Jindal Power Limited (4X600MW) : C&I Commissioning/Protocol/LORV C&I Plant Interlock & Protection

The document discusses commissioning procedures for control and instrumentation (C&I) systems at a 4x600MW power plant. It outlines interlock and protection protocols for the C&I plant, including automatic stop conditions triggered by low oil reservoir volume not closing within set timer values during simulation and commissioning checks of auto start, alarm, sequence of events, and trend printing status. Representatives from BHEL, C&I erection, mechanical commissioning, and C&I commissioning must sign off.

Uploaded by

jp mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
157 views1 page

Jindal Power Limited (4X600MW) : C&I Commissioning/Protocol/LORV C&I Plant Interlock & Protection

The document discusses commissioning procedures for control and instrumentation (C&I) systems at a 4x600MW power plant. It outlines interlock and protection protocols for the C&I plant, including automatic stop conditions triggered by low oil reservoir volume not closing within set timer values during simulation and commissioning checks of auto start, alarm, sequence of events, and trend printing status. Representatives from BHEL, C&I erection, mechanical commissioning, and C&I commissioning must sign off.

Uploaded by

jp mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Jindal Power Limited (4X600MW)

C&I Commissioning/Protocol/LORV

C&I Plant Interlock & Protection

Auto Stop
Description Set Value Timer Simulation by Status Checked
Tag No. Auto Alarm SOE Trend Printer
Start
All LONV not closed
LORV close PB pressed
LOTV closing command
& LORV not closed

BHEL Representative C&I Erection Mech Commissioning C&I Commissioning


Name:-
Sign:-
Date:-