Civil PPM Checklist 01
Civil PPM Checklist 01
Civil PPM Checklist 01
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
( Civil Technician ) ( Civil Supervisor )
Name: Name:
Date: Date:
KOMPLEKS PERDANA PUTRA
GREASE TRAP, PIPING AND FLOOR TRAPS
Location: Inspection Date:
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI45(01)
T PLANT
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KFM/P7.5.1/MI46(01)
TRAPS
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
CARPET AND TIMBER STRUCTURE CHECKLIST
Location: Inspection Date:
2 TIMBER STRUCTURE
a) Inspect for termite attack and give treatment if
necessary.
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI47(01)
CKLIST
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
DRAINS,SUMPS,GRATING AND CULVERT CHECKLIST
Location: Inspection Date:
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI48(01)
CHECKLIST
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
2 WALL
2.1 Brick Wall (Including Tiled Wall)
a) Inspect for cracks and deflaction. Repair or
replace if necessary.
b) Inspect for defective finishes. Repair or
replace if necessary.
2.2 Curtain Wall, Windows and Glazing
a) Inspect for cracks and replace defective
glass panels if necessary.
b) Inspect for leakage and repair or replace
gasket / adhesives if necessary.
c) Inspect accessories and fixtures and repair
or replace if necessary.
d) Inspect for corrosion and repair if
necessary.
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI50(01)
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
2 CEILING
a) Inspect ceiling structures. Repair or
replace if necessary.
b) Inspect ceiling finishes inclusive of
cornices, etc and repair or replace if
necessary.
c) Inspect ceiling boards. Repair or replace if
necessary.
d) Inspect for hangers and fixtures to soffit of
slab.
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI51(01)
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI52(01)
ECKLIST
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI53(01)
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
3 PAINTING TOUCH-UP
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI54(01)
UCH-UP CHECKLIST
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
BUILT IN FURNITURE
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI55(01)
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI56(01)
A
Remark/No-Comformance
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date:
KOMPLEKS PERDANA PUTRA
REMARK / NON-CONFERMANCE
VERIFICATION
Prepared by: Checked by:
Name: Name:
Date: Date:
KFM/P7.5.1/MI57(01)
Remark/No-Comformance
Verified by:
( Civil Engineer/Executive )
Name:
Date: