Hydro Test Procedure
Hydro Test Procedure
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
Client: PETROPEL
REV: 0.0
PTJ PTB
Name Amin Ahmed Reda Ismail
Signature
Date
1 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
TABLE OF CONTENT
2.0 Scope
6.0 Documentation
10.0 Pressurizing
11.0 Dewatering
13.0 Attachment.
2 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
LENGTH : 18.0 KM
VOLUME / KM : 55.6 M3
3 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
2.0 SCOPE
This scope covers Ras Gara 10 " new oil pipe line hydrostatic test carried out by
- Pressurizing.
- De watering.
5 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
This procedure for hydrostatic test written to meet the requirement for
- Client Specifications
- PETROJET Procedure
6 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
4.2 INSTRUMENTS
- No. Of (2) Pressure Gauge
- No. Of (2) Pressure Recorder
- No. Of (2) Temperature Recorder
- Dead Weight Tester.
7 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
All personnel involved in testing operation shall wear full safety including
The test cabin will be located in a save position approximate 20 mt. From
Warning signs ( written in both English & Arabic) will be erected outside
8 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
6.0 Documentation
All records for temporary launcher & receiver testing, pipe line cleaning, gauging,
pressurizing and any relevant comments will be completed into "test report" submitted
- After construction of temporary test head it will be filled with fresh water &
tested as one loop for one hour at the same test pressure of the pipe line.
- After the successful test of the temporary test head it will be separated and
- The temporary launcher & receiver will be welded at the two ends of the tested
section.
9 / 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
10/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
After gauging had been completed to satisfaction of the client , filling will start
The volume required to fill the pipe line will be calculated prior of filling
commencement
The filling pump will be connected to the pipe line
20 cubic meter of water will be inserted to the pipe line as flushing water.
The filling pig will be launched, and filling will be continued till the pig arrival at pig
receiver then the filling pump will stopped. The line is now completely filled with
water.
To ensure that the pipe line is free from the air entrapped, venting will be carried out
several times from launcher and receiver.
11/ 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
10.0 PRESSURIZING
Check that the pipe line has been completely back filled
Check that all temporary fitting has been removed.
Check that all instruments has calibration certificate and approved by the client.
Pressure pump and instruments at both ends of pipe line will be connected at safe
distance.
All fitting, hoses, and valves used during pressurizing pressure which exceeds the
max test pressure applied on pipe line.
All charts which used in recorders will be signed by client representative before
pressurizing commencement.
Pressurizing will be commencement at static head pressure.
Pressure will raised gradually with suitable rate to prevent sudden stress to pipe line
Pressurizing will be stopped at 80% of test pressure for one hour & visual check will
be carried out.
Pressurizing will be commencement again to 100% test pressure.
Pressure will be hold for 24 hour
Pressure will be beaded gradually to static pressure or as client requirement
At the end of the test cycle, all sheets & test certificate will be submitted to client
representative for sign and approval.
12/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
11.0 DE WATERING
After successful test, the pipe line will be cleaned from test water applying compressed
air and the pig will be pushed through the pipe line using compressed air.
If the valve room is not available for testing with the pipe line it will be pressure tested
separately as a loop for two hour at the same test pressure of the pipe line.
13/ 18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
13.0ATTACHMENTS
PIGGING OPERATION REGISTER
Wall thickness: ………mm Nominal diameter: ………..Inch
Grade: ………….
Section From: …… To: ……
Pig type
Inspected & Location
loaded
Date
Time
Location
Launched Date
Time
Pressure
Location
Received Date
Time
Pressure
Location
Inspected Date
Time
Condition
Petrojet Test Eng. Client Rep.
Name. Name.
Sign Sign
Date Date
Appendix (1)
14/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
Project:
Client:
SECTION ADTA
From: ………… To: ………………
Length: ……….Km.
Outside diameter: ………..mm.
Internal Diameter: ……… mm.
Wall thickness: …………..mm.
Grade: …………..
Gauge Plate Diameter. : ………..mm.
Gauge Plate Material. :……………
Name. Name.
Sign Sign
Date Date
Appendix (3)
15/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
Name. Name.
Sign Sign
Date Date
Appendix (2)
16/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
Name. Name.
Sign Sign
Date Date
Appendix (4)
17/18
Website: www.petrojet.com.eg
THE PETROLEUM PROJECTS & TECHNICAL شركة المشروعات البترولية و اإلستشارات الفنية
CONSULTATIONS CO.
اإلدارة العامة للمعدات
General Department of Equipment
قطاع اإلختبارات
…………….. بتـــروجــــــت
Date:
Project:
Client:
SECTION ADTA
From: ………… To: ………………
Length: ……….Km.
Outside diameter: ……… mm.
Internal diameter: ……… mm.
Wall thickness: ………….mm.
Grade: …………..
THE ABOVE MENTIONED SECTION HAS BEEN DEWATERED
FROM WATER ACCORDING TO.
CLIENT SPESIFICATION.
HYDROTEST PROCEDURE.
SATISFACTION OF CLIENT REP.
Petrojet Test Eng. Client Rep.
Name. Name.
Sign Sign
Date Date
Appendix (5)
18/18