESS. (bar) MAX. ALLOW. D.P. (bar)
65 CHLORIDE CONCENTRATION: (mg/kg)
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
DIESEL FUEL TRANSFER PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 3 to 5 10J01762-MAC-DS-000-003
NOTES
1
2
3
4 Each unit supply shall include, but not be limited to the following:
5 - pump
6 - sealing system according to API std. 682
7 - electric motor driver,75 kW and above, shall be provided with space heater and one PTC for phase
8 - steel diaphragm flexible type coupling with spacer and no sparking type coupling guard
9 - fabricated steel base plate common to pump, driver and all mechanical seal auxiliaries (DRAIN RIM)
10 - lubrication system
11 - casing drains connections provided with valves and flanges, extended to terminate at the base plate edge
12 - casing vents provided with valves and flanges
13 - locally mounted instruments and safety devices, if any
14 - interconnecting auxiliary piping inside the unit assembly shall be 316L S.S. made and
15 flanged (3/4” min.) at base plate edge
16 - set of special tools necessary for the installation, commissioning and maintenance
17 - spare parts for commissioning
18 - spare parts for two years operation (separate quotation)
19 - all necessary equipment to ensure the respect of the noise levels limits
20 - painting
21 - shop tests and inspections
22 - Sub-Manufacturers coordination
23 - Engineering services (all necessary design drawings and documents, certified control
24 inspection and testing, operation and four copies of maintenance manuals, etc.)
25 - Power rating, speed are indiative only. To be verified/confirmed by Manufacturer
26 - The electric motor shall be installed in Zone 2 (Minimum),
27 The degree of protection shall be adeguate : Ex d/e IIB T3
28 - SEALING SYSTEM INSTRUMENTATION CHARACTERISTICS:
29 Instrument symbols and identification shall be in accordance with ISA S.5.1 (please, refers to project
30 document 10J01762-PRO-DW-000-001_3 - Symbol and legend for P&IDs (Instrumentation)).
31 All instruments shall be identified by tag numbers using stainless steel tag attached to the instrument.
32 Electrical field instruments shall be certified flameproof enclosures type (Ex-d IIB T3 min, to be
33 confirmed later). Mechanical protection shall be IP-65 (min) as per IEC 60529 for electronic instruments
34 and IP-55 (min) for mechanical instruments. Instrument electrical connections shall have isometric thread
35 ISO M20. Switches shall be provided with hermetically sealed voltage free contacts, single pole,
36 double throw (SPDT), rating 2A@24VDC. Technical bulletins, material certificates, mechanical/electrical
37 protection certificates, calibration certificates for instrumentation shall be as per purchaser requisition
38 documents.
39 - NPSHA is preliminary and will be confirmed when detail engineering of pump station will be completed
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
DIESEL FUEL TRANSFER PUMPS - DATA SHEET
Company doc. no.: Rev.: C0 D0 Engineering doc. no.:
N/A Sheet 4 to 5 10J01762-MAC-DS-000-003
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) l SPECIFICATION NO. BY COMPANY
4 l OH2 OH3 OH6 OTHER PUMP:
12 MAX ALLOWABLE WORKING PRESSURE (bar) DOMESTIC l EXPORT l EXPORT BOXING REQUIRED
13 @ (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS
14 HYDROTEST PRESSURE (bar) SPARE ROTOR ASSEMBLY PACKAGED FOR:
15 NOZZLE CONNECTIONS: (5.4.2) HORIZONTAL STORAGE VERTICAL STORAGE
16 SIZE FLANGE FAC'G POSITION TYPE OF SHIPPING PREPARATION
17 RATING
30 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) HEAT MEDIUM: STEAM OTHER
31 COUPLINGS:(6.2.2) HEATING PIPING: TUBING PIPE
32 l MANUFACTURER META or EQU. MODEL BEARINGS AND LUBRICATION
33 RATING (kW per 100 r/min) BEARING (TYPE/NUMBER) (5.10.1):
3 l HYDROSTATIC (7.3.2) l
4 OTHER PURCHASER REQUIREMENTS l PERFORMANCE (7.3.3) l
5 l COORDINATION MEETING REQUIRED (9.1.3) RETEST ON SEAL
6 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) LEAKAGE (7.3.3.2d)
21 FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) 4 HR. MECH. RUN TEST(7.3.4.7.2)
22 INSTALLATION LIST IN PROPOSAL (9.2.3L) BRG HSG RESONANCE
23 CONNECTION BOLTING TEST (7.3.4.6)
39 RADIOGRAPHIC ULTRASONIC
40 HARDNESS TEST REQUIRED: (7.2.2.3)
41 ADDITIONAL SUBSURFACE EXAMINATION FOR 7.2.1.3
42 FOR
43 METHOD
44
45 REMARKS
46 (1) SEPARATE QUOTATION FOR TWO YEARS OPERATION
47 (2) TEST SHALL BE PERFROMED ONLY IF NPSHA-NPSHR<1M
48 (3) ACCORDING TO ISO 3744
49
50
51
52