Epc-Project-Executionpdf - The Execution of A Complex Project Guided Tour
Epc-Project-Executionpdf - The Execution of A Complex Project Guided Tour
Epc-Project-Executionpdf - The Execution of A Complex Project Guided Tour
Sanction Sanction
Construction &
Installation Inspection & tests Hand-over
erection
Project Control
PROJECT
Shipyard (Korea)
Hull Engineering & Fabrication
Satellite office
Detail Engineering (part)
Offshore (Nigeria):
Project
Project
Pressure (bar)
Feedstock and products flow 45 buildings
Feedstock composition 40
Control room
35
Battery limit conditions Access road
30
Equipment Spare 25 Site fencing, gates, check point
20
Performance: 15
Design criteria:
10
Products specifications % of over design
5
Energy efficiency, emissions
0
-85 -80 -75 -70 -65 -60 -55
Environment data:
Utilities: Min/max temperature
Electric power supply Rain/snow fall
Other utilities Wind
Geological conditions
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Equipment
duty
Piping &
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Rotating machinery
Process data
sheet
Mechanical
data sheet
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Structural
Architectural drawings
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Layout/
principles
Piping Layout
drawing
3D model review
P*D
t=
(2SWE + PY)
P design pressure
D (outside) diameter
S stress value for material as per table in ASME B31.3
W weld joint reduction factor – for long term strength of weld at elevated temperature
E quality factor, from table in ASME B31.3 (1 for seamless, 0.85 for ER welded pipe, etc.)
Y coefficient from table in ASME B31.3 (from 0.4 to 0.7 depending on material and
temperature)
Piping General
Arrangement drawing
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
Marshalling Controller
cabinet cabinet
VDU
PT JB
Process
line CPU
LAN
Secondary cable
Multi cable
Project
Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping
General One
Line Diagram
Equipment
specification
Switchgear
Transformer
Electrical
Control System
Process design
PFDs
H&M balance
Process design
PFDs
H&M balance
Equipment specification
Process
data sheet
Rotating
Pressure vessels
Fired equipment
Process design
PFDs P&IDs
H&M balance
Process design
PFDs P&IDs
H&M balance
Piping
Instrumentation
Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil
PR = Process,
EQ = Equipment,
PL = Plant Layout,
PI = Piping,
I&C = Instrumentation
& Control,
EL = ELectrcial,
HSE = Safety &
Environment,
CIV = Civil
Process design
PFDs P&IDs
H&M balance
Piping
Instrumentation
Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil
Electrical
Civil
Electrical Process
General
Arrangement P&ID
Layout Functional analysis Instrumentation
Vendor & Control
C&E
Piping
Terminals dwgs
Purchaser Mechanical
connection list and
dwg
Civil
HERVE Interested and wanting to know more on Engineering?
BARON
270 pages
300 illustrations
http://www.editionstechnip.com/en/catal
ogue-detail/1111/oil-gas-engineering-
guide-the.html
Project
Technical Compliance
Price
Qualification of supplier
Schedule
Load of workshop
References
References with final Client
Financial situation
Project
Sand
Aggregate
Cement
Admixtures
Sub-System
Document Folder
Instrument
Loop
Project Control
PROJECT
Project
Manager
Construction
Process
Superintendent
Construction
Civil
supervisor
Construction
Instrumentation
superintendent
Construction
Electrical
supervisor
Temperature
Sampling
Slump
P.O.
P.O.
Purchase
Orders P.O.
EPC
Sub-Contracts
Main Contract Sub
Terms and
Conditions
Price
Schedule
Performance
guarantees
EPC
Technical
Main Contract
basis
Specifications,
codes & stds
E P C
Civil
Mechanical
E&I
General
Contractor
EPC
Main Contract
Discipline code
A Instrumentation & Control
C Civil engineering
E Electrical
G Project general documents
J Mechanical
K Safety
Client
Documents Approval/
submitted
to client Comments
Engineering
Documents
Comments
Vendors
HERVE
BARON Electronic Document Management System
Center 1 Sr.
Mgmt Center 2 Sr. Correspondence
Intranet / Mgmt
etc.
Internet
Electronic Document
Management System
Breakdown Projects
structures
Engineering
Reports
documents
Interfaces
2 3
TECHNICAL & COMMERCIAL CLARIFICATIONS X X
CALL FOR TENDER FOR PIPING MATERIAL
PREPARE PIPING MATERIAL TAKE-OFF X
PIPING ROUTING STUDIES 1 X X X
PIPING & INSTRUMENTATION DIAGRAMS (PIDs)
1 3 5
4 5
2
Today: 3D
Tomorrow:
15 years ago: 2D
3D & data
Runner
Bearer
Project Manager
40-45 yrs old
Discipline
presentation:
activities and
deliverables
Difference between
Engineering and Shop
drawings
http://www.editionstechnip.com/en/catal
ogue-detail/1111/oil-gas-engineering-
guide-the.html