This maintenance report documents an inspection of an air conditioning unit. It records measurements of electrical currents and voltages, refrigerant pressures and temperatures, water inlet and outlet temperatures, and checks the operation of components like compressors, fans, valves and sensors. The inspection found the unit to be functioning normally with measurements within expected ranges. Minor suggestions were made but no issues requiring repairs were identified. The customer and engineer signed off on the report, confirming the maintenance check was completed satisfactorily.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
645 views2 pages

Climaveneta Mainternance Check List

This maintenance report documents an inspection of an air conditioning unit. It records measurements of electrical currents and voltages, refrigerant pressures and temperatures, water inlet and outlet temperatures, and checks the operation of components like compressors, fans, valves and sensors. The inspection found the unit to be functioning normally with measurements within expected ranges. Minor suggestions were made but no issues requiring repairs were identified. The customer and engineer signed off on the report, confirming the maintenance check was completed satisfactorily.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MAINTENANCE REPORT

Date: …./…./……..

Contract No: ___________________________________________________________________


Customer Name: ___________________________________________________________________
Model: ___________________________________________________________________
Series Number: ___________________________________________________________________
Working period: From: …./…./…….. To: …./…./……..

I./ GENERAL INSPECTION


No Items Yes No
1 Check unit appearance whether leakage  
2 Check sight glass is normal  
3 Unit operating voltage (400V +/-2%) U1: U2: U3:
4 Unit operating current (at starting) I1: I2: I3:
5 Unit operating current (at 100%) I1: I2: I3:

II./ COMPRESSOR
No. Items
1 Electrical insulation >=2M Mega ohm L1: L2: L3:
2 Compressor running current. C1: C2: C3:
3 Record and calibrate operating low/high pressure. L: Bar H: Bar
o o
4 Record and calibrate operating suction/ exhaust temp. S: C D: C
5 Refrigeration oil level L M H
6 Refrigeration oil color

7 Compressor running vibration/ noise


8 Solenoid valve working condition when 25% 50% 75% 100%
compressor loading & unloading    
(normal/abnormal)
9 Compressor running time C1: C2: C3: C4:

III./ HEAT EXCHANGER


No. Items
1 Evaporator water inlet/outlet temp (delta T: 3-5oC) In: Out:
2 Evaporator water inlet/outlet pressure (delta T: 0.5-1oBar) In: Out:
3 Condenser water inlet/outlet temp (delta T: 3-5oC) In: Out:
4 Condenser water inlet/outlet pressure (delta T: 0.5-1oBar) In: Out:
Yes No
5 Chilled water quality (normal/abnormal)  
6 Fan blade damaged condition & noise if have (normal/abnormal)  
7 Fan operating current (if have)
F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16

After Sales Department


IV./ ACCESSORIES (VALVE, GAUGE AND SENSOR):
No. Items Yes No
1 Refrigerant flow condition varied with expansion valve opening  
(normal/abnormal)
2 Four‐way valve coil switch action (normal/abnormal)  
3 Solenoid valve ON/OFF switch (normal/abnormal)  
4 Pressure gauge calibration (have/not)  
5 Sensor calibration (have/not)  
6 Electrical simulation test (have/not)  