The document provides an organization chart for an emergency response team for a transmission line construction project. The emergency commander heads the team, which includes responders for fire, first aid, and emergency evacuation. The first aider's name and contact number are included at the bottom of the chart.
The document provides an organization chart for an emergency response team for a transmission line construction project. The emergency commander heads the team, which includes responders for fire, first aid, and emergency evacuation. The first aider's name and contact number are included at the bottom of the chart.
The document provides an organization chart for an emergency response team for a transmission line construction project. The emergency commander heads the team, which includes responders for fire, first aid, and emergency evacuation. The first aider's name and contact number are included at the bottom of the chart.
The document provides an organization chart for an emergency response team for a transmission line construction project. The emergency commander heads the team, which includes responders for fire, first aid, and emergency evacuation. The first aider's name and contact number are included at the bottom of the chart.
Download as DOC, PDF, TXT or read online from Scribd
Download as doc, pdf, or txt
You are on page 1/ 1
HG Power Transmission Sdn. Bhd.
Client : Tenaga Nasional Berhad Date : 01/10/2018
Contract Title 500kV Double Circuit Transmission Line from PMU Bentong South to PMU Lenggeng (Point L to : LGNG) and 275kV Double Circuit Transmission Line from PMU Lenggeng to PMU Mahkota Cheras Page : 1 Of 1 (Point L to Lenggeng) Doc. Contract No : TNB 369/2018 : ERT/01/REV1 No. EMERGENCY RESPONSE TEAM Organization Chart